|
IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | Estes WRP WMA | Date: 9/9/2010 | Project No. |
| Wetland Restoration & Design | County: | DICKINSON | Time: 3:00 p.m. | 11-01-30-01 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $57,000.00 | Contractor: | Valley Contracting Inc | |||||||||||
| Funding Source: 100% Federal-NRCS, | 1850 Hwy 4 South Box 142 | ||||||||||||
| Estherville IA 51334 | |||||||||||||
| Plan Sets Requested: 0 | Quantities | 712-362-4969 | |||||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | Dike Seeding | 1 | Acres | $285.00 | $285.00 | $0.00 | $0.00 | ||||||
| 2 | Wetland Seeding | 4 | Acres | $750.00 | $3,000.00 | $0.00 | $0.00 | ||||||
| 3 | Outlet Channel Excavation | 1983 | C.Y. | $2.50 | $4,957.50 | $0.00 | $0.00 | ||||||
| 4 | Tile Breaks | 5 | Each | $200.00 | $1,000.00 | $0.00 | $0.00 | ||||||
| 5 | Tile Investigation | 500 | L.F. | $2.00 | $1,000.00 | $0.00 | $0.00 | ||||||
| 6 | Earthfill | 2069 | C.Y. | $2.00 | $4,138.00 | $0.00 | $0.00 | ||||||
| 7 | Aluminum Toewall Structure | 1 | Each | $7,500.00 | $7,500.00 | $0.00 | $0.00 | ||||||
| 8 | 18" Dual Wall P.E. Tubing (non-perf) | 370 | L.F. | $30.00 | $11,100.00 | $0.00 | $0.00 | ||||||
| 9 | 12" Dual Wall P.E. Tubing (non-perf) | 1190 | L.F. | $13.00 | $15,470.00 | $0.00 | $0.00 | ||||||
| 10 | 8" Corr. P.E. Tubing (non-perf) | 74 | L.F. | $12.00 | $888.00 | $0.00 | $0.00 | ||||||
| 11 | 5" Corr. P.E. Tubing (perf) | 2100 | L.F. | $3.00 | $6,300.00 | $0.00 | $0.00 | ||||||
| 12 | 5" Corr. P.E. Tubing (non-perf) | 600 | L.F. | $3.00 | $1,800.00 | $0.00 | $0.00 | ||||||
| 13 | 12" Diameter Intake | 1 | Each | $600.00 | $600.00 | $0.00 | $0.00 | ||||||
| 14 | 6" Diameter Intake | 1 | Each | $230.00 | $230.00 | $0.00 | $0.00 | ||||||
| 15 | Water Control Structure | 1 | Each | $900.00 | $900.00 | $0.00 | $0.00 | ||||||
| 16 | 21" Diameter CMP Tile Outlet | 20 | L.F. | $30.00 | $600.00 | $0.00 | $0.00 | ||||||
| 17 | 15" Diameter CMP Tile Outlet | 20 | L.F. | $25.00 | $500.00 | $0.00 | $0.00 | ||||||
| 18 | 6" Diameter CMP Tile Outlet | 20 | L.F. | $12.00 | $240.00 | $0.00 | $0.00 | ||||||
| 19 | Rip Rap | 110 | Tons | $36.00 | $3,960.00 | $0.00 | $0.00 | ||||||
| $64,468.50 | $0.00 | $0.00 | |||||||||||
10/13/2026