IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Prairie Rose State Park  Date: 8/1/2013  Project No.  
  Dredge Spoil Containment Site  County:   SHELBY  Time: 11:00 a.m.  12-04-83-05

 

 
1
2
3
Estimated Cost: $675,000.00
Contractor: 
Spring Lake ConstructionKevin Kent ConstructionCJ Moyna & Sons, Inc.
Funding Source: 100% Lake Restoration, 4123 NW 95th PL
15157 US Hwy 34
24412 Hwy 13
Polk City IA  50226Lucas IA  50151Elkader IA  52043
Plan Sets Requested: 9
Quantities
712-830-4515641-766-6126563-245-1442
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$7,000.00$7,000.00 $10,000.00$10,000.00 $30,000.00$30,000.00 
2Topsoiling26538C.Y.$1.80$47,768.40 $2.00$53,076.00 $3.00$79,614.00 
3Class 10 Excavation4169C.Y.$2.00$8,338.00 $1.90$7,921.10 $4.00$16,676.00 
4Class 10 Excavation (Embankment)132700C.Y.$1.47$195,069.00 $1.85$245,495.00 $1.90$252,130.00 
5Class 10 Excavation (Waste)180000C.Y.$1.47$264,600.00 $1.70$306,000.00 $1.60$288,000.00 
6Silt Fence3382L.F.$2.00$6,764.00 $1.80$6,087.60 $1.80$6,087.60 
7Field Fence3217L.F.$4.00$12,868.00 $5.50$17,693.50 $5.35$17,210.95 
8Seeding and Fertilizing6.1Acres$800.00$4,880.00 $1,205.00$7,350.50 $1,205.00$7,350.50 
9Fine Drainfill109Tons$27.00$2,943.00 $32.00$3,488.00 $30.00$3,270.00 
1030" SMP187L.F.$88.00$16,456.00 $85.50$15,988.50 $30.00$5,610.00 
1130" Apron, Metal1Each$1,500.00$1,500.00 $1,000.00$1,000.00 $1,000.00$1,000.00 
12Class "D" Revetment1489Tons$32.00$47,648.00 $35.50$52,859.50 $38.00$56,582.00 
13Construction Staking1L.S.$4,000.00$4,000.00 $2,500.00$2,500.00 $500.00$500.00 
14Engineering Fabric1472S.Y.$3.50$5,152.00 $2.00$2,944.00 $2.00$2,944.00 
15Tile Plugging3Each$1,200.00$3,600.00 $100.00$300.00 $500.00$1,500.00 
164" Perforated PVC with cap, Sch. 40 or SDR 23.571L.F.$8.00$568.00 $18.00$1,278.00 $30.00$2,130.00 
      $629,154.40  $733,981.70  $770,605.05 
 
 
4
5
6
Estimated Cost: $675,000.00
Contractor: 
Steger Construction Inc.Joy Dirt Construction Dixon Construction Co.
Funding Source: 100% Lake Restoration, 3297 Vine Rd
202 State St
409 Driftwood St
Dyersville IA  52040Cushing IA  51018Correctionville IA  51046
Plan Sets Requested: 9
Quantities
563-875-7876712-384-2700712-372-4224
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$20,000.00$20,000.00 $27,075.16$27,075.16 $117,000.00$117,000.00 
2Topsoiling26538C.Y.$3.88$102,967.44 $3.25$86,248.50 $2.00$53,076.00 
3Class 10 Excavation4169C.Y.$2.00$8,338.00 $1.80$7,504.20 $2.00$8,338.00 
4Class 10 Excavation (Embankment)132700C.Y.$1.89$250,803.00 $2.35$311,845.00 $1.70$225,590.00 
5Class 10 Excavation (Waste)180000C.Y.$1.84$331,200.00 $1.75$315,000.00 $1.65$297,000.00 
6Silt Fence3382L.F.$2.00$6,764.00 $2.05$6,933.10 $2.07$7,000.74 
7Field Fence3217L.F.$4.35$13,993.95 $5.25$16,889.25 $3.48$11,195.16 
8Seeding and Fertilizing6.1Acres$1,205.00$7,350.50 $1,425.00$8,692.50 $1,250.00$7,625.00 
9Fine Drainfill109Tons$18.50$2,016.50 $24.70$2,692.30 $100.00$10,900.00 
1030" SMP187L.F.$129.00$24,123.00 $89.70$16,773.90 $200.00$37,400.00 
1130" Apron, Metal1Each$275.00$275.00 $750.00$750.00 $2,000.00$2,000.00 
12Class "D" Revetment1489Tons$38.00$56,582.00 $38.06$56,671.34 $59.00$87,851.00 
13Construction Staking1L.S.$5,000.00$5,000.00 $4,000.00$4,000.00 $7,500.00$7,500.00 
14Engineering Fabric1472S.Y.$2.00$2,944.00 $2.10$3,091.20 $5.00$7,360.00 
15Tile Plugging3Each$200.00$600.00 $200.00$600.00 $3,000.00$9,000.00 
164" Perforated PVC with cap, Sch. 40 or SDR 23.571L.F.$18.00$1,278.00 $12.19$865.49 $50.00$3,550.00 
      $834,235.39  $865,631.94  $892,385.90 
 
7
8
9
Estimated Cost: $675,000.00
Contractor: 
Peterson Contractors Inc.K & L Construction, Inc.
Funding Source: 100% Lake Restoration, 104 Blackhawk St
501 S Ridge Rd

Reinbeck IA  50669Sergeant Bluff IA  51054  
Plan Sets Requested: 9
Quantities
319-345-2713712-943-2939
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1Mobilization1L.S.$38,950.00$38,950.00 $25,000.00$25,000.00 $0.00 
2Topsoiling26538C.Y.$3.20$84,921.60 $4.00$106,152.00 $0.00 
3Class 10 Excavation4169C.Y.$3.57$14,883.33 $2.50$10,422.50 $0.00 
4Class 10 Excavation (Embankment)132700C.Y.$2.20$291,940.00 $2.45$325,115.00 $0.00 
5Class 10 Excavation (Waste)180000C.Y.$2.05$369,000.00 $2.15$387,000.00 $0.00 
6Silt Fence3382L.F.$2.00$6,764.00 $2.00$6,764.00 $0.00 
7Field Fence3217L.F.$5.40$17,371.80 $4.00$12,868.00 $0.00 
8Seeding and Fertilizing6.1Acres$1,262.50$7,701.25 $1,050.00$6,405.00 $0.00 
9Fine Drainfill109Tons$42.65$4,648.85 $19.51$2,126.59 $0.00 
1030" SMP187L.F.$120.30$22,496.10 $138.50$25,899.50 $0.00 
1130" Apron, Metal1Each$1,000.00$1,000.00 $450.00$450.00 $0.00 
12Class "D" Revetment1489Tons$36.66$54,586.74 $45.10$67,153.90 $0.00 
13Construction Staking1L.S.$5,000.00$5,000.00 $15,000.00$15,000.00 $0.00 
14Engineering Fabric1472S.Y.$3.00$4,416.00 $3.00$4,416.00 $0.00 
15Tile Plugging3Each$60.00$180.00 $100.00$300.00 $0.00 
164" Perforated PVC with cap, Sch. 40 or SDR 23.571L.F.$14.90$1,057.90 $10.00$710.00 $0.00 
      $924,917.57  $995,782.49  $0.00 
 



 