IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Lake Macbride State Park  Date: 4/25/2013  Project No.  
  Universally accessible path  County:   JOHNSON  Time: 3:00 p.m.  12-06-52-01

 

 
1
2
3
Estimated Cost: $17,000.00
Contractor: 
Eastern Iowa Excavating & Concrete, LLCCAJ Enterprises Inc. dba Chris Jones TruckingTriple B Construction
Funding Source: 78% Cash Donation, 22% F&W Trust - Other, 121 Nixon St SE
263 260th St
2272 Spicer Ave
Cascade IA  52033West Branch IA  52358Wilton IA  52778
Plan Sets Requested: 0
Quantities
563-852-5120319-643-7487319-631-0320
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$1,800.00$1,800.00 $1,500.00$1,500.00 $10,000.00$10,000.00 
2Class"A" Crushed Stone73.3Tons$22.25$1,630.925 $20.00$1,466.00 $25.00$1,832.50 
33/8" Granular Surfacing70.7Tons$16.50$1,166.55 $16.00$1,131.20 $28.00$1,979.60 
4Special Backfill23.3Tons$24.85$579.005 $16.50$384.45 $30.00$699.00 
5Rip Rap, Class “D”75Tons$29.00$2,175.00 $40.00$3,000.00 $55.00$4,125.00 
65” PCC Paving, Class "C"111.1S.Y.$34.00$3,777.40 $65.00$7,221.50 $36.00$3,999.60 
7Engineering Fabric418.7$1.85$774.595 $3.25$1,360.775 $2.00$837.40 
8Reinforcing Steel508LB.$1.10$558.80 $1.00$508.00 $1.00$508.00 
9Sign1L.S.$775.00$775.00 $200.00$200.00 $750.00$750.00 
10Traffic Control1L.S.$1,485.00$1,485.00 $0.00$0.00 $250.00$250.00 
      $14,722.275  $16,771.925  $24,981.10 
 
 
4
5
6
Estimated Cost: $17,000.00
Contractor: 
Rohret Farm and Construction
Funding Source: 78% Cash Donation, 22% F&W Trust - Other, 3948 Blackhawk Ave


Oxford IA  52322    
Plan Sets Requested: 0
Quantities
319-330-1297
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$16,102.46$16,102.46 $0.00 $0.00 
2Class"A" Crushed Stone73.3Tons$14.40$1,055.52 $0.00 $0.00 
33/8" Granular Surfacing70.7Tons$8.50$600.95 $0.00 $0.00 
4Special Backfill23.3Tons$16.51$384.683 $0.00 $0.00 
5Rip Rap, Class “D”75Tons$26.30$1,972.50 $0.00 $0.00 
65” PCC Paving, Class "C"111.1S.Y.$105.00$11,665.50 $0.00 $0.00 
7Engineering Fabric418.7$540.00$226,098.00 $0.00 $0.00 
8Reinforcing Steel508LB.$7.18$3,647.44 $0.00 $0.00 
9Sign1L.S.$46.83$46.83 $0.00 $0.00 
10Traffic Control1L.S.$350.00$350.00 $0.00 $0.00 
      $261,923.883  $0.00  $0.00 
 



 

10/15/2026