 Bids For:  Location:   Union Grove State Park  Date: 6/17/2010  Project No.  
  Utlilites for shower, cabin, campground  County:   TAMA  Time: 3:00 p.m.  10-05-86-05

 

 
1
2
3
Estimated Cost:
Contractor: 
Hatch Grading & Contracting Inc.SCHOON CONSTRUCTIONWeidner Construction Inc
Funding Source: 100% REAP OS Acquisition & Development, 101 Crisman St
603 PINROSE ST
2607 - 255th St
Dysart IA  52224GRINNELL IA  50112Marshalltown IA  50158
Plan Sets Requested: 4
Quantities
319-476-2626641-236-8395641-752-6665
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MACADAM STONE BASE MATERIAL(5" DEPTH)311Tons$17.50$5,442.50 $24.45$7,603.95 $33.45$10,402.95 
2ENGINEERING FABRIC1234S.Y.$1.04$1,283.36 $1.75$2,159.50 $1.84$2,270.56 
3EARTHWORK(CAMP PADS/CXT BASE-CLASS 10 EXCAVATION)345C.Y.$28.99$10,001.55 $7.00$2,415.00 $14.00$4,830.00 
4GRANULAR SURFACING, CRUSHED LIMESTONE 1/2"-3/8" WITH FINES (2" DEPTH)123Tons$16.70$2,054.10 $25.40$3,124.20 $33.40$4,108.20 
5CLASS "A" CRUSHED STONE BASE MATERIAL128Tons$16.70$2,137.60 $23.20$2,969.60 $32.20$4,121.60 
6SHOWER STUB-UPS & CONNECTION AFTER BUILDING PLACEMENT1L.S.$5,300.00$5,300.00 $2,500.00$2,500.00 $500.00$500.00 
7PCC-C4 MIX. 6" THICKNESS (SIDEWALK & PARKING)139S.Y.$48.55$6,748.45 $43.25$6,011.75 $49.50$6,880.50 
82" PVC SDR 21 WATER PIPE1476L.F.$6.00$8,856.00 $4.50$6,642.00 $15.30$22,582.80 
91" PE WATER SERVICE TUBING340L.F.$12.35$4,199.00 $4.71$1,601.40 $16.08$5,467.20 
10TRACER WIRE STATION1L.S.$800.00$800.00 $35.00$35.00 $17.50$17.50 
11#12 SOLID TRACER WIRE1L.S.$300.00$300.00 $575.00$575.00 $415.50$415.50 
12STOP AND WASTE VALVE1Each$350.00$350.00 $1,000.00$1,000.00 $263.50$263.50 
13DISINFECTION1L.S.$600.00$600.00 $500.00$500.00 $1,000.00$1,000.00 
14DETECTABLE WARNING TAPE 3" (WATER)1476L.F.$0.10$147.60 $0.25$369.00 $0.04$59.04 
152" BALL VALVE5Each$365.00$1,825.00 $360.00$1,800.00 $233.50$1,167.50 
161" CORPORATION STOP12Each$150.00$1,800.00 $60.00$720.00 $36.75$441.00 
171" CURB STOP WITH BOX14Each$130.50$1,827.00 $120.00$1,680.00 $83.50$1,169.00 
18YARD HYDRANT14Each$345.00$4,830.00 $950.00$13,300.00 $185.00$2,590.00 
192" CAP AND BLOCK1Each$100.00$100.00 $50.00$50.00 $11.50$11.50 
20DISCONNECT & CAP EXISTING WATER TO CAMPGROUND1L.S.$350.00$350.00 $100.00$100.00 $500.00$500.00 
212" TEES3Each$75.00$225.00 $50.00$150.00 $26.00$78.00 
224" DIAMETER PVC SDR 35 SEWER PIPE662L.F.$8.50$5,627.00 $5.75$3,806.50 $24.79$16,410.98 
236" DIAMETER PVC SDR 35 SEWER PIPE702L.F.$15.50$10,881.00 $7.25$5,089.50 $25.38$17,816.76 
24MANHOLE4Each$2,050.00$8,200.00 $3,000.00$12,000.00 $1,757.50$7,030.00 
25DETECTABLE WARNING TAPE 3" (SEWER)1364L.F.$0.20$272.80 $0.25$341.00 $0.04$54.56 
26RV TO SEWER HOOKUP9Each$100.00$900.00 $640.00$5,760.00 $43.57$392.13 
2780' SEPTIC INFILTRATION CHAMBERS5Each$1,100.00$5,500.00 $710.00$3,550.00 $1,487.10$7,435.50 
282000 GAL. CONCRETE SEPTIC TANK1Each$3,800.00$3,800.00 $2,500.00$2,500.00 $2,995.00$2,995.00 
29CONNECTION TO RV DUMP STATION1Each$450.00$450.00 $1,200.00$1,200.00 $550.00$550.00 
306" X 4" SANITARY SEWER WYES9Each$36.59$329.31 $50.00$450.00 $123.33$1,109.97 
31PUMP EXISTING DUMP STATION1L.S.$350.00$350.00 $500.00$500.00 $1,000.00$1,000.00 
32#2 AWG CABLE, TYPE USE656L.F.$2.63$1,725.28 $3.54$2,322.24 $2.57$1,685.92 
33#4 AWG CABLE, TYPE USE767L.F.$1.90$1,457.30 $2.58$1,978.86 $2.39$1,833.13 
34#8 AWG CABLE, TYPE USE116L.F.$1.09$126.44 $1.82$211.12 $1.66$192.56 
353/0 AWG CABLE, TYPE USE1323L.F.$5.77$7,633.71 $7.53$9,962.19 $6.32$8,361.36 
36350 MCL CABLE, TYPE USE1995L.F.$9.45$18,852.75 $11.72$23,381.40 $9.28$18,513.60 
37TRENCH- SINGLE CIRCUIT SECONDARY1100L.F.$1.80$1,980.00 $2.28$2,508.00 $3.00$3,300.00 
38800 AMP PANEL1Each$6,200.00$6,200.00 $7,272.00$7,272.00 $5,353.00$5,353.00 
39DETECTABLE WARNING TAPE 3" (ELECTRICAL)1100L.F.$0.18$198.00 $0.41$451.00 $0.04$44.00 
403" SCHEDULE 80 PVC ROADWAY CROSSING CONDUIT100L.F.$5.00$500.00 $25.00$2,500.00 $2.08$208.00 
4150 AMP CAMPSITE POST8Each$350.00$2,800.00 $858.50$6,868.00 $380.00$3,040.00 
42CONNECT TO EXISTING ELECTRIC ( PIT LATRINES & HOST SITE)3Each$550.00$1,650.00 $2,424.00$7,272.00 $133.33$399.99 
43CT CABINET, METER SOCKET, AND CONNECTION1L.S.$2,300.00$2,300.00 $2,020.00$2,020.00 $5,353.00$5,353.00 
44SHELTER DEMO1L.S.$1,500.00$1,500.00 $3,500.00$3,500.00 $1,000.00$1,000.00 
45ROAD CROSSING AND REPAIR. C4 CONCRETE. 6" THICKNESS1L.S.$2,448.20$2,448.20 $2,000.00$2,000.00 $4,000.00$4,000.00 
46REMOVE EXISTING HYDRANTS6Each$100.00$600.00 $50.00$300.00 $50.00$300.00 
47GRANULAR SURFACING CLASS "A" 6" DEPTH (CABIN ROAD)136Tons$16.70$2,271.20 $23.20$3,155.20 $32.20$4,379.20 
48REMOVE AND RESET CAMP POSTS5Each$50.00$250.00 $100.00$500.00 $20.00$100.00 
49REMOVE AND RESET FIRE RINGS6Each$100.00$600.00 $75.00$450.00 $20.00$120.00 
50SEED, FERTILIZE, AND MULCH DISTURBED AREAS (URBAN MIX)1L.S.$4,000.00$4,000.00 $2,000.00$2,000.00 $2,500.00$2,500.00 
51REMOVE 10" PINE AT SHOWER LOCATION1Each$400.00$400.00 $500.00$500.00 $0.00$0.00 
      $152,980.15  $169,655.41  $184,355.01 
 
4
5
6
Estimated Cost:
Contractor: 
Con-Struct IncVieth Construction CorpTK Concrete Inc
Funding Source: 100% REAP OS Acquisition & Development, 1710 E Main St
6419 Nordic Dr
1608 Fifield Rd
PO Box 111
Marshalltown IA  50158Cedar Falls IA  50613Pella IA  50219
Plan Sets Requested: 4
Quantities
641-752-1865319-277-1006641-628-4590
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MACADAM STONE BASE MATERIAL(5" DEPTH)311Tons$24.00$7,464.00 $25.00$7,775.00 $20.00$6,220.00 
2ENGINEERING FABRIC1234S.Y.$1.60$1,974.40 $2.00$2,468.00 $2.00$2,468.00 
3EARTHWORK(CAMP PADS/CXT BASE-CLASS 10 EXCAVATION)345C.Y.$13.00$4,485.00 $21.00$7,245.00 $10.00$3,450.00 
4GRANULAR SURFACING, CRUSHED LIMESTONE 1/2"-3/8" WITH FINES (2" DEPTH)123Tons$20.00$2,460.00 $25.00$3,075.00 $20.00$2,460.00 
5CLASS "A" CRUSHED STONE BASE MATERIAL128Tons$20.00$2,560.00 $24.00$3,072.00 $20.00$2,560.00 
6SHOWER STUB-UPS & CONNECTION AFTER BUILDING PLACEMENT1L.S.$1,400.00$1,400.00 $4,200.00$4,200.00 $5,000.00$5,000.00 
7PCC-C4 MIX. 6" THICKNESS (SIDEWALK & PARKING)139S.Y.$39.00$5,421.00 $47.00$6,533.00 $45.00$6,255.00 
82" PVC SDR 21 WATER PIPE1476L.F.$16.00$23,616.00 $23.00$33,948.00 $10.00$14,760.00 
91" PE WATER SERVICE TUBING340L.F.$20.00$6,800.00 $19.50$6,630.00 $10.00$3,400.00 
10TRACER WIRE STATION1L.S.$200.00$200.00 $215.00$215.00 $2,000.00$2,000.00 
11#12 SOLID TRACER WIRE1L.S.$400.00$400.00 $360.00$360.00 $1,000.00$1,000.00 
12STOP AND WASTE VALVE1Each$500.00$500.00 $825.00$825.00 $1,000.00$1,000.00 
13DISINFECTION1L.S.$900.00$900.00 $300.00$300.00 $1,000.00$1,000.00 
14DETECTABLE WARNING TAPE 3" (WATER)1476L.F.$0.04$59.04 $0.50$738.00 $0.25$369.00 
152" BALL VALVE5Each$500.00$2,500.00 $475.00$2,375.00 $450.00$2,250.00 
161" CORPORATION STOP12Each$200.00$2,400.00 $250.00$3,000.00 $325.00$3,900.00 
171" CURB STOP WITH BOX14Each$250.00$3,500.00 $300.00$4,200.00 $325.00$4,550.00 
18YARD HYDRANT14Each$400.00$5,600.00 $600.00$8,400.00 $400.00$5,600.00 
192" CAP AND BLOCK1Each$250.00$250.00 $200.00$200.00 $200.00$200.00 
20DISCONNECT & CAP EXISTING WATER TO CAMPGROUND1L.S.$500.00$500.00 $500.00$500.00 $2,500.00$2,500.00 
212" TEES3Each$60.00$180.00 $200.00$600.00 $250.00$750.00 
224" DIAMETER PVC SDR 35 SEWER PIPE662L.F.$20.00$13,240.00 $29.00$19,198.00 $22.50$14,895.00 
236" DIAMETER PVC SDR 35 SEWER PIPE702L.F.$23.00$16,146.00 $31.00$21,762.00 $22.50$15,795.00 
24MANHOLE4Each$2,500.00$10,000.00 $3,145.00$12,580.00 $3,000.00$12,000.00 
25DETECTABLE WARNING TAPE 3" (SEWER)1364L.F.$0.04$54.56 $0.25$341.00 $0.25$341.00 
26RV TO SEWER HOOKUP9Each$500.00$4,500.00 $735.00$6,615.00 $250.00$2,250.00 
2780' SEPTIC INFILTRATION CHAMBERS5Each$2,000.00$10,000.00 $2,000.00$10,000.00 $1,500.00$7,500.00 
282000 GAL. CONCRETE SEPTIC TANK1Each$3,500.00$3,500.00 $7,900.00$7,900.00 $12,000.00$12,000.00 
29CONNECTION TO RV DUMP STATION1Each$540.00$540.00 $1,500.00$1,500.00 $2,500.00$2,500.00 
306" X 4" SANITARY SEWER WYES9Each$50.00$450.00 $150.00$1,350.00 $250.00$2,250.00 
31PUMP EXISTING DUMP STATION1L.S.$650.00$650.00 $1,075.00$1,075.00 $1,500.00$1,500.00 
32#2 AWG CABLE, TYPE USE656L.F.$2.30$1,508.80 $2.30$1,508.80 $3.00$1,968.00 
33#4 AWG CABLE, TYPE USE767L.F.$1.60$1,227.20 $1.50$1,150.50 $3.00$2,301.00 
34#8 AWG CABLE, TYPE USE116L.F.$1.40$162.40 $1.50$174.00 $3.00$348.00 
353/0 AWG CABLE, TYPE USE1323L.F.$6.25$8,268.75 $6.00$7,938.00 $7.50$9,922.50 
36350 MCL CABLE, TYPE USE1995L.F.$9.25$18,453.75 $9.25$18,453.75 $11.00$21,945.00 
37TRENCH- SINGLE CIRCUIT SECONDARY1100L.F.$1.60$1,760.00 $1.75$1,925.00 $5.00$5,500.00 
38800 AMP PANEL1Each$4,400.00$4,400.00 $5,000.00$5,000.00 $6,300.00$6,300.00 
39DETECTABLE WARNING TAPE 3" (ELECTRICAL)1100L.F.$0.40$440.00 $0.50$550.00 $0.25$275.00 
403" SCHEDULE 80 PVC ROADWAY CROSSING CONDUIT100L.F.$13.00$1,300.00 $14.00$1,400.00 $2.50$250.00 
4150 AMP CAMPSITE POST8Each$400.00$3,200.00 $400.00$3,200.00 $500.00$4,000.00 
42CONNECT TO EXISTING ELECTRIC ( PIT LATRINES & HOST SITE)3Each$350.00$1,050.00 $350.00$1,050.00 $160.00$480.00 
43CT CABINET, METER SOCKET, AND CONNECTION1L.S.$3,000.00$3,000.00 $2,100.00$2,100.00 $6,300.00$6,300.00 
44SHELTER DEMO1L.S.$2,500.00$2,500.00 $4,000.00$4,000.00 $25,000.00$25,000.00 
45ROAD CROSSING AND REPAIR. C4 CONCRETE. 6" THICKNESS1L.S.$3,000.00$3,000.00 $3,000.00$3,000.00 $3,000.00$3,000.00 
46REMOVE EXISTING HYDRANTS6Each$200.00$1,200.00 $440.00$2,640.00 $250.00$1,500.00 
47GRANULAR SURFACING CLASS "A" 6" DEPTH (CABIN ROAD)136Tons$20.00$2,720.00 $26.00$3,536.00 $20.00$2,720.00 
48REMOVE AND RESET CAMP POSTS5Each$100.00$500.00 $195.00$975.00 $100.00$500.00 
49REMOVE AND RESET FIRE RINGS6Each$100.00$600.00 $200.00$1,200.00 $100.00$600.00 
50SEED, FERTILIZE, AND MULCH DISTURBED AREAS (URBAN MIX)1L.S.$5,000.00$5,000.00 $3,000.00$3,000.00 $7,500.00$7,500.00 
51REMOVE 10" PINE AT SHOWER LOCATION1Each$500.00$500.00 $875.00$875.00 $1,000.00$1,000.00 
      $193,040.90  $242,656.05  $244,132.50 
 



 