IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Lake Darling State Park  Date: 3/1/2012  Project No.  
  Campground Roads & Final Site Grading  County:   WASHINGTON  Time: 11:00 a.m.  12-06-92-02

 

 
1
2
3
Estimated Cost: $800,000.00
Contractor: 
TK Concrete IncCornerstone Excavating Inc.DeLong Construction Inc
Funding Source: 100% Park & Institutional Road Fund, 1608 Fifield Rd
PO Box 111
212 S Marion Ave
1320 N 8th Ave
PO Box 488
Pella IA  50219Washington IA  52353Washington IA  52353
Plan Sets Requested: 18
Quantities
641-628-45903196533957319-653-3334
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1TOPSOIL STRIP/STOCKPILE/RESPREAD180C.Y.$5.25$945.00 $3.75$675.00 $4.50$810.00 
2TOPSOIL STRIP/STOCKPILE/RESPREAD (PARKING/SITE PADS)2000C.Y.$5.00$10,000.00 $3.75$7,500.00 $4.50$9,000.00 
3UNCLASSIFIED EXCAVATION9750C.Y.$3.00$29,250.00 $2.75$26,812.50 $3.45$33,637.50 
4UNCLASSIFIED EXCAVATION (PARKING)50C.Y.$9.00$450.00 $2.75$137.50 $3.45$172.50 
5SPECIAL SUBGRADE COMPACTION9165S.Y.$0.70$6,415.50 $0.65$5,957.25 $1.00$9,165.00 
6SPECIAL SUBGRADE COMPACTION (PARKING)70S.Y.$5.00$350.00 $0.65$45.50 $1.00$70.00 
7SEEDING/FERTILIZING/MULCHING0.5Acres$3,650.00$1,825.00 $1,450.00$725.00 $1,380.00$690.00 
8SEEDING/FERTILIZING/MULCHING (PARKING/SITE PADS)3Acres$3,500.00$10,500.00 $1,450.00$4,350.00 $1,380.00$4,140.00 
9SILT FENCE2700L.F.$2.05$5,535.00 $1.65$4,455.00 $1.75$4,725.00 
10SILT FENCE (PARKING/SITE PADS)2550L.F.$2.05$5,227.50 $1.65$4,207.50 $1.75$4,462.50 
11CLEARING AND GRUBBING0.25Acres$2,500.00$625.00 $400.00$100.00 $6,500.00$1,625.00 
12EROSION CONTROL AND SWPPP MONITORING1L.S.$2,750.00$2,750.00 $1,500.00$1,500.00 $1,500.00$1,500.00 
13STABILIZED CONSTRUCTION ACCESS1L.S.$1,000.00$1,000.00 $1,875.00$1,875.00 $1,250.00$1,250.00 
14ROLLED EROSION CONTROL PRODUCT800S.Y.$1.62$1,296.00 $1.60$1,280.00 $3.50$2,800.00 
1715" ADS N-12 STORM SEWER PIPE640L.F.$29.00$18,560.00 $29.05$18,592.00 $32.10$20,544.00 
1815" RCP FLARED END SECTION W/ GUARD1Each$1,500.00$1,500.00 $1,420.00$1,420.00 $1,325.00$1,325.00 
19INTAKE SW-5077Each$2,800.00$19,600.00 $2,320.00$16,240.00 $3,000.00$21,000.00 
20STORM SEWER MANHOLE STANDARD 48"5Each$2,750.00$13,750.00 $2,225.00$11,125.00 $2,400.00$12,000.00 
21SUBDRAIN, 4"2950L.F.$5.80$17,110.00 $5.90$17,405.00 $5.30$15,635.00 
22SUBDRAIN OUTLET10Each$175.00$1,750.00 $125.00$1,250.00 $220.00$2,200.00 
23PAVEMENT REMOVAL9950S.Y.$2.10$20,895.00 $5.35$53,232.50 $2.75$27,362.50 
24PCC STREET PAVING, CLASS C, 6" W/ MODIFIED 6" SUBBASE9165S.Y.$30.00$274,950.00 $31.25$286,406.25 $31.95$292,821.75 
25(2") 3/8" MINUS CRUSHED STONE680Tons$12.00$8,160.00 $10.25$6,970.00 $10.50$7,140.00 
26(6") CLASS "A" GRANULAR (SITE PADS)3180Tons$14.00$44,520.00 $14.25$45,315.00 $14.50$46,110.00 
27ENGINEERING FABRIC9500S.Y.$1.35$12,825.00 $1.70$16,150.00 $2.25$21,375.00 
28PAVEMENT REMOVAL (PARKING)65S.Y.$12.00$780.00 $5.35$347.75 $2.75$178.75 
29PCC PAVING, CLASS C, 6" W/6" SUBBASE (PARKING)70S.Y.$30.00$2,100.00 $33.75$2,362.50 $36.70$2,569.00 
30MOBILIZATION1L.S.$15,000.00$15,000.00 $14,000.00$14,000.00 $13,000.00$13,000.00 
31CONSTRUCTION STAKING1L.S.$7,500.00$7,500.00 $7,000.00$7,000.00 $7,000.00$7,000.00 
      $535,169.00  $557,436.25  $564,308.50 
 
4
5
6
Estimated Cost: $800,000.00
Contractor: 
J & L Construction LLCPETERSON CONTRACTORS INC (PCI-REINBECK)Vieth Construction Corp
Funding Source: 100% Park & Institutional Road Fund, 1971 Lexington Blvd
104 Blackhawk St
Box A
6419 Nordic Dr
Washington IA  52353Reinbeck IA  50669Cedar Falls IA  50613
Plan Sets Requested: 18
Quantities
319-653-3597319-345-2713319-277-1006
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1TOPSOIL STRIP/STOCKPILE/RESPREAD180C.Y.$5.45$981.00 $3.50$630.00 $4.50$810.00 
2TOPSOIL STRIP/STOCKPILE/RESPREAD (PARKING/SITE PADS)2000C.Y.$5.35$10,700.00 $3.50$7,000.00 $4.50$9,000.00 
3UNCLASSIFIED EXCAVATION9750C.Y.$3.37$32,857.50 $3.50$34,125.00 $6.00$58,500.00 
4UNCLASSIFIED EXCAVATION (PARKING)50C.Y.$6.00$300.00 $3.50$175.00 $6.00$300.00 
5SPECIAL SUBGRADE COMPACTION9165S.Y.$0.72$6,598.80 $1.00$9,165.00 $0.75$6,873.75 
6SPECIAL SUBGRADE COMPACTION (PARKING)70S.Y.$5.00$350.00 $1.00$70.00 $11.50$805.00 
7SEEDING/FERTILIZING/MULCHING0.5Acres$1,450.00$725.00 $2,000.00$1,000.00 $1,600.00$800.00 
8SEEDING/FERTILIZING/MULCHING (PARKING/SITE PADS)3Acres$1,450.00$4,350.00 $1,300.00$3,900.00 $1,600.00$4,800.00 
9SILT FENCE2700L.F.$1.75$4,725.00 $1.60$4,320.00 $1.75$4,725.00 
10SILT FENCE (PARKING/SITE PADS)2550L.F.$1.75$4,462.50 $1.60$4,080.00 $1.75$4,462.50 
11CLEARING AND GRUBBING0.25Acres$3,000.00$750.00 $2,000.00$500.00 $7,000.00$1,750.00 
12EROSION CONTROL AND SWPPP MONITORING1L.S.$2,200.00$2,200.00 $1,000.00$1,000.00 $545.00$545.00 
13STABILIZED CONSTRUCTION ACCESS1L.S.$1,200.00$1,200.00 $750.00$750.00 $1,150.00$1,150.00 
14ROLLED EROSION CONTROL PRODUCT800S.Y.$1.50$1,200.00 $1.25$1,000.00 $1.50$1,200.00 
1715" ADS N-12 STORM SEWER PIPE640L.F.$37.00$23,680.00 $38.00$24,320.00 $29.40$18,816.00 
1815" RCP FLARED END SECTION W/ GUARD1Each$1,500.00$1,500.00 $1,250.00$1,250.00 $1,150.00$1,150.00 
19INTAKE SW-5077Each$3,200.00$22,400.00 $3,350.00$23,450.00 $3,300.00$23,100.00 
20STORM SEWER MANHOLE STANDARD 48"5Each$2,590.00$12,950.00 $2,030.00$10,150.00 $2,800.00$14,000.00 
21SUBDRAIN, 4"2950L.F.$7.50$22,125.00 $5.25$15,487.50 $7.50$22,125.00 
22SUBDRAIN OUTLET10Each$173.00$1,730.00 $200.00$2,000.00 $150.00$1,500.00 
23PAVEMENT REMOVAL9950S.Y.$2.10$20,895.00 $3.50$34,825.00 $4.50$44,775.00 
24PCC STREET PAVING, CLASS C, 6" W/ MODIFIED 6" SUBBASE9165S.Y.$31.50$288,697.50 $32.00$293,280.00 $32.50$297,862.50 
25(2") 3/8" MINUS CRUSHED STONE680Tons$12.85$8,738.00 $10.75$7,310.00 $15.00$10,200.00 
26(6") CLASS "A" GRANULAR (SITE PADS)3180Tons$17.24$54,823.20 $14.50$46,110.00 $16.00$50,880.00 
27ENGINEERING FABRIC9500S.Y.$1.30$12,350.00 $2.20$20,900.00 $1.00$9,500.00 
28PAVEMENT REMOVAL (PARKING)65S.Y.$12.85$835.25 $3.50$227.50 $13.00$845.00 
29PCC PAVING, CLASS C, 6" W/6" SUBBASE (PARKING)70S.Y.$34.25$2,397.50 $35.00$2,450.00 $45.00$3,150.00 
30MOBILIZATION1L.S.$21,500.00$21,500.00 $17,500.00$17,500.00 $24,000.00$24,000.00 
31CONSTRUCTION STAKING1L.S.$6,420.00$6,420.00 $7,500.00$7,500.00 $4,000.00$4,000.00 
      $572,441.25  $574,475.00  $621,624.75 
 
7
8
9
Estimated Cost: $800,000.00
Contractor: 
Wicks Construction CoSulzberger Excavating IncAllied Manatts Group Inc.
Funding Source: 100% Park & Institutional Road Fund, 2201 State Hwy 9
PO Box 428
1500 S Houser St
PO Box 687
Decorah IA  52101Muscatine IA  52761Charles City IA  50616
Plan Sets Requested: 18
Quantities
563-382-2325563-263-16976412284256
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1TOPSOIL STRIP/STOCKPILE/RESPREAD180C.Y.$5.45$981.00 $6.00$1,080.00 $5.45$981.00 
2TOPSOIL STRIP/STOCKPILE/RESPREAD (PARKING/SITE PADS)2000C.Y.$5.35$10,700.00 $8.00$16,000.00 $5.35$10,700.00 
3UNCLASSIFIED EXCAVATION9750C.Y.$3.37$32,857.50 $5.50$53,625.00 $3.37$32,857.50 
4UNCLASSIFIED EXCAVATION (PARKING)50C.Y.$6.00$300.00 $10.00$500.00 $6.00$300.00 
5SPECIAL SUBGRADE COMPACTION9165S.Y.$0.72$6,598.80 $1.50$13,747.50 $0.72$6,598.80 
6SPECIAL SUBGRADE COMPACTION (PARKING)70S.Y.$5.00$350.00 $3.00$210.00 $5.00$350.00 
7SEEDING/FERTILIZING/MULCHING0.5Acres$2,000.00$1,000.00 $2,000.00$1,000.00 $2,000.00$1,000.00 
8SEEDING/FERTILIZING/MULCHING (PARKING/SITE PADS)3Acres$2,000.00$6,000.00 $1,300.00$3,900.00 $1,300.00$3,900.00 
9SILT FENCE2700L.F.$1.50$4,050.00 $1.60$4,320.00 $1.60$4,320.00 
10SILT FENCE (PARKING/SITE PADS)2550L.F.$1.50$3,825.00 $1.60$4,080.00 $1.60$4,080.00 
11CLEARING AND GRUBBING0.25Acres$3,000.00$750.00 $4,080.00$1,020.00 $3,000.00$750.00 
12EROSION CONTROL AND SWPPP MONITORING1L.S.$5,000.00$5,000.00 $1,500.00$1,500.00 $1,000.00$1,000.00 
13STABILIZED CONSTRUCTION ACCESS1L.S.$1,200.00$1,200.00 $1,000.00$1,000.00 $1,200.00$1,200.00 
14ROLLED EROSION CONTROL PRODUCT800S.Y.$1.75$1,400.00 $1.25$1,000.00 $1.25$1,000.00 
1715" ADS N-12 STORM SEWER PIPE640L.F.$37.00$23,680.00 $39.00$24,960.00 $37.00$23,680.00 
1815" RCP FLARED END SECTION W/ GUARD1Each$1,500.00$1,500.00 $800.00$800.00 $1,500.00$1,500.00 
19INTAKE SW-5077Each$3,050.00$21,350.00 $2,900.00$20,300.00 $3,050.00$21,350.00 
20STORM SEWER MANHOLE STANDARD 48"5Each$2,590.00$12,950.00 $2,500.00$12,500.00 $2,590.00$12,950.00 
21SUBDRAIN, 4"2950L.F.$7.60$22,420.00 $9.50$28,025.00 $7.60$22,420.00 
22SUBDRAIN OUTLET10Each$173.00$1,730.00 $75.00$750.00 $173.00$1,730.00 
23PAVEMENT REMOVAL9950S.Y.$2.00$19,900.00 $5.00$49,750.00 $2.00$19,900.00 
24PCC STREET PAVING, CLASS C, 6" W/ MODIFIED 6" SUBBASE9165S.Y.$42.70$391,345.50 $36.30$332,689.50 $45.40$416,091.00 
25(2") 3/8" MINUS CRUSHED STONE680Tons$12.85$8,738.00 $17.50$11,900.00 $12.85$8,738.00 
26(6") CLASS "A" GRANULAR (SITE PADS)3180Tons$17.24$54,823.20 $18.25$58,035.00 $17.24$54,823.20 
27ENGINEERING FABRIC9500S.Y.$1.29$12,255.00 $1.50$14,250.00 $1.29$12,255.00 
28PAVEMENT REMOVAL (PARKING)65S.Y.$12.85$835.25 $10.00$650.00 $12.85$835.25 
29PCC PAVING, CLASS C, 6" W/6" SUBBASE (PARKING)70S.Y.$50.00$3,500.00 $50.00$3,500.00 $46.00$3,220.00 
30MOBILIZATION1L.S.$25,000.00$25,000.00 $32,500.00$32,500.00 $42,000.00$42,000.00 
31CONSTRUCTION STAKING1L.S.$6,500.00$6,500.00 $8,500.00$8,500.00 $8,500.00$8,500.00 
      $681,539.25  $702,092.00  $719,029.75 
 
10
11
12
Estimated Cost: $800,000.00
Contractor: 
K & E Flatwork Inc.
Funding Source: 100% Park & Institutional Road Fund, 501 Blackhawk Trail


Eldridge IA  52748    
Plan Sets Requested: 18
Quantities
5632854404
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1TOPSOIL STRIP/STOCKPILE/RESPREAD180C.Y.$12.00$2,160.00 $0.00 $0.00 
2TOPSOIL STRIP/STOCKPILE/RESPREAD (PARKING/SITE PADS)2000C.Y.$12.00$24,000.00 $0.00 $0.00 
3UNCLASSIFIED EXCAVATION9750C.Y.$6.00$58,500.00 $0.00 $0.00 
4UNCLASSIFIED EXCAVATION (PARKING)50C.Y.$50.00$2,500.00 $0.00 $0.00 
5SPECIAL SUBGRADE COMPACTION9165S.Y.$1.25$11,456.25 $0.00 $0.00 
6SPECIAL SUBGRADE COMPACTION (PARKING)70S.Y.$1.25$87.50 $0.00 $0.00 
7SEEDING/FERTILIZING/MULCHING0.5Acres$1,600.00$800.00 $0.00 $0.00 
8SEEDING/FERTILIZING/MULCHING (PARKING/SITE PADS)3Acres$1,600.00$4,800.00 $0.00 $0.00 
9SILT FENCE2700L.F.$1.75$4,725.00 $0.00 $0.00 
10SILT FENCE (PARKING/SITE PADS)2550L.F.$1.75$4,462.50 $0.00 $0.00 
11CLEARING AND GRUBBING0.25Acres$16,000.00$4,000.00 $0.00 $0.00 
12EROSION CONTROL AND SWPPP MONITORING1L.S.$7,000.00$7,000.00 $0.00 $0.00 
13STABILIZED CONSTRUCTION ACCESS1L.S.$2,000.00$2,000.00 $0.00 $0.00 
14ROLLED EROSION CONTROL PRODUCT800S.Y.$2.50$2,000.00 $0.00 $0.00 
1715" ADS N-12 STORM SEWER PIPE640L.F.$41.00$26,240.00 $0.00 $0.00 
1815" RCP FLARED END SECTION W/ GUARD1Each$1,550.00$1,550.00 $0.00 $0.00 
19INTAKE SW-5077Each$2,250.00$15,750.00 $0.00 $0.00 
20STORM SEWER MANHOLE STANDARD 48"5Each$2,500.00$12,500.00 $0.00 $0.00 
21SUBDRAIN, 4"2950L.F.$6.00$17,700.00 $0.00 $0.00 
22SUBDRAIN OUTLET10Each$200.00$2,000.00 $0.00 $0.00 
23PAVEMENT REMOVAL9950S.Y.$3.00$29,850.00 $0.00 $0.00 
24PCC STREET PAVING, CLASS C, 6" W/ MODIFIED 6" SUBBASE9165S.Y.$36.56$335,072.40 $0.00 $0.00 
25(2") 3/8" MINUS CRUSHED STONE680Tons$24.00$16,320.00 $0.00 $0.00 
26(6") CLASS "A" GRANULAR (SITE PADS)3180Tons$18.00$57,240.00 $0.00 $0.00 
27ENGINEERING FABRIC9500S.Y.$2.50$23,750.00 $0.00 $0.00 
28PAVEMENT REMOVAL (PARKING)65S.Y.$10.00$650.00 $0.00 $0.00 
29PCC PAVING, CLASS C, 6" W/6" SUBBASE (PARKING)70S.Y.$50.00$3,500.00 $0.00 $0.00 
30MOBILIZATION1L.S.$50,000.00$50,000.00 $0.00 $0.00 
31CONSTRUCTION STAKING1L.S.$20,000.00$20,000.00 $0.00 $0.00 
      $740,613.65  $0.00  $0.00 
 



 

10/14/2026