|
IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | Lake Darling State Park | Date: 6/2/2011 | Project No. |
| foundations and utility work | County: | WASHINGTON | Time: 3:00 p.m. | 11-06-92-04 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $64,136.00 | Contractor: | Bi-State Contracting Inc | |||||||||||
| Funding Source: 100% I-JOBS 2, | 110 N. Washington Rd. | ||||||||||||
| West Burlington IA 52655 | |||||||||||||
| Plan Sets Requested: 0 | Quantities | 319-752-6074 | |||||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Building Demolition | 2 | Each | $5,494.00 | $10,988.00 | $0.00 | $0.00 | ||||||
| 2 | New Building Foundations | 2 | Each | $21,976.00 | $43,952.00 | $0.00 | $0.00 | ||||||
| 3 | Cut and Cap Existing Water | 2 | Each | $832.50 | $1,665.00 | $0.00 | $0.00 | ||||||
| 4 | Connect to Existing Water | 2 | Each | $804.00 | $1,608.00 | $0.00 | $0.00 | ||||||
| 5 | Class "A" Crushed Stone Base Material | 86 | Tons | $40.20 | $3,457.20 | $0.00 | $0.00 | ||||||
| 6 | Shower Stubs & Connection After Building Connection | 2 | Each | $10,372.50 | $20,745.00 | $0.00 | $0.00 | ||||||
| 7 | PCC-C4 Mix, 4" Thickness (Sidewalk 5' Width) | 17 | C.Y. | $649.88 | $11,047.96 | $0.00 | $0.00 | ||||||
| 8 | 2" PVC SDR21 Water Pipe | 78 | L.F. | $40.21 | $3,136.38 | $0.00 | $0.00 | ||||||
| 9 | 2" PVC SDR35 Sewer | 112 | L.F. | $40.20 | $4,502.40 | $0.00 | $0.00 | ||||||
| 10 | 4" PVC SDR35 Sewer | 88 | L.F. | $35.64 | $3,136.32 | $0.00 | $0.00 | ||||||
| 11 | Connect to Existing Sanitary Sewer | 2 | Each | $1,296.00 | $2,592.00 | $0.00 | $0.00 | ||||||
| 12 | Draw Down Pit | 2 | Each | $4,148.50 | $8,297.00 | $0.00 | $0.00 | ||||||
| 13 | Detectabel Warning Tape 3" (Water) | 76 | L.F. | $2.68 | $203.68 | $0.00 | $0.00 | ||||||
| 14 | Detectable Warning Tape 3" (Sewer) | 15 | L.F. | $2.67 | $40.05 | $0.00 | $0.00 | ||||||
| 15 | 2" Sch. 80 PVC Electrical Conduit | 100 | L.F. | $10.99 | $1,099.00 | $0.00 | $0.00 | ||||||
| 16 | Seed, Fertilize, and mulch | 1 | L.S. | $4,020.00 | $4,020.00 | $0.00 | $0.00 | ||||||
| $120,489.99 | $0.00 | $0.00 | |||||||||||
10/13/2026