 Bids For:  Location:   Lake Darling  Date: 10/4/2012  Project No.  
  Shoreline Armoring and PCC Paving  County:   WASHINGTON  Time: 11:00 A.M.  12-06-92-07

 

 
1
2
3
Estimated Cost: $3,800,000.00
Contractor: 
JB Holland Construction DeLong Construction IncWicks Construction Co
Funding Source: 100% Lake Restoration, 2092 HWY 9 West
1320 N 8th Ave
PO Box 488
PO Box 428
Decorah IA  52101Washington IA  52353Decorah IA  52101
Plan Sets Requested: 26
Quantities
563-382-2901319-653-3334563-382-2325
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Fishing Pier1L.S.$45,000.00$45,000.00 $4,000.00$4,000.00 $48,250.00$48,250.00 
2CLEAR+GRUBB6Acres$3,850.00$23,100.00 $1,075.00$6,450.00 $4,500.00$27,000.00 
3EXCAVATION, CL 10, RDWY+BORROW1977C.Y.$4.93$9,746.61 $3.35$6,622.95 $3.25$6,425.25 
4MODIFIED SUBBASE7.4C.Y.$27.55$203.87 $28.50$210.90 $26.50$196.10 
5GRANULAR SURF ON RD, CL A CR STONE1619Tons$14.75$23,880.25 $16.20$26,227.80 $15.00$24,285.00 
6APRON, METAL, 18"6Each$156.00$936.00 $70.00$420.00 $175.00$1,050.00 
7APRON, METAL, 24"2Each$223.00$446.00 $110.00$220.00 $220.00$440.00 
8CULV, CMP ENT, 18"63L.F.$23.25$1,464.75 $57.00$3,591.00 $28.00$1,764.00 
9CULV, CMP ENT, 24"45L.F.$27.25$1,226.25 $78.00$3,510.00 $30.00$1,350.00 
10SIDEWALK, PCC 5"6892.1S.Y.$24.75$170,579.475 $19.75$136,118.975 $19.75$136,118.975 
11SIDEWALK, PCC, 6"587S.Y.$26.75$15,702.25 $20.85$12,238.95 $20.85$12,238.95 
12SEED+FERTILIZE (URBAN)6Acres$1,419.00$8,514.00 $1,850.00$11,100.00 $1,850.00$11,100.00 
13CLEAR+GRUBB1.9Acres$3,850.00$7,315.00 $1,075.00$2,042.50 $4,500.00$8,550.00 
14EXCAVATION, CL 10, RDWY+BORROW12097C.Y.$1.00$12,097.00 $3.35$40,524.95 $3.25$39,315.25 
15ENGINEERING FABRIC6935S.Y.$1.25$8,668.75 $1.60$11,096.00 $1.80$12,483.00 
16REVETMENT, CLASS D4986Tons$21.75$108,445.50 $25.35$126,395.10 $25.00$124,650.00 
17SEED+FERTILIZE (URBAN)1.9Acres$1,419.00$2,696.10 $1,850.00$3,515.00 $0.00$0.00 
18BEACH SAND4560Tons$17.00$77,520.00 $16.70$76,152.00 $15.50$70,680.00 
19RAISE LIFT STATION, COMPLETE1L.S.$3,000.00$3,000.00 $6,850.00$6,850.00 $5,500.00$5,500.00 
20CLEAR+GRUBB6Acres$3,850.00$23,100.00 $1,075.00$6,450.00 $4,500.00$27,000.00 
21EXCAVATION, CL 10, RDWY+BORROW14815C.Y.$3.10$45,926.50 $3.35$49,630.25 $3.25$48,148.75 
22MODIFIED SUBBASE596C.Y.$27.55$16,419.80 $28.50$16,986.00 $26.50$15,794.00 
23SHLD CONSTRUCTION, EARTH6.61STA.$250.00$1,652.50 $140.75$930.358 $250.00$1,652.50 
24STD/S-F PCC PAV'T, CL C CL 3, 7"2980S.Y.$25.00$74,500.00 $23.90$71,222.00 $23.90$71,222.00 
25GRANULAR SURF ON RD, CL A CR STONE556.5Tons$14.75$8,208.375 $16.20$9,015.30 $15.00$8,347.50 
26STRUCT CONC (MISCELLANEOUS)160C.Y.$201.00$32,160.00 $300.00$48,000.00 $300.00$48,000.00 
27APRON, CONC, 12"1Each$350.00$350.00 $550.00$550.00 $300.00$300.00 
28INTAKE, SW5111Each$2,100.00$2,100.00 $2,500.00$2,500.00 $2,000.00$2,000.00 
29INTAKE, SW-512, 18"1Each$1,500.00$1,500.00 $1,260.00$1,260.00 $975.00$975.00 
30PILE, STEEL SHEET3800S.F.$36.00$136,800.00 $30.00$114,000.00 $22.00$83,600.00 
31SUBDRAIN, LONGITUDINAL, (SHLD) 4"660.8L.F.$3.32$2,193.856 $3.30$2,180.64 $3.30$2,180.64 
32SUBDRAIN OUTLET (RF-19C)6Each$160.93$965.58 $160.00$960.00 $160.00$960.00 
33RM SWR G-MAIN, TRENCHED, RCP, 2000D, 12"365L.F.$27.75$10,128.75 $25.50$9,307.50 $29.00$10,585.00 
34RMVL OF PAV'T3552S.Y.$1.00$3,552.00 $3.00$10,656.00 $2.50$8,880.00 
35SIDEWALK, PCC, 5"250.4S.Y.$24.64$6,169.856 $21.50$5,383.60 $21.50$5,383.60 
36PAINTED PAV'T MARK, WATERBORNE/SOLVENT29.11STA.$145.84$4,245.402 $145.00$4,220.95 $145.00$4,220.95 
37SEED+FERTILIZE (URBAN)6Acres$1,419.00$8,514.00 $1,850.00$11,100.00 $1,850.00$11,100.00 
38LIGHT POLE AND BASE, COMPLETE3Each$3,201.75$9,605.25 $3,185.00$9,555.00 $3,250.00$9,750.00 
39ELECTRICAL SERVICE TO MAIN BOAT RAMP, COMPLETE1L.S.$9,745.00$9,745.00 $9,700.00$9,700.00 $9,750.00$9,750.00 
40SHELTER AND SWINGSET DEMOLITION1L.S.$1,750.00$1,750.00 $4,000.00$4,000.00 $5,000.00$5,000.00 
41BRIDGE PLANKS - 3" X 12"735L.F.$16.00$11,760.00 $17.00$12,495.00 $22.00$16,170.00 
42STORMCEPTOR (OSR-390)1Each$15,000.00$15,000.00 $40,000.00$40,000.00 $20,000.00$20,000.00 
43BENCHES, COMPLETE8Each$480.00$3,840.00 $385.00$3,080.00 $350.00$2,800.00 
4440'X65' SHELTER, COMPLETE1Each$60,000.00$60,000.00 $61,500.00$61,500.00 $95,500.00$95,500.00 
45EXCAVATION, CL 10, RDWY+BORROW5538C.Y.$1.50$8,307.00 $3.35$18,552.30 $3.25$17,998.50 
46MODIFIED SUBBASE708C.Y.$27.55$19,505.40 $28.50$20,178.00 $26.50$18,762.00 
47STD/S-F PCC PAV'T, CL C CL 3, 7"4248S.Y.$25.00$106,200.00 $23.90$101,527.20 $23.90$101,527.20 
483/8" MINUS AGGREGATE51Tons$20.00$1,020.00 $17.75$905.25 $35.00$1,785.00 
49ENGINEERING FABRIC997S.Y.$1.25$1,246.25 $1.60$1,595.20 $1.80$1,794.60 
50REVETMENT, CLASS D935Tons$21.75$20,336.25 $25.35$23,702.25 $25.00$23,375.00 
512" STONE16Tons$22.00$352.00 $26.75$428.00 $35.00$560.00 
52EXCAVATION, CL 10, RDWY+BORROW2870C.Y.$1.75$5,022.50 $3.35$9,614.50 $3.25$9,327.50 
533/8" MINUS AGGREGATE12Tons$15.00$180.00 $17.75$213.00 $35.00$420.00 
54GRANULAR SURF ON RD, CL A CR STONE1126.1Tons$14.65$16,497.365 $16.20$18,242.82 $15.00$16,891.50 
55STRUCT CONC (MISCELLANEOUS)23.85C.Y.$201.00$4,793.85 $400.00$9,540.00 $400.00$9,540.00 
56ENGINEER FABRIC298S.Y.$1.25$372.50 $1.60$476.80 $1.80$536.40 
57REVETMENT, CLASS D295Tons$21.75$6,416.25 $23.35$6,888.25 $25.00$7,375.00 
58EXCAVATION, CL 10, RDWY+BORROW5249C.Y.$1.50$7,873.50 $3.35$17,584.15 $3.25$17,059.25 
59MODIFIED SUBBASE548C.Y.$27.55$15,097.40 $28.50$15,618.00 $26.50$14,522.00 
60SHLD CONSTRUCTION, EARTH15.47STA.$250.00$3,867.50 $140.75$2,177.403 $250.00$3,867.50 
61STD/S-F PCC PAV'T, CL C CL 3, 7"2742S.Y.$25.00$68,550.00 $23.90$65,533.80 $23.90$65,533.80 
62POROUS BACKFILL181Tons$20.00$3,620.00 $19.10$3,457.10 $25.00$4,525.00 
63INTAKE, SW-512, 18"2Each$1,600.00$3,200.00 $1,260.00$2,520.00 $975.00$1,950.00 
64SUBDRAIN, LONGITUDINAL, (SHLD) 4"626.06L.F.$3.32$2,078.519 $3.30$2,065.998 $3.30$2,065.998 
65STD, PERFORATED, 8"309L.F.$9.50$2,935.50 $6.00$1,854.00 $16.00$4,944.00 
66SUBDRAIN OUTLET (RF-19C)4Each$161.00$644.00 $160.00$640.00 $160.00$640.00 
67RM SWR G-MAIN, TRENCHED, RCP 2000D, 12"118L.F.$27.75$3,274.50 $25.50$3,009.00 $43.00$5,074.00 
68ENGINEER FABRIC1008S.Y.$1.25$1,260.00 $1.60$1,612.80 $1.80$1,814.40 
69RMVL OF PAV'T3290S.Y.$1.00$3,290.00 $3.00$9,870.00 $2.50$8,225.00 
70NATIVE GRASS SEEDING0.5Acres$2,534.00$1,267.00 $2,000.00$1,000.00 $2,000.00$1,000.00 
71ELECTRICAL SERVICE TO LODGE PARKING, COMPLETE1L.S.$705.00$705.00 $700.00$700.00 $750.00$750.00 
72SOIL MATRIX280C.Y.$24.00$6,720.00 $30.00$8,400.00 $35.00$9,800.00 
73EXCAVATION, CL 10, RDWY+BORROW1414C.Y.$2.50$3,535.00 $3.35$4,736.90 $3.25$4,595.50 
74MODIFIED SUBBASE502C.Y.$27.55$13,830.10 $28.50$14,307.00 $26.50$13,303.00 
75STD/S-F PCC PAV'T, CL C CL 3, 7"3011S.Y.$25.00$75,275.00 $23.90$71,962.90 $23.90$71,962.90 
76PAINTED PAV'T MARK, WATERBORNE/SOLVENT28.77STA.$146.00$4,200.42 $145.00$4,171.65 $145.00$4,171.65 
77LIGHT POLE AND BASE, COMPLETE4Each$3,860.00$15,440.00 $3,850.00$15,400.00 $3,100.00$12,400.00 
78PRECAST CONCRETE SINGLE PIT LATRINE1Each$23,500.00$23,500.00 $32,000.00$32,000.00 $25,000.00$25,000.00 
79EXCAVATION, CL 10, RDWY+BORROW9853C.Y.$2.50$24,632.50 $3.35$33,007.55 $3.25$32,022.25 
80MODIFIED SUBBASE7811.4C.Y.$27.55$215,204.07 $28.50$222,624.90 $26.50$207,002.10 
81SHLD CONSTRUCTION, EARTH349.84STA.$150.00$52,476.00 $140.75$49,239.98 $250.00$87,460.00 
82STD/S-F PCC PAV'T, CL C CL 3, 7"38984.6S.Y.$25.00$974,615.00 $23.90$931,731.94 $23.90$931,731.94 
83APRON, CONC, 24"22Each$500.00$11,000.00 $815.00$17,930.00 $450.00$9,900.00 
84ARPON, CONC, 30"2Each$600.00$1,200.00 $875.00$1,750.00 $500.00$1,000.00 
85APRON, CONC, 48"1Each$1,200.00$1,200.00 $1,650.00$1,650.00 $1,100.00$1,100.00 
86CULV, CONC RDWY PIPE, 24"1005L.F.$45.50$45,727.50 $56.50$56,782.50 $48.00$48,240.00 
87CONC, RDWY PIPE, 30"161L.F.$60.00$9,660.00 $70.50$11,350.50 $55.00$8,855.00 
88CULV, CONC RDWY PIPE, 48"100L.F.$100.00$10,000.00 $112.50$11,250.00 $90.00$9,000.00 
89SUBDRAIN, LONGITUDINAL, (SHLD) 4"31085.14L.F.$3.32$103,202.665 $3.30$102,580.962 $3.30$102,580.962 
90SUBDRAIN OUTLET (RF-19C)104Each$161.00$16,744.00 $160.00$16,640.00 $160.00$16,640.00 
91RMVL OF PAV'T41212S.Y.$1.00$41,212.00 $3.00$123,636.00 $2.50$103,030.00 
92SEED+FERTILIZE (URBAN)15Acres$1,419.00$21,285.00 $1,850.00$27,750.00 $1,850.00$27,750.00 
9324" JOINT BLOCK2Each$150.00$300.00 $365.00$730.00 $500.00$1,000.00 
9430" JOINT BLOCK2Each$200.00$400.00 $365.00$730.00 $550.00$1,100.00 
9548" JOINT BLOCK1Each$350.00$350.00 $365.00$365.00 $800.00$800.00 
9648" RISER1Each$3,600.00$3,600.00 $2,500.00$2,500.00 $4,000.00$4,000.00 
97EXCAVATION, CL, 10, RDWY+BORROW283C.Y.$2.50$707.50 $3.35$948.05 $3.25$919.75 
98MODIFIED SUBBASE284C.Y.$27.55$7,824.20 $28.50$8,094.00 $26.50$7,526.00 
99STD/S-F PCC PAV'T, CL C CL 3, 7"1700S.Y.$25.00$42,500.00 $23.90$40,630.00 $23.90$40,630.00 
100EXCAVATION, CL 10, RDWY+BORROW300C.Y.$2.50$750.00 $3.35$1,005.00 $3.25$975.00 
101DUMP STATION, COMPLETE1L.S.$13,000.00$13,000.00 $17,750.00$17,750.00 $13,000.00$13,000.00 
102MOBILIZATION1L.S.$110,500.00$110,500.00 $75,000.00$75,000.00 $87,500.00$87,500.00 
10336" JOINT BLOCK2Each$200.00$400.00 $365.00$730.00 $600.00$1,200.00 
104CULV, CONC RDWY PIPE, 36"155L.F.$81.00$12,555.00 $80.00$12,400.00 $66.00$10,230.00 
105APRON, CONC, 36"2Each$1,000.00$2,000.00 $1,110.00$2,220.00 $875.00$1,750.00 
      $3,184,186.913  $3,243,479.375  $3,280,756.165 
 
4
5
6
Estimated Cost: $3,800,000.00
Contractor: 
PETERSON CONTRACTORS INC (PCI-REINBECK)Cornerstone Excavating Inc.C J Moyna & Sons Inc
Funding Source: 100% Lake Restoration, 104 Blackhawk St
Box A
1320 West Main St
PO Box 828
24412 Hwy 13
Reinbeck IA  50669Washington IA  52353Elkader IA  52043
Plan Sets Requested: 26
Quantities
319-345-2713319-653-3957563-245-1442
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Fishing Pier1L.S.$42,500.00$42,500.00 $42,000.00$42,000.00 $50,000.00$50,000.00 
2CLEAR+GRUBB6Acres$3,000.00$18,000.00 $3,000.00$18,000.00 $4,000.00$24,000.00 
3EXCAVATION, CL 10, RDWY+BORROW1977C.Y.$5.40$10,675.80 $3.25$6,425.25 $3.50$6,919.50 
4MODIFIED SUBBASE7.4C.Y.$37.00$273.80 $25.95$192.03 $25.00$185.00 
5GRANULAR SURF ON RD, CL A CR STONE1619Tons$15.00$24,285.00 $14.75$23,880.25 $16.50$26,713.50 
6APRON, METAL, 18"6Each$200.00$1,200.00 $115.00$690.00 $1,000.00$6,000.00 
7APRON, METAL, 24"2Each$300.00$600.00 $160.00$320.00 $1,500.00$3,000.00 
8CULV, CMP ENT, 18"63L.F.$27.00$1,701.00 $28.00$1,764.00 $26.00$1,638.00 
9CULV, CMP ENT, 24"45L.F.$34.00$1,530.00 $32.00$1,440.00 $28.00$1,260.00 
10SIDEWALK, PCC 5"6892.1S.Y.$19.75$136,118.975 $24.50$168,856.45 $19.75$136,118.975 
11SIDEWALK, PCC, 6"587S.Y.$20.85$12,238.95 $26.50$15,555.50 $20.85$12,238.95 
12SEED+FERTILIZE (URBAN)6Acres$1,800.00$10,800.00 $1,800.00$10,800.00 $3,200.00$19,200.00 
13CLEAR+GRUBB1.9Acres$3,000.00$5,700.00 $3,000.00$5,700.00 $4,000.00$7,600.00 
14EXCAVATION, CL 10, RDWY+BORROW12097C.Y.$2.90$35,081.30 $3.25$39,315.25 $2.85$34,476.45 
15ENGINEERING FABRIC6935S.Y.$2.50$17,337.50 $1.50$10,402.50 $3.00$20,805.00 
16REVETMENT, CLASS D4986Tons$22.75$113,431.50 $25.00$124,650.00 $24.00$119,664.00 
17SEED+FERTILIZE (URBAN)1.9Acres$1,800.00$3,420.00 $1,800.00$3,420.00 $4,000.00$7,600.00 
18BEACH SAND4560Tons$17.25$78,660.00 $16.00$72,960.00 $17.00$77,520.00 
19RAISE LIFT STATION, COMPLETE1L.S.$21,000.00$21,000.00 $10,000.00$10,000.00 $5,800.00$5,800.00 
20CLEAR+GRUBB6Acres$3,000.00$18,000.00 $3,000.00$18,000.00 $4,000.00$24,000.00 
21EXCAVATION, CL 10, RDWY+BORROW14815C.Y.$4.00$59,260.00 $3.25$48,148.75 $3.00$44,445.00 
22MODIFIED SUBBASE596C.Y.$27.75$16,539.00 $25.95$15,466.20 $25.00$14,900.00 
23SHLD CONSTRUCTION, EARTH6.61STA.$155.00$1,024.55 $150.00$991.50 $350.00$2,313.50 
24STD/S-F PCC PAV'T, CL C CL 3, 7"2980S.Y.$23.90$71,222.00 $24.85$74,053.00 $23.90$71,222.00 
25GRANULAR SURF ON RD, CL A CR STONE556.5Tons$15.00$8,347.50 $14.75$8,208.375 $16.50$9,182.25 
26STRUCT CONC (MISCELLANEOUS)160C.Y.$300.00$48,000.00 $320.00$51,200.00 $350.00$56,000.00 
27APRON, CONC, 12"1Each$650.00$650.00 $705.00$705.00 $1,200.00$1,200.00 
28INTAKE, SW5111Each$2,300.00$2,300.00 $2,500.00$2,500.00 $5,500.00$5,500.00 
29INTAKE, SW-512, 18"1Each$1,350.00$1,350.00 $1,750.00$1,750.00 $5,500.00$5,500.00 
30PILE, STEEL SHEET3800S.F.$25.00$95,000.00 $36.00$136,800.00 $37.00$140,600.00 
31SUBDRAIN, LONGITUDINAL, (SHLD) 4"660.8L.F.$6.50$4,295.20 $5.80$3,832.64 $3.50$2,312.80 
32SUBDRAIN OUTLET (RF-19C)6Each$150.00$900.00 $135.00$810.00 $180.00$1,080.00 
33RM SWR G-MAIN, TRENCHED, RCP, 2000D, 12"365L.F.$27.00$9,855.00 $25.65$9,362.25 $25.00$9,125.00 
34RMVL OF PAV'T3552S.Y.$2.50$8,880.00 $2.65$9,412.80 $3.95$14,030.40 
35SIDEWALK, PCC, 5"250.4S.Y.$21.50$5,383.60 $24.50$6,134.80 $21.50$5,383.60 
36PAINTED PAV'T MARK, WATERBORNE/SOLVENT29.11STA.$145.00$4,220.95 $145.00$4,220.95 $150.00$4,366.50 
37SEED+FERTILIZE (URBAN)6Acres$1,800.00$10,800.00 $1,800.00$10,800.00 $2,500.00$15,000.00 
38LIGHT POLE AND BASE, COMPLETE3Each$2,900.00$8,700.00 $3,500.00$10,500.00 $3,200.00$9,600.00 
39ELECTRICAL SERVICE TO MAIN BOAT RAMP, COMPLETE1L.S.$11,600.00$11,600.00 $10,000.00$10,000.00 $10,000.00$10,000.00 
40SHELTER AND SWINGSET DEMOLITION1L.S.$3,500.00$3,500.00 $1,500.00$1,500.00 $7,500.00$7,500.00 
41BRIDGE PLANKS - 3" X 12"735L.F.$16.60$12,201.00 $16.00$11,760.00 $17.00$12,495.00 
42STORMCEPTOR (OSR-390)1Each$29,900.00$29,900.00 $35,000.00$35,000.00 $3,500.00$3,500.00 
43BENCHES, COMPLETE8Each$420.00$3,360.00 $1,000.00$8,000.00 $4,000.00$32,000.00 
4440'X65' SHELTER, COMPLETE1Each$115,000.00$115,000.00 $80,000.00$80,000.00 $50,000.00$50,000.00 
45EXCAVATION, CL 10, RDWY+BORROW5538C.Y.$4.00$22,152.00 $3.25$17,998.50 $3.75$20,767.50 
46MODIFIED SUBBASE708C.Y.$27.75$19,647.00 $25.95$18,372.60 $25.00$17,700.00 
47STD/S-F PCC PAV'T, CL C CL 3, 7"4248S.Y.$23.90$101,527.20 $24.85$105,562.80 $23.90$101,527.20 
483/8" MINUS AGGREGATE51Tons$24.00$1,224.00 $14.75$752.25 $100.00$5,100.00 
49ENGINEERING FABRIC997S.Y.$2.50$2,492.50 $1.50$1,495.50 $3.00$2,991.00 
50REVETMENT, CLASS D935Tons$22.75$21,271.25 $25.00$23,375.00 $24.00$22,440.00 
512" STONE16Tons$35.00$560.00 $14.75$236.00 $25.00$400.00 
52EXCAVATION, CL 10, RDWY+BORROW2870C.Y.$5.00$14,350.00 $3.25$9,327.50 $3.75$10,762.50 
533/8" MINUS AGGREGATE12Tons$35.00$420.00 $14.75$177.00 $100.00$1,200.00 
54GRANULAR SURF ON RD, CL A CR STONE1126.1Tons$15.00$16,891.50 $14.75$16,609.975 $16.50$18,580.65 
55STRUCT CONC (MISCELLANEOUS)23.85C.Y.$400.00$9,540.00 $300.00$7,155.00 $350.00$8,347.50 
56ENGINEER FABRIC298S.Y.$2.50$745.00 $1.50$447.00 $3.00$894.00 
57REVETMENT, CLASS D295Tons$26.50$7,817.50 $25.00$7,375.00 $24.00$7,080.00 
58EXCAVATION, CL 10, RDWY+BORROW5249C.Y.$5.85$30,706.65 $3.25$17,059.25 $4.25$22,308.25 
59MODIFIED SUBBASE548C.Y.$27.75$15,207.00 $25.95$14,220.60 $25.00$13,700.00 
60SHLD CONSTRUCTION, EARTH15.47STA.$155.00$2,397.85 $150.00$2,320.50 $350.00$5,414.50 
61STD/S-F PCC PAV'T, CL C CL 3, 7"2742S.Y.$23.90$65,533.80 $24.85$68,138.70 $23.90$65,533.80 
62POROUS BACKFILL181Tons$22.00$3,982.00 $21.10$3,819.10 $26.00$4,706.00 
63INTAKE, SW-512, 18"2Each$1,350.00$2,700.00 $1,775.00$3,550.00 $3,500.00$7,000.00 
64SUBDRAIN, LONGITUDINAL, (SHLD) 4"626.06L.F.$6.50$4,069.39 $5.80$3,631.148 $3.50$2,191.21 
65STD, PERFORATED, 8"309L.F.$12.00$3,708.00 $20.00$6,180.00 $16.00$4,944.00 
66SUBDRAIN OUTLET (RF-19C)4Each$150.00$600.00 $135.00$540.00 $175.00$700.00 
67RM SWR G-MAIN, TRENCHED, RCP 2000D, 12"118L.F.$27.00$3,186.00 $25.65$3,026.70 $50.00$5,900.00 
68ENGINEER FABRIC1008S.Y.$2.50$2,520.00 $1.50$1,512.00 $4.00$4,032.00 
69RMVL OF PAV'T3290S.Y.$2.50$8,225.00 $2.65$8,718.50 $3.95$12,995.50 
70NATIVE GRASS SEEDING0.5Acres$4,000.00$2,000.00 $4,000.00$2,000.00 $8,000.00$4,000.00 
71ELECTRICAL SERVICE TO LODGE PARKING, COMPLETE1L.S.$12,850.00$12,850.00 $750.00$750.00 $1,000.00$1,000.00 
72SOIL MATRIX280C.Y.$65.00$18,200.00 $100.00$28,000.00 $65.00$18,200.00 
73EXCAVATION, CL 10, RDWY+BORROW1414C.Y.$5.85$8,271.90 $3.25$4,595.50 $4.25$6,009.50 
74MODIFIED SUBBASE502C.Y.$27.75$13,930.50 $25.95$13,026.90 $25.00$12,550.00 
75STD/S-F PCC PAV'T, CL C CL 3, 7"3011S.Y.$23.90$71,962.90 $24.85$74,823.35 $23.90$71,962.90 
76PAINTED PAV'T MARK, WATERBORNE/SOLVENT28.77STA.$145.00$4,171.65 $145.00$4,171.65 $150.00$4,315.50 
77LIGHT POLE AND BASE, COMPLETE4Each$1,400.00$5,600.00 $3,500.00$14,000.00 $4,000.00$16,000.00 
78PRECAST CONCRETE SINGLE PIT LATRINE1Each$28,000.00$28,000.00 $30,000.00$30,000.00 $6,500.00$6,500.00 
79EXCAVATION, CL 10, RDWY+BORROW9853C.Y.$4.75$46,801.75 $3.25$32,022.25 $4.25$41,875.25 
80MODIFIED SUBBASE7811.4C.Y.$27.00$210,907.80 $25.95$202,705.83 $25.00$195,285.00 
81SHLD CONSTRUCTION, EARTH349.84STA.$155.00$54,225.20 $150.00$52,476.00 $295.00$103,202.80 
82STD/S-F PCC PAV'T, CL C CL 3, 7"38984.6S.Y.$23.90$931,731.94 $24.85$968,767.31 $23.90$931,731.94 
83APRON, CONC, 24"22Each$850.00$18,700.00 $965.00$21,230.00 $1,650.00$36,300.00 
84ARPON, CONC, 30"2Each$900.00$1,800.00 $1,140.00$2,280.00 $2,300.00$4,600.00 
85APRON, CONC, 48"1Each$1,500.00$1,500.00 $2,125.00$2,125.00 $3,650.00$3,650.00 
86CULV, CONC RDWY PIPE, 24"1005L.F.$47.00$47,235.00 $36.00$36,180.00 $51.00$51,255.00 
87CONC, RDWY PIPE, 30"161L.F.$58.00$9,338.00 $44.00$7,084.00 $59.00$9,499.00 
88CULV, CONC RDWY PIPE, 48"100L.F.$108.00$10,800.00 $86.00$8,600.00 $130.00$13,000.00 
89SUBDRAIN, LONGITUDINAL, (SHLD) 4"31085.14L.F.$5.50$170,968.27 $5.80$180,293.812 $3.50$108,797.99 
90SUBDRAIN OUTLET (RF-19C)104Each$150.00$15,600.00 $135.00$14,040.00 $175.00$18,200.00 
91RMVL OF PAV'T41212S.Y.$2.50$103,030.00 $2.65$109,211.80 $3.15$129,817.80 
92SEED+FERTILIZE (URBAN)15Acres$1,650.00$24,750.00 $1,650.00$24,750.00 $3,200.00$48,000.00 
9324" JOINT BLOCK2Each$550.00$1,100.00 $300.00$600.00 $3,800.00$7,600.00 
9430" JOINT BLOCK2Each$600.00$1,200.00 $400.00$800.00 $4,200.00$8,400.00 
9548" JOINT BLOCK1Each$725.00$725.00 $600.00$600.00 $4,800.00$4,800.00 
9648" RISER1Each$6,000.00$6,000.00 $7,500.00$7,500.00 $6,500.00$6,500.00 
97EXCAVATION, CL, 10, RDWY+BORROW283C.Y.$7.00$1,981.00 $3.25$919.75 $10.00$2,830.00 
98MODIFIED SUBBASE284C.Y.$27.75$7,881.00 $25.95$7,369.80 $25.00$7,100.00 
99STD/S-F PCC PAV'T, CL C CL 3, 7"1700S.Y.$23.90$40,630.00 $24.85$42,245.00 $23.90$40,630.00 
100EXCAVATION, CL 10, RDWY+BORROW300C.Y.$7.00$2,100.00 $3.25$975.00 $10.00$3,000.00 
101DUMP STATION, COMPLETE1L.S.$14,000.00$14,000.00 $22,500.00$22,500.00 $18,500.00$18,500.00 
102MOBILIZATION1L.S.$107,500.00$107,500.00 $117,000.00$117,000.00 $235,000.00$235,000.00 
10336" JOINT BLOCK2Each$625.00$1,250.00 $500.00$1,000.00 $4,400.00$8,800.00 
104CULV, CONC RDWY PIPE, 36"155L.F.$65.00$10,075.00 $56.00$8,680.00 $70.00$10,850.00 
105APRON, CONC, 36"2Each$1,100.00$2,200.00 $1,490.00$2,980.00 $2,100.00$4,200.00 
      $3,455,333.175  $3,503,431.07  $3,673,173.715 
 
7
8
9
Estimated Cost: $3,800,000.00
Contractor: 
Ceres Environmental Services
Funding Source: 100% Lake Restoration, 3825 85th Ave North


Brooklyn Park MN  55443    
Plan Sets Requested: 26
Quantities
763-488-5600
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Fishing Pier1L.S.$54,000.00$54,000.00 $0.00 $0.00 
2CLEAR+GRUBB6Acres$2,135.00$12,810.00 $0.00 $0.00 
3EXCAVATION, CL 10, RDWY+BORROW1977C.Y.$4.15$8,204.55 $0.00 $0.00 
4MODIFIED SUBBASE7.4C.Y.$71.65$530.21 $0.00 $0.00 
5GRANULAR SURF ON RD, CL A CR STONE1619Tons$17.65$28,575.35 $0.00 $0.00 
6APRON, METAL, 18"6Each$180.00$1,080.00 $0.00 $0.00 
7APRON, METAL, 24"2Each$225.00$450.00 $0.00 $0.00 
8CULV, CMP ENT, 18"63L.F.$38.45$2,422.35 $0.00 $0.00 
9CULV, CMP ENT, 24"45L.F.$45.40$2,043.00 $0.00 $0.00 
10SIDEWALK, PCC 5"6892.1S.Y.$27.55$189,877.355 $0.00 $0.00 
11SIDEWALK, PCC, 6"587S.Y.$29.80$17,492.60 $0.00 $0.00 
12SEED+FERTILIZE (URBAN)6Acres$2,178.00$13,068.00 $0.00 $0.00 
13CLEAR+GRUBB1.9Acres$2,165.00$4,113.50 $0.00 $0.00 
14EXCAVATION, CL 10, RDWY+BORROW12097C.Y.$2.90$35,081.30 $0.00 $0.00 
15ENGINEERING FABRIC6935S.Y.$2.15$14,910.25 $0.00 $0.00 
16REVETMENT, CLASS D4986Tons$24.15$120,411.90 $0.00 $0.00 
17SEED+FERTILIZE (URBAN)1.9Acres$2,175.00$4,132.50 $0.00 $0.00 
18BEACH SAND4560Tons$16.10$73,416.00 $0.00 $0.00 
19RAISE LIFT STATION, COMPLETE1L.S.$3,665.00$3,665.00 $0.00 $0.00 
20CLEAR+GRUBB6Acres$2,135.00$12,810.00 $0.00 $0.00 
21EXCAVATION, CL 10, RDWY+BORROW14815C.Y.$3.75$55,556.25 $0.00 $0.00 
22MODIFIED SUBBASE596C.Y.$32.55$19,399.80 $0.00 $0.00 
23SHLD CONSTRUCTION, EARTH6.61STA.$321.71$2,126.503 $0.00 $0.00 
24STD/S-F PCC PAV'T, CL C CL 3, 7"2980S.Y.$27.95$83,291.00 $0.00 $0.00 
25GRANULAR SURF ON RD, CL A CR STONE556.5Tons$16.30$9,070.95 $0.00 $0.00 
26STRUCT CONC (MISCELLANEOUS)160C.Y.$225.00$36,000.00 $0.00 $0.00 
27APRON, CONC, 12"1Each$310.00$310.00 $0.00 $0.00 
28INTAKE, SW5111Each$875.00$875.00 $0.00 $0.00 
29INTAKE, SW-512, 18"1Each$905.00$905.00 $0.00 $0.00 
30PILE, STEEL SHEET3800S.F.$41.91$159,258.00 $0.00 $0.00 
31SUBDRAIN, LONGITUDINAL, (SHLD) 4"660.8L.F.$3.85$2,544.08 $0.00 $0.00 
32SUBDRAIN OUTLET (RF-19C)6Each$195.00$1,170.00 $0.00 $0.00 
33RM SWR G-MAIN, TRENCHED, RCP, 2000D, 12"365L.F.$28.55$10,420.75 $0.00 $0.00 
34RMVL OF PAV'T3552S.Y.$3.30$11,721.60 $0.00 $0.00 
35SIDEWALK, PCC, 5"250.4S.Y.$27.55$6,898.52 $0.00 $0.00 
36PAINTED PAV'T MARK, WATERBORNE/SOLVENT29.11STA.$202.94$5,907.583 $0.00 $0.00 
37SEED+FERTILIZE (URBAN)6Acres$2,175.00$13,050.00 $0.00 $0.00 
38LIGHT POLE AND BASE, COMPLETE3Each$3,510.00$10,530.00 $0.00 $0.00 
39ELECTRICAL SERVICE TO MAIN BOAT RAMP, COMPLETE1L.S.$10,685.00$10,685.00 $0.00 $0.00 
40SHELTER AND SWINGSET DEMOLITION1L.S.$900.00$900.00 $0.00 $0.00 
41BRIDGE PLANKS - 3" X 12"735L.F.$17.65$12,972.75 $0.00 $0.00 
42STORMCEPTOR (OSR-390)1Each$35,800.00$35,800.00 $0.00 $0.00 
43BENCHES, COMPLETE8Each$485.00$3,880.00 $0.00 $0.00 
4440'X65' SHELTER, COMPLETE1Each$44,275.00$44,275.00 $0.00 $0.00 
45EXCAVATION, CL 10, RDWY+BORROW5538C.Y.$3.95$21,875.10 $0.00 $0.00 
46MODIFIED SUBBASE708C.Y.$32.55$23,045.40 $0.00 $0.00 
47STD/S-F PCC PAV'T, CL C CL 3, 7"4248S.Y.$27.95$118,731.60 $0.00 $0.00 
483/8" MINUS AGGREGATE51Tons$23.80$1,213.80 $0.00 $0.00 
49ENGINEERING FABRIC997S.Y.$2.20$2,193.40 $0.00 $0.00 
50REVETMENT, CLASS D935Tons$24.75$23,141.25 $0.00 $0.00 
512" STONE16Tons$27.25$436.00 $0.00 $0.00 
52EXCAVATION, CL 10, RDWY+BORROW2870C.Y.$4.10$11,767.00 $0.00 $0.00 
533/8" MINUS AGGREGATE12Tons$30.60$367.20 $0.00 $0.00 
54GRANULAR SURF ON RD, CL A CR STONE1126.1Tons$16.55$18,636.955 $0.00 $0.00 
55STRUCT CONC (MISCELLANEOUS)23.85C.Y.$224.85$5,362.673 $0.00 $0.00 
56ENGINEER FABRIC298S.Y.$2.20$655.60 $0.00 $0.00 
57REVETMENT, CLASS D295Tons$25.00$7,375.00 $0.00 $0.00 
58EXCAVATION, CL 10, RDWY+BORROW5249C.Y.$4.10$21,520.90 $0.00 $0.00 
59MODIFIED SUBBASE548C.Y.$32.55$17,837.40 $0.00 $0.00 
60SHLD CONSTRUCTION, EARTH15.47STA.$312.38$4,832.519 $0.00 $0.00 
61STD/S-F PCC PAV'T, CL C CL 3, 7"2742S.Y.$27.95$76,638.90 $0.00 $0.00 
62POROUS BACKFILL181Tons$20.00$3,620.00 $0.00 $0.00 
63INTAKE, SW-512, 18"2Each$902.00$1,804.00 $0.00 $0.00 
64SUBDRAIN, LONGITUDINAL, (SHLD) 4"626.06L.F.$3.85$2,410.331 $0.00 $0.00 
65STD, PERFORATED, 8"309L.F.$8.15$2,518.35 $0.00 $0.00 
66SUBDRAIN OUTLET (RF-19C)4Each$195.00$780.00 $0.00 $0.00 
67RM SWR G-MAIN, TRENCHED, RCP 2000D, 12"118L.F.$28.75$3,392.50 $0.00 $0.00 
68ENGINEER FABRIC1008S.Y.$2.20$2,217.60 $0.00 $0.00 
69RMVL OF PAV'T3290S.Y.$2.80$9,212.00 $0.00 $0.00 
70NATIVE GRASS SEEDING0.5Acres$5,515.00$2,757.50 $0.00 $0.00 
71ELECTRICAL SERVICE TO LODGE PARKING, COMPLETE1L.S.$770.00$770.00 $0.00 $0.00 
72SOIL MATRIX280C.Y.$47.50$13,300.00 $0.00 $0.00 
73EXCAVATION, CL 10, RDWY+BORROW1414C.Y.$4.35$6,150.90 $0.00 $0.00 
74MODIFIED SUBBASE502C.Y.$32.55$16,340.10 $0.00 $0.00 
75STD/S-F PCC PAV'T, CL C CL 3, 7"3011S.Y.$27.95$84,157.45 $0.00 $0.00 
76PAINTED PAV'T MARK, WATERBORNE/SOLVENT28.77STA.$202.94$5,838.584 $0.00 $0.00 
77LIGHT POLE AND BASE, COMPLETE4Each$3,390.00$13,560.00 $0.00 $0.00 
78PRECAST CONCRETE SINGLE PIT LATRINE1Each$25,815.00$25,815.00 $0.00 $0.00 
79EXCAVATION, CL 10, RDWY+BORROW9853C.Y.$5.00$49,265.00 $0.00 $0.00 
80MODIFIED SUBBASE7811.4C.Y.$32.55$254,261.07 $0.00 $0.00 
81SHLD CONSTRUCTION, EARTH349.84STA.$309.50$108,275.48 $0.00 $0.00 
82STD/S-F PCC PAV'T, CL C CL 3, 7"38984.6S.Y.$27.95$1,089,619.57 $0.00 $0.00 
83APRON, CONC, 24"22Each$505.00$11,110.00 $0.00 $0.00 
84ARPON, CONC, 30"2Each$625.00$1,250.00 $0.00 $0.00 
85APRON, CONC, 48"1Each$1,200.00$1,200.00 $0.00 $0.00 
86CULV, CONC RDWY PIPE, 24"1005L.F.$37.40$37,587.00 $0.00 $0.00 
87CONC, RDWY PIPE, 30"161L.F.$46.70$7,518.70 $0.00 $0.00 
88CULV, CONC RDWY PIPE, 48"100L.F.$82.80$8,280.00 $0.00 $0.00 
89SUBDRAIN, LONGITUDINAL, (SHLD) 4"31085.14L.F.$3.85$119,677.789 $0.00 $0.00 
90SUBDRAIN OUTLET (RF-19C)104Each$195.00$20,280.00 $0.00 $0.00 
91RMVL OF PAV'T41212S.Y.$2.80$115,393.60 $0.00 $0.00 
92SEED+FERTILIZE (URBAN)15Acres$2,178.00$32,670.00 $0.00 $0.00 
9324" JOINT BLOCK2Each$325.00$650.00 $0.00 $0.00 
9430" JOINT BLOCK2Each$393.00$786.00 $0.00 $0.00 
9548" JOINT BLOCK1Each$401.00$401.00 $0.00 $0.00 
9648" RISER1Each$1,150.00$1,150.00 $0.00 $0.00 
97EXCAVATION, CL, 10, RDWY+BORROW283C.Y.$5.40$1,528.20 $0.00 $0.00 
98MODIFIED SUBBASE284C.Y.$32.55$9,244.20 $0.00 $0.00 
99STD/S-F PCC PAV'T, CL C CL 3, 7"1700S.Y.$27.95$47,515.00 $0.00 $0.00 
100EXCAVATION, CL 10, RDWY+BORROW300C.Y.$5.65$1,695.00 $0.00 $0.00 
101DUMP STATION, COMPLETE1L.S.$8,115.00$8,115.00 $0.00 $0.00 
102MOBILIZATION1L.S.$723,015.03$723,015.03 $0.00 $0.00 
10336" JOINT BLOCK2Each$737.00$1,474.00 $0.00 $0.00 
104CULV, CONC RDWY PIPE, 36"155L.F.$55.75$8,641.25 $0.00 $0.00 
105APRON, CONC, 36"2Each$840.00$1,680.00 $0.00 $0.00 
      $4,349,199.551  $0.00  $0.00 
 



 