IOWA DEPARTMENT OF NATURAL RESOURCES
ENGINEERING BUREAU

INFORMAL BID TAB
NOTICE: This document represents bids that were opened on the letting date and may be subject to further review. This is not the official bid tab.

 Bids For:  Location:   Wapsipinicon State Park  Date: 3/20/2014  Project No.  
  Water System Upgrade  County:   JONES  Time: 11:00 am  10-06-53-01

 

 
1
2
3
Estimated Cost: $250,070.00
Contractor: 
F L Krapfl Company IncHagerty Earthworks LLCConnolly Construction Inc
Funding Source: 100% Health and Safety Account, 1301 - 3rd St SW
Box 303
300 E 2nd St Suite 304
18409 N Cascade Rd
PO Box 68
Dyersville IA  52040Muscatine IA  52761Peosta IA  52068
Plan Sets Requested: 7
Quantities
563-875-8938563-260-3877563-876-3225
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION1L.S.$20,570.00$20,570.00 $5,000.00$5,000.00 $6,600.00$6,600.00 
23 INCH PVC CLASS 200 OR HDPE DR 11 WATER MAIN (TRENCHED OR BORED)3114L.F.$13.00$40,482.00 $22.00$68,508.00 $15.35$47,799.90 
3DETECTABLE WARNING TAPE, 3" WATER OR TRACER WIRE #12 IF BORED3888L.F.$0.14$544.32 $0.25$972.00 $0.25$972.00 
43 INCH GATE VALVE WITH VALVE BOX2Each$787.00$1,574.00 $350.00$700.00 $855.00$1,710.00 
5CLEARING & GRUBBING1L.S.$652.00$652.00 $1,000.00$1,000.00 $5,195.00$5,195.00 
6GRADING FOR THE BUILDING1L.S.$320.00$320.00 $1,500.00$1,500.00 $1,180.00$1,180.00 
710'-6" x 20’-6” PRECAST HUFFCUTT BUILDING (INSTALLED)1L.S.$29,865.00$29,865.00 $27,150.00$27,150.00 $36,100.00$36,100.00 
8ELECTRICAL SYSTEM COMPLETE FOR TREATMENT BUILDING, NEW PUMP CONTROLS, ELECTRICAL PANEL, HEATER, LIGHTS ETC., COMPLETE WORKING SYSTEM1L.S.$5,400.00$5,400.00 $9,500.00$9,500.00 $5,615.00$5,615.00 
9MECHANICAL SYSTEM COMPLETE WITH MANIFOLD, WATER METER, VALVES, PRESSURE SWITCH, GUAGE, RELIEF VALVE, WELL DRAW-DOWN EQUIPMENT, SCH. 80 PVC PIPING ETC1L.S.$9,794.00$9,794.00 $4,100.00$4,100.00 $13,100.00$13,100.00 
10CLOSED CELL SPRAY INULATION FOR THE BUILDING1L.S.$4,550.00$4,550.00 $4,500.00$4,500.00 $3,015.00$3,015.00 
11LIQUID CHLORINE INJECTION PUMP & CONTAINER1L.S.$631.00$631.00 $1,100.00$1,100.00 $3,627.00$3,627.00 
12AMTROL WELL-X-TROL WX-350D 119 GAL PREESSURE TANKS OR APPROVED EQUAL4Each$1,030.00$4,120.00 $1,125.00$4,500.00 $0.00$0.00 
13ELECTRIC SERVICE TO WELL IN CONDUIT (APROX: 260 FEET)1L.S.$1,575.00$1,575.00 $4,500.00$4,500.00 $2,540.00$2,540.00 
14STATIC WATER LEVEL LINE & GUAGE COMPLETE WITH INSTALLATION (APROX: 260 FEET)1L.S.$1,841.00$1,841.00 $1,100.00$1,100.00 $0.00$0.00 
15ELECTRICAL SERVICE TO THE BUILDING FROM TRANSFORMER (APROX: 300 FT)1L.S.$6,832.00$6,832.00 $7,000.00$7,000.00 $7,285.00$7,285.00 
16NEW WATER CONNECTIONS FROM WELL TO TREATMENT BUILDING -3 INCH PVC CLASS 200 OR HDPE DR 11 WATER MAIN (TRENCHED OR BORED)260L.F.$19.00$4,940.00 $22.00$5,720.00 $14.00$3,640.00 
17CLASS "A" CRUSHED STONE FOR THE TREATMENT BUILDING BASE13Tons$16.00$208.00 $15.00$195.00 $19.15$248.95 
1848” DEEP X 12” WIDE TRENCH FOOTING FOR THE BUILDING AS DESCRIBED IN THE SPECS. INCLUDING EXCAVATION FOR THE FOOTING1L.S.$5,426.00$5,426.00 $4,000.00$4,000.00 $7,700.00$7,700.00 
193 INCH PVC CLASS 200 OR HDPE DR 11 WATER MAIN (TRENCHED OR BORED) FROM NEW BLDG TO EXISTING WATERMAINS. 516L.F.$17.50$9,030.00 $22.00$11,352.00 $14.25$7,353.00 
20DRAIN DOWN PIT AT THE PUBLIC RESTROOM1L.S.$5,494.00$5,494.00 $1,500.00$1,500.00 $8,610.00$8,610.00 
21SYSTEM DISINFECTION1L.S.$437.00$437.00 $1,000.00$1,000.00 $3,700.00$3,700.00 
22REMOVE ALL WELL CONTROLS & PIPING FROM SCOUT LODGE AND DISPOSE1L.S.$834.00$834.00 $720.00$720.00 $2,750.00$2,750.00 
23DEMO PRESSURE TANK IN LODGE & DISPOSAL1L.S.$634.00$634.00 $720.00$720.00 $2,200.00$2,200.00 
24DEMO PRESSURE TANK IN RESIDENCE, REMOVE ELECTRICAL CONTROLS & DISPOSE1L.S.$907.00$907.00 $720.00$720.00 $4,590.00$4,590.00 
25CONNECT NEW WATER MAIN TO THE RESIDENCE1L.S.$1,507.00$1,507.00 $1,000.00$1,000.00 $700.00$700.00 
26CONNECT NEW WATER MAIN TO ROTARY LODGE1L.S.$1,507.00$1,507.00 $630.00$630.00 $700.00$700.00 
27PLUG EXISTING WELL IN MANAGER'S RESIDENCE1L.S.$2,890.00$2,890.00 $2,000.00$2,000.00 $2,295.00$2,295.00 
28PLUG EXISTING WELL AT ROTARY LODGE, REMOVE BUILDING & CONTROL INCLUDING DISPOSAL1L.S.$1,490.00$1,490.00 $2,500.00$2,500.00 $3,035.00$3,035.00 
29SITE RESTORATION (ALL)1L.S.$8,323.00$8,323.00 $6,000.00$6,000.00 $4,000.00$4,000.00 
      $172,377.32  $179,187.00  $186,260.85 
 
4
5
6
Estimated Cost: $250,070.00
Contractor: 
Ricklefs Excavating Ltd
Funding Source: 100% Health and Safety Account, 12536 Buffalo Road


Anamosa IA  52205    
Plan Sets Requested: 7
Quantities
319-462-4435
No.Description:No.UnitUnit Price AmountUnit Price AmountUnit Price Amount
1MOBILIZATION1L.S.$50,000.00$50,000.00 $0.00 $0.00 
23 INCH PVC CLASS 200 OR HDPE DR 11 WATER MAIN (TRENCHED OR BORED)3114L.F.$12.00$37,368.00 $0.00 $0.00 
3DETECTABLE WARNING TAPE, 3" WATER OR TRACER WIRE #12 IF BORED3888L.F.$0.50$1,944.00 $0.00 $0.00 
43 INCH GATE VALVE WITH VALVE BOX2Each$250.00$500.00 $0.00 $0.00 
5CLEARING & GRUBBING1L.S.$3,000.00$3,000.00 $0.00 $0.00 
6GRADING FOR THE BUILDING1L.S.$800.00$800.00 $0.00 $0.00 
710'-6" x 20’-6” PRECAST HUFFCUTT BUILDING (INSTALLED)1L.S.$30,000.00$30,000.00 $0.00 $0.00 
8ELECTRICAL SYSTEM COMPLETE FOR TREATMENT BUILDING, NEW PUMP CONTROLS, ELECTRICAL PANEL, HEATER, LIGHTS ETC., COMPLETE WORKING SYSTEM1L.S.$7,000.00$7,000.00 $0.00 $0.00 
9MECHANICAL SYSTEM COMPLETE WITH MANIFOLD, WATER METER, VALVES, PRESSURE SWITCH, GUAGE, RELIEF VALVE, WELL DRAW-DOWN EQUIPMENT, SCH. 80 PVC PIPING ETC1L.S.$12,000.00$12,000.00 $0.00 $0.00 
10CLOSED CELL SPRAY INULATION FOR THE BUILDING1L.S.$1,800.00$1,800.00 $0.00 $0.00 
11LIQUID CHLORINE INJECTION PUMP & CONTAINER1L.S.$900.00$900.00 $0.00 $0.00 
12AMTROL WELL-X-TROL WX-350D 119 GAL PREESSURE TANKS OR APPROVED EQUAL4Each$1,400.00$5,600.00 $0.00 $0.00 
13ELECTRIC SERVICE TO WELL IN CONDUIT (APROX: 260 FEET)1L.S.$3,380.00$3,380.00 $0.00 $0.00 
14STATIC WATER LEVEL LINE & GUAGE COMPLETE WITH INSTALLATION (APROX: 260 FEET)1L.S.$3,000.00$3,000.00 $0.00 $0.00 
15ELECTRICAL SERVICE TO THE BUILDING FROM TRANSFORMER (APROX: 300 FT)1L.S.$8,000.00$8,000.00 $0.00 $0.00 
16NEW WATER CONNECTIONS FROM WELL TO TREATMENT BUILDING -3 INCH PVC CLASS 200 OR HDPE DR 11 WATER MAIN (TRENCHED OR BORED)260L.F.$14.00$3,640.00 $0.00 $0.00 
17CLASS "A" CRUSHED STONE FOR THE TREATMENT BUILDING BASE13Tons$15.00$195.00 $0.00 $0.00 
1848” DEEP X 12” WIDE TRENCH FOOTING FOR THE BUILDING AS DESCRIBED IN THE SPECS. INCLUDING EXCAVATION FOR THE FOOTING1L.S.$4,000.00$4,000.00 $0.00 $0.00 
193 INCH PVC CLASS 200 OR HDPE DR 11 WATER MAIN (TRENCHED OR BORED) FROM NEW BLDG TO EXISTING WATERMAINS. 516L.F.$13.00$6,708.00 $0.00 $0.00 
20DRAIN DOWN PIT AT THE PUBLIC RESTROOM1L.S.$2,700.00$2,700.00 $0.00 $0.00 
21SYSTEM DISINFECTION1L.S.$500.00$500.00 $0.00 $0.00 
22REMOVE ALL WELL CONTROLS & PIPING FROM SCOUT LODGE AND DISPOSE1L.S.$1,100.00$1,100.00 $0.00 $0.00 
23DEMO PRESSURE TANK IN LODGE & DISPOSAL1L.S.$1,000.00$1,000.00 $0.00 $0.00 
24DEMO PRESSURE TANK IN RESIDENCE, REMOVE ELECTRICAL CONTROLS & DISPOSE1L.S.$1,000.00$1,000.00 $0.00 $0.00 
25CONNECT NEW WATER MAIN TO THE RESIDENCE1L.S.$800.00$800.00 $0.00 $0.00 
26CONNECT NEW WATER MAIN TO ROTARY LODGE1L.S.$800.00$800.00 $0.00 $0.00 
27PLUG EXISTING WELL IN MANAGER'S RESIDENCE1L.S.$600.00$600.00 $0.00 $0.00 
28PLUG EXISTING WELL AT ROTARY LODGE, REMOVE BUILDING & CONTROL INCLUDING DISPOSAL1L.S.$600.00$600.00 $0.00 $0.00 
29SITE RESTORATION (ALL)1L.S.$6,500.00$6,500.00 $0.00 $0.00 
      $195,435.00  $0.00  $0.00 
 



 