 Bids For:  Location:   Silver Lake WMA  Date: 10/20/2011  Project No.  
  Renov/replace outlet add drainp  County:   WORTH  Time: 11:00 A.M.  12-03-98-01

 

 
1
2
3
Estimated Cost: $267,000.00
Contractor: 
Landwehr Construction Inc.A1 Excavating & Drainage Inc.Reilly Construction
Funding Source: 80% Lake Restoration, 20% Other, 846 South 33rd St
505 - 410th St
110 E Main St
PO Box 99
St Cloud MN  56301Joice IA  50446Ossian IA  52161
Plan Sets Requested: 14
Quantities
320-252-1494641-588-3576563-532-9211
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$24,130.86$24,130.86 $3,000.00$3,000.00 $7,000.00$7,000.00 
2Clearing & Grubbing 1L.S.$3,671.63$3,671.63 $5,000.00$5,000.00 $4,800.00$4,800.00 
3Discharge Channel Excavate & Level Spoil500C.Y.$4.59$2,295.00 $50.00$25,000.00 $16.75$8,375.00 
4Existing Concrete Spillway Removal1L.S.$2,753.72$2,753.72 $2,000.00$2,000.00 $3,500.00$3,500.00 
5Lake Channel Excavation 1,900 ft.4200C.Y.$1.74$7,308.00 $10.00$42,000.00 $16.75$70,350.00 
6Class 10 Excavation500C.Y.$9.18$4,590.00 $50.00$25,000.00 $11.75$5,875.00 
712' x 4' Precast RCBC12L.F.$467.91$5,614.92 $448.00$5,376.00 $625.00$7,500.00 
812' x 6' Precast RCBC24L.F.$531.77$12,762.48 $518.00$12,432.00 $680.00$16,320.00 
912' x 8' Precast RCBC24L.F.$595.62$14,294.88 $437.50$10,500.00 $733.00$17,592.00 
1012' x 10' Precast RCBC36L.F.$659.48$23,741.28 $528.00$19,008.00 $788.00$28,368.00 
11Cutoff Walls 65.4L.F.$176.07$11,514.978 $40.00$2,616.00 $135.00$8,829.00 
12Granular Filter Diaphragm50Tons$115.98$5,799.00 $30.00$1,500.00 $36.00$1,800.00 
13Aluminum Fish Barriers665LB.$14.59$9,702.35 $10.00$6,650.00 $19.00$12,635.00 
14Aluminum Fish Barrier Rake1Each$254.00$254.00 $200.00$200.00 $550.00$550.00 
15Concrete Weir Buttress Wall12L.F.$183.51$2,202.12 $10.00$120.00 $214.00$2,568.00 
16Stop Log Weir Guides575LB.$15.20$8,740.00 $5.00$2,875.00 $5.25$3,018.75 
17Stop Logs Aluminum1300LB.$6.98$9,074.00 $5.00$6,500.00 $5.65$7,345.00 
18Fish Barrier Portable Hoist Assembly1Each$1,209.53$1,209.53 $500.00$500.00 $2,400.00$2,400.00 
19Steel Catwalk 48" Wide2100LB.$7.09$14,889.00 $3.00$6,300.00 $2.10$4,410.00 
20Steel Catwalk 36" Wide1930LB.$7.25$13,992.50 $3.00$5,790.00 $2.10$4,053.00 
21Stainless Steel Protective Screens 150LB.$37.75$5,662.50 $10.00$1,500.00 $41.50$6,225.00 
228' Ht. Chainlink Fence & Gates96L.F.$119.38$11,460.48 $40.00$3,840.00 $106.00$10,176.00 
23Imported Compacted Fill800C.Y.$8.97$7,176.00 $20.00$16,000.00 $14.40$11,520.00 
24Class E Revetment375Tons$39.83$14,936.25 $40.00$15,000.00 $35.70$13,387.50 
25Geotextile 1000S.Y.$2.42$2,420.00 $7.00$7,000.00 $4.40$4,400.00 
26Geogrid360S.Y.$7.26$2,613.60 $7.00$2,520.00 $5.60$2,016.00 
271/2" Crushed Road Stone100Tons$22.92$2,292.00 $20.00$2,000.00 $21.00$2,100.00 
28Class 10 Excavation 300C.Y.$3.06$918.00 $20.00$6,000.00 $11.75$3,525.00 
29Imported Compacted Fill400C.Y.$8.97$3,588.00 $20.00$8,000.00 $14.40$5,760.00 
30Class E Revetment120Tons$40.44$4,852.80 $40.00$4,800.00 $35.70$4,284.00 
31Geotextile 200S.Y.$2.42$484.00 $7.00$1,400.00 $4.40$880.00 
32Erosion Control Matting100SQ.$2.82$282.00 $10.00$1,000.00 $20.00$2,000.00 
33Seeding, Fertilizing, & Mulching 1Acres$1,013.57$1,013.57 $1,000.00$1,000.00 $2,800.00$2,800.00 
3410' x 5' Precast RCBC24L.F.$701.17$16,828.08 $518.00$12,432.00 $664.00$15,936.00 
35Cutoff Walls34.7L.F.$111.73$3,877.031 $0.00$0.00 $135.00$4,684.50 
3610' x 5' Precast End Sections2Each$5,553.37$11,106.74 $2,000.00$4,000.00 $3,800.00$7,600.00 
37Class E Revetment40Tons$39.80$1,592.00 $40.00$1,600.00 $35.70$1,428.00 
38Geotextile 32S.Y.$3.63$116.16 $7.00$224.00 $4.40$140.80 
391/2" Crushed Road Stone50Tons$24.22$1,211.00 $20.00$1,000.00 $21.00$1,050.00 
4036" C.M.P. 14 GA.96L.F.$68.73$6,598.08 $125.00$12,000.00 $63.00$6,048.00 
4136" C.M.P. End Sections8Each$471.38$3,771.04 $150.00$1,200.00 $366.00$2,928.00 
42Geotextile 110S.Y.$2.42$266.20 $7.00$770.00 $4.40$484.00 
431/2" Crushed Road Stone50Tons$24.22$1,211.00 $20.00$1,000.00 $21.00$1,050.00 
      $282,816.779  $286,653.00  $327,711.55 
 
4
5
6
Estimated Cost: $267,000.00
Contractor: 
Ceres Environmental Services Inc.Larson Contracting Central LLCMinnowa Construction Inc
Funding Source: 80% Lake Restoration, 20% Other, 3825 85th Ave N
508 W Main St
850 Wickett Dr NW
Box 188
Brooklyn Park MN  55443Lake Mills IA  50450Harmony MN  55939
Plan Sets Requested: 14
Quantities
763-425-8822641-592-5800507-886-6162
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$16,300.00$16,300.00 $15,000.00$15,000.00 $20,000.00$20,000.00 
2Clearing & Grubbing 1L.S.$2,710.00$2,710.00 $3,350.00$3,350.00 $3,000.00$3,000.00 
3Discharge Channel Excavate & Level Spoil500C.Y.$3.25$1,625.00 $8.65$4,325.00 $10.00$5,000.00 
4Existing Concrete Spillway Removal1L.S.$1,510.00$1,510.00 $350.00$350.00 $5,000.00$5,000.00 
5Lake Channel Excavation 1,900 ft.4200C.Y.$4.45$18,690.00 $8.05$33,810.00 $12.00$50,400.00 
6Class 10 Excavation500C.Y.$4.30$2,150.00 $7.50$3,750.00 $10.00$5,000.00 
712' x 4' Precast RCBC12L.F.$519.00$6,228.00 $621.00$7,452.00 $550.00$6,600.00 
812' x 6' Precast RCBC24L.F.$586.00$14,064.00 $680.00$16,320.00 $600.00$14,400.00 
912' x 8' Precast RCBC24L.F.$653.00$15,672.00 $739.00$17,736.00 $650.00$15,600.00 
1012' x 10' Precast RCBC36L.F.$771.00$27,756.00 $800.00$28,800.00 $700.00$25,200.00 
11Cutoff Walls 65.4L.F.$44.90$2,936.46 $103.50$6,768.90 $200.00$13,080.00 
12Granular Filter Diaphragm50Tons$22.20$1,110.00 $37.50$1,875.00 $40.00$2,000.00 
13Aluminum Fish Barriers665LB.$44.00$29,260.00 $42.00$27,930.00 $55.00$36,575.00 
14Aluminum Fish Barrier Rake1Each$812.00$812.00 $2,600.00$2,600.00 $600.00$600.00 
15Concrete Weir Buttress Wall12L.F.$371.00$4,452.00 $195.50$2,346.00 $300.00$3,600.00 
16Stop Log Weir Guides575LB.$44.60$25,645.00 $24.00$13,800.00 $35.00$20,125.00 
17Stop Logs Aluminum1300LB.$11.90$15,470.00 $20.00$26,000.00 $12.00$15,600.00 
18Fish Barrier Portable Hoist Assembly1Each$1,260.00$1,260.00 $1,950.00$1,950.00 $1,200.00$1,200.00 
19Steel Catwalk 48" Wide2100LB.$9.25$19,425.00 $10.00$21,000.00 $9.00$18,900.00 
20Steel Catwalk 36" Wide1930LB.$9.20$17,756.00 $10.00$19,300.00 $9.00$17,370.00 
21Stainless Steel Protective Screens 150LB.$59.10$8,865.00 $30.00$4,500.00 $60.00$9,000.00 
228' Ht. Chainlink Fence & Gates96L.F.$64.10$6,153.60 $163.90$15,734.40 $106.00$10,176.00 
23Imported Compacted Fill800C.Y.$14.80$11,840.00 $8.50$6,800.00 $15.00$12,000.00 
24Class E Revetment375Tons$30.00$11,250.00 $37.50$14,062.50 $50.00$18,750.00 
25Geotextile 1000S.Y.$3.65$3,650.00 $3.45$3,450.00 $4.00$4,000.00 
26Geogrid360S.Y.$8.85$3,186.00 $3.45$1,242.00 $10.00$3,600.00 
271/2" Crushed Road Stone100Tons$21.30$2,130.00 $30.75$3,075.00 $20.00$2,000.00 
28Class 10 Excavation 300C.Y.$4.30$1,290.00 $7.50$2,250.00 $10.00$3,000.00 
29Imported Compacted Fill400C.Y.$14.80$5,920.00 $8.50$3,400.00 $15.00$6,000.00 
30Class E Revetment120Tons$30.00$3,600.00 $37.50$4,500.00 $45.00$5,400.00 
31Geotextile 200S.Y.$3.65$730.00 $3.45$690.00 $5.00$1,000.00 
32Erosion Control Matting100SQ.$22.40$2,240.00 $5.00$500.00 $20.00$2,000.00 
33Seeding, Fertilizing, & Mulching 1Acres$1,920.00$1,920.00 $875.00$875.00 $2,800.00$2,800.00 
3410' x 5' Precast RCBC24L.F.$693.00$16,632.00 $677.00$16,248.00 $625.00$15,000.00 
35Cutoff Walls34.7L.F.$44.90$1,558.03 $103.50$3,591.45 $200.00$6,940.00 
3610' x 5' Precast End Sections2Each$5,520.00$11,040.00 $2,850.00$5,700.00 $5,600.00$11,200.00 
37Class E Revetment40Tons$30.00$1,200.00 $37.50$1,500.00 $50.00$2,000.00 
38Geotextile 32S.Y.$3.65$116.80 $3.45$110.40 $5.00$160.00 
391/2" Crushed Road Stone50Tons$21.30$1,065.00 $30.75$1,537.50 $20.00$1,000.00 
4036" C.M.P. 14 GA.96L.F.$85.00$8,160.00 $57.65$5,534.40 $65.00$6,240.00 
4136" C.M.P. End Sections8Each$729.00$5,832.00 $473.40$3,787.20 $400.00$3,200.00 
42Geotextile 110S.Y.$3.65$401.50 $3.45$379.50 $5.00$550.00 
431/2" Crushed Road Stone50Tons$21.30$1,065.00 $30.75$1,537.50 $20.00$1,000.00 
      $334,676.39  $355,467.75  $406,266.00 
 
7
8
9
Estimated Cost: $267,000.00
Contractor: 
Rognes Bros Excavating Inc
Funding Source: 80% Lake Restoration, 20% Other, 225 W Main


Lake Mills IA  50450    
Plan Sets Requested: 14
Quantities
641-592-8932
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$10,000.00$10,000.00 $0.00 $0.00 
2Clearing & Grubbing 1L.S.$5,000.00$5,000.00 $0.00 $0.00 
3Discharge Channel Excavate & Level Spoil500C.Y.$8.00$4,000.00 $0.00 $0.00 
4Existing Concrete Spillway Removal1L.S.$3,000.00$3,000.00 $0.00 $0.00 
5Lake Channel Excavation 1,900 ft.4200C.Y.$12.00$50,400.00 $0.00 $0.00 
6Class 10 Excavation500C.Y.$8.00$4,000.00 $0.00 $0.00 
712' x 4' Precast RCBC12L.F.$845.00$10,140.00 $0.00 $0.00 
812' x 6' Precast RCBC24L.F.$958.00$22,992.00 $0.00 $0.00 
912' x 8' Precast RCBC24L.F.$1,070.00$25,680.00 $0.00 $0.00 
1012' x 10' Precast RCBC36L.F.$1,182.00$42,552.00 $0.00 $0.00 
11Cutoff Walls 65.4L.F.$250.00$16,350.00 $0.00 $0.00 
12Granular Filter Diaphragm50Tons$28.00$1,400.00 $0.00 $0.00 
13Aluminum Fish Barriers665LB.$30.00$19,950.00 $0.00 $0.00 
14Aluminum Fish Barrier Rake1Each$6,000.00$6,000.00 $0.00 $0.00 
15Concrete Weir Buttress Wall12L.F.$417.00$5,004.00 $0.00 $0.00 
16Stop Log Weir Guides575LB.$30.00$17,250.00 $0.00 $0.00 
17Stop Logs Aluminum1300LB.$30.00$39,000.00 $0.00 $0.00 
18Fish Barrier Portable Hoist Assembly1Each$2,500.00$2,500.00 $0.00 $0.00 
19Steel Catwalk 48" Wide2100LB.$6.50$13,650.00 $0.00 $0.00 
20Steel Catwalk 36" Wide1930LB.$6.50$12,545.00 $0.00 $0.00 
21Stainless Steel Protective Screens 150LB.$30.00$4,500.00 $0.00 $0.00 
228' Ht. Chainlink Fence & Gates96L.F.$120.00$11,520.00 $0.00 $0.00 
23Imported Compacted Fill800C.Y.$15.00$12,000.00 $0.00 $0.00 
24Class E Revetment375Tons$45.00$16,875.00 $0.00 $0.00 
25Geotextile 1000S.Y.$3.50$3,500.00 $0.00 $0.00 
26Geogrid360S.Y.$7.00$2,520.00 $0.00 $0.00 
271/2" Crushed Road Stone100Tons$24.00$2,400.00 $0.00 $0.00 
28Class 10 Excavation 300C.Y.$5.00$1,500.00 $0.00 $0.00 
29Imported Compacted Fill400C.Y.$15.00$6,000.00 $0.00 $0.00 
30Class E Revetment120Tons$45.00$5,400.00 $0.00 $0.00 
31Geotextile 200S.Y.$3.50$700.00 $0.00 $0.00 
32Erosion Control Matting100SQ.$25.00$2,500.00 $0.00 $0.00 
33Seeding, Fertilizing, & Mulching 1Acres$3,300.00$3,300.00 $0.00 $0.00 
3410' x 5' Precast RCBC24L.F.$800.00$19,200.00 $0.00 $0.00 
35Cutoff Walls34.7L.F.$216.00$7,495.20 $0.00 $0.00 
3610' x 5' Precast End Sections2Each$5,400.00$10,800.00 $0.00 $0.00 
37Class E Revetment40Tons$45.00$1,800.00 $0.00 $0.00 
38Geotextile 32S.Y.$3.50$112.00 $0.00 $0.00 
391/2" Crushed Road Stone50Tons$24.00$1,200.00 $0.00 $0.00 
4036" C.M.P. 14 GA.96L.F.$67.00$6,432.00 $0.00 $0.00 
4136" C.M.P. End Sections8Each$535.00$4,280.00 $0.00 $0.00 
42Geotextile 110S.Y.$3.50$385.00 $0.00 $0.00 
431/2" Crushed Road Stone50Tons$24.00$1,200.00 $0.00 $0.00 
      $437,032.20  $0.00  $0.00 
 



 