IOWA DEPARTMENT OF NATURAL RESOURCES |
|
| Bids For: | Location: | AA CAll | Date: 11/17/2011 | Project No. |
| Waterline replacement | County: | KOSSUTH | Time: 3:00 p.m. | 09-03-55-04 |
1 | 2 | 3 | |||||||||||
| Estimated Cost: $60,000.00 | Contractor: | Schumacher Well Drilling | |||||||||||
| Funding Source: 100% I-JOBS, | 2201 Slagle Dr | ||||||||||||
| Algona IA 50511 | |||||||||||||
| Plan Sets Requested: 0 | Quantities | 515-295-2337 | |||||||||||
| No. | Description: | No. | Unit | Unit Price | Amount | Unit Price | Amount | Unit Price | Amount | ||||
| 1 | 2" Diam HDPE Water Main 200 psi | 1295 | L.F. | $5.25 | $6,798.75 | $0.00 | $0.00 | ||||||
| 2 | 1" Diam HDPE Water Main 200 psi | 370 | L.F. | $2.55 | $943.50 | $0.00 | $0.00 | ||||||
| 3 | Removals, As Per Plan | 1 | L.S. | $2,100.00 | $2,100.00 | $0.00 | $0.00 | ||||||
| 4 | Secondary Wire From Transformer, # 3/0 AWG | 1500 | L.F. | $6.46 | $9,690.00 | $0.00 | $0.00 | ||||||
| 5 | Ground Wire, # 4 AWG | 500 | L.F. | $1.42 | $710.00 | $0.00 | $0.00 | ||||||
| 6 | 2x 87 Gal. Pressure Tank, Storage Building Manifold: Water | 1 | L.S. | $2,138.00 | $2,138.00 | $0.00 | $0.00 | ||||||
| 7 | Meter, Valves, Pressure Switch, Pressure Gauge, Piping, etc. | 1 | L.S. | $1,926.00 | $1,926.00 | $0.00 | $0.00 | ||||||
| 8 | Liquid Chlorination System With Solution Tank, Complete | 1 | L.S. | $2,270.00 | $2,270.00 | $0.00 | $0.00 | ||||||
| 9 | Electrical Service and Pump Controls Complete with Lightening Arrestor/Surge Protector | 1 | L.S. | $6,117.00 | $6,117.00 | $0.00 | $0.00 | ||||||
| 10 | Directional Boring | 2135 | L.F. | $13.75 | $29,356.25 | $0.00 | $0.00 | ||||||
| 11 | Tracer Wire, no 12 | 1665 | L.F. | $0.33 | $549.45 | $0.00 | $0.00 | ||||||
| 12 | Curb Stop | 2 | Each | $350.00 | $700.00 | $0.00 | $0.00 | ||||||
| 13 | Yard Hydrant | 4 | Each | $290.00 | $1,160.00 | $0.00 | $0.00 | ||||||
| 14 | Floor Drain | 1 | Each | $75.00 | $75.00 | $0.00 | $0.00 | ||||||
| 15 | Unit Heater, 4 kw 240V. Single Phase | 1 | Each | $420.00 | $420.00 | $0.00 | $0.00 | ||||||
| 16 | Drawdown Pit | 2 | Each | $3,500.00 | $7,000.00 | $0.00 | $0.00 | ||||||
| $71,953.95 | $0.00 | $0.00 | |||||||||||
10/14/2026