PROJECTS LETTING -  December , 2020

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

APPANOOSE 20-05-04-03 Rathbun Fisheries Management Unit - Above Ground Storage Tank-2020-12-03   Bid Completion detail
BUENA VISTA 19-01-11-01 Storm Lake Hatchery - Generator Install-2020-12-03   Bid Completion detail
CERRO GORDO 21-03-17-01 McIntosh Woods - Shoreline Repair-2020-12-10   Bid Completion detail
FRANKLIN 21-02-35-01 Beed's Lake State Park - Dam Pipe Grouting-2020-12-10   Bid Completion detail
HENRY 21-06-44-01 Geode State Park - Geode Booster Pump Building-2020-12-10   Bid Completion detail
LUCAS 21-05-59-01 Stephens State Forest - Lucas Unit Road Maintenance-2020-12-10   Bid Completion detail
MARION 20-05-63-01 Bennington Ramp/Ridge Bridge - Road Maintenance-2020-12-10   Bid Completion detail
SAC 21-01-81-02 Black Hawk Marsh - Game Road Maintenance-2020-12-10   Bid Completion detail
VAN BUREN 20-06-89-02 Lake Sugema WMA - Jetty and Shoreline Repairs-2020-12-10   Bid Completion detail
JONES 20-06-53-01 Wapsipinicon State Park - 2019 FEMA Flood Repairs - Phase 1-2020-12-17   Bid Completion detail
MUSCATINE 21-06-70-01 Fairport State Recreation Area - 2019 FEMA Revetment Repairs-2020-12-17   Bid Completion detail




FRANKLIN -- PROJECT # 21-02-35-01                12/10/2020                Large Project Letting
BEED'S LAKE STATE PARK
DAM PIPE GROUTING
Proposal Guarantee: $4,000
Completion Date: 4/30/2021

   This project will coffer dam a portion of Beed's Lake to draw water below the fish pond pipe, which has been found to be leaking down stream of the dam. This cast iron pipe will be televised by the contractor to see where the leak is occurring. After drawing down the coffer dam area, the contractor shall remove the existing valve in the dam control vault, bolt/weld new cap plates on both ends of the pipe, put a birds mouth on both ends and fill the pipe section with non-shrink grout.

ESTIMATED QUANTITIES:
    COFFER/PORTABLE DAM     1 L.S.
    PIPE TELEVISING     1 L.S.
    VALVE REMOVAL & PIPE GROUTING     1 L.S.
    3" ROCK     6 Tons
    3/4" ROCK     1 Tons
    DIRT AND SEEDING     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HENRY -- PROJECT # 21-06-44-01                12/10/2020                Large Project Letting
GEODE STATE PARK
GEODE BOOSTER PUMP BUILDING
Proposal Guarantee: $6,250
Completion Date: 5/14/2021

   This project consists of installing a pre-fabricated concrete building along with the booster pump and pressure tanks and other miscellaneous work associated with the project.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Cleaning & Grubbing     1 L.S.
    10'-6" X 20'-6" Pre-Cast Huffcutt Building Or Equal (Installed), Including Grading     1 L.S.
    48" Deep and 12" Wide Trench Footing For the Building As Described In The Specs.      1 L.S.
    18" Deep Class "A" Crushed Stone Under The Building     20 Tons
    Electrical Service To The Building     1 L.S.
    Complete Electrical System For The Building With Pump Wiring, Heater, Light, Fan etc.     1 L.S.
    Complete Mechanical System For The Building, Booster Pump, Manifold, Pressure Tanks, Valves, Pressure Switch, Gauges, Connections To The Existing Line     1 L.S.
    Access Path To The Building With Class "A" Crushed Rock     6 Tons
    Disinfection Of The Distribution Network Including The Plumbing In The Building     1 L.S.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LUCAS -- PROJECT # 21-05-59-01                12/10/2020                Large Project Letting
STEPHENS STATE FOREST
LUCAS UNIT ROAD MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 8/30/2021

   This project consists of granular roadway maintenance - ditch cleaning, channel excavation, culvert removal/installation, blading/shaping of roadway, spreading new rock and the installation of revetment and erosion stone.

ESTIMATED QUANTITIES:
    2102 - EMBANKMENT-IN-PLACE, CONTRACTOR FURNISH     50 C.Y.
    2125 - RESHAPING/CLEANING DITCHES     11 STA.
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING     91.7 STA.
    2312 - GRANULAR SURFACING ON ROAD, CRUSHED STONE, CLASS A     750 Tons
    2312 - GRANULAR SURFACING ON ROAD, CRUSHED STONE, 1.5-INCH     1,609 Tons
    2312 - GRANULAR SURFACING ON ROAD, CRUSHED STONE, 3-INCH MINUS     422 Tons
    2417 - CULV, CMP RDWY, 18"     140 L.F.
    2417 - CULV, CMP RDWY, 24"     100 L.F.
    2417 - CULV, CMP RDWY, 36"     120 L.F.
    2417 - CULV, BAND, CMP RDWY, 36"     4 Each
    2507 - ENGINEERING FABRIC     100 S.Y.
    2507 - REVETMENT, CLASS E     80 Tons
    2507 - EROSION STONE     20 Tons
    2518 - SAFETY CLOSURE     3 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MARION -- PROJECT # 20-05-63-01                12/10/2020                Large Project Letting
BENNINGTON RAMP/RIDGE BRIDGE
ROAD MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 8/30/2021

   This project consists of granular roadway maintenance - ditch cleaning, channel excavation, culvert removal/installation, blading/shaping of roadway, spreading new rock and the installation of revetment and erosion stone.

ESTIMATED QUANTITIES:
    2101 - CLEARING     1 L.S.
    2101 - REMOVAL OF FLOOD DEBRIS     13 STA.
    2104 - EXCAVATION, CL 13, CHANNEL     50 C.Y.
    2125 - RESHAPING/CLEANING DITCHES     15 STA.
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING     61.7 STA.
    2312 - GRANULAR SURFACING ON ROAD, 3-INCH MINUS, CRUSHED STONE     2,160 Tons
    2417 - APRON, CONC, 18"     1 Each
    2417 - APRON, CONC, 24"     2 Each
    2417 - APRON, CONC, 30"     2 Each
    2417 - APRON, CONC, 36"     1 Each
    2417 - CULV, CONC RDWY PIPE, 18"     40 L.F.
    2417 - CULV, CONC RDWY PIPE, 24"     80 L.F.
    2417 - CULV, CONC RDWY PIPE, 30"     80 L.F.
    2417 - CULV, CONC RDWY PIPE, 36"     60 L.F.
    2507 - REVETMENT, CLASS E     30 Tons
    2507 - EROSION STONE     45 Tons
    2518 - SAFETY CLOSURE     2 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.
    2101 - CLEARING     1 L.S.
    2312 - GRANULAR SURFACING ON ROAD, CRUSHED STONE - 1.5-INCH     48 Tons
    2417 - APRON, CONC, 30"     3 Each
    2417 - CULV, CONC RDWY PIPE, 30"     120 L.F.
    2507 - ENGINEERING FABRIC     312 S.Y.
    2507 - REVETMENT, CLASS E     100 Tons
    2507 - EROSION STONE     40 Tons
    2518 - SAFETY CLOSURE     1 Each

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SAC -- PROJECT # 21-01-81-02                12/10/2020                Large Project Letting
BLACK HAWK MARSH
GAME ROAD MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 8/30/2021

   This project consists of granular roadway maintenance - culvert installation, clearing/grubbing, blading/shaping and spreading new rock.

ESTIMATED QUANTITIES:
    2101 - CLEARING, EACH, 15" - 18"     2 Each
    2101 - CLEARING, EACH, 24" - 30"     7 Each
    2101 - CLEARING, EACH, 30" - 36"     4 Each
    2101 - CLEARING, EACH, 36" - 42"     1 Each
    2101 - CLEARING, EACH, 42" - 48"     1 Each
    2101 - CLEARING, EACH, 48" - 60"     4 Each
    2101 - CLEAR AND GRUBB, EACH, 9' - 12'     2 Each
    2101 - CLEAR AND GRUBB, EACH, 30" - 36"     1 Each
    2101 - CLEAR AND GRUBB, EACH, 48" - 60"     1 Each
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING     82.2 STA.
    2312 - GRANULAR SURFACING ON ROAD, CRUSHED STONE, CLASS A     2,213 Tons
    2417 - APRON, METAL, 24"     2 Each
    2417 - CULV, CMP RDWY, 24"     40 L.F.
    2507 - ENGINEERING FABRIC     89 S.Y.
    2507 - REVETMENT, CLASS E     20 Tons
    2518 - SAFETY CLOSURE     2 Each
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




VAN BUREN -- PROJECT # 20-06-89-02                12/10/2020                Large Project Letting
LAKE SUGEMA WMA
JETTY AND SHORELINE REPAIRS
Proposal Guarantee: $6,250
Completion Date: 5/14/2021

   This project consists of repairing wind and wave erosion to 10 fishing jetties and 950 feet of shoreline at 5 sites by placing revetment on the side slopes, crushed rock surfacing on the tops of the jetties, and other incidental work as required by the DNR Field Engineer.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Revetment, Class "E"     2,315 Tons
    Class "A" Crushed Stone Surfacing     160 Tons
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 20-05-04-03                12/3/2020                Small Project Letting
RATHBUN FISHERIES MANAGEMENT UNIT
ABOVE GROUND STORAGE TANK
Proposal Guarantee: $0
Completion Date: 4/30/2021

   This project consists of installation of an above ground fuel storage tank for diesel fuel. Fuel storage is for an existing backup generator. Underground supply piping will transport fuel approximately 300' to the generator. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




BUENA VISTA -- PROJECT # 19-01-11-01                12/3/2020                Small Project Letting
STORM LAKE HATCHERY
GENERATOR INSTALL
Proposal Guarantee: $0
Completion Date: 3/5/2021

   Storm Lake Fish Hatchery, part of the Black Hawk Fish Management Unit, needs a life-support back-up generator. A new 25kVA wheel mounted generator to run the current water pump will be installed with a new automatic transfer switch and associated panel upgrades.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




CERRO GORDO -- PROJECT # 21-03-17-01                12/10/2020                Small Project Letting
MCINTOSH WOODS
SHORELINE REPAIR
Proposal Guarantee: $0
Completion Date: 5/28/2021

   Project consists of placing native stone revetment, class 'C' (516 Ton) along 2 locations on north shoreline and native choke stone, 6" to 12", (1296 Ton) on 4 locations near McIntosh Woods State Park, Clear Lake, Cerro Gordo County, IA. Proposal and plans may be obtained by emailing name, address, & phone number to Melvin.pacovsky@dnr.iowa.gov

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




JONES -- PROJECT # 20-06-53-01                12/17/2020                Small Project Letting
WAPSIPINICON STATE PARK
2019 FEMA FLOOD REPAIRS - PHASE 1
Proposal Guarantee:
Completion Date: 3/26/2021

   Project includes a 300 LF repair of Wapsipinicon River bank damaged by 2019 floods. Contractor shall provide and place 640 CY of embankment fill and 756 tons of Class E revetment on 800 SY of engineering fabric to repair washout of bank.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov




MUSCATINE -- PROJECT # 21-06-70-01                12/17/2020                Small Project Letting
FAIRPORT STATE RECREATION AREA
2019 FEMA REVETMENT REPAIRS
Proposal Guarantee:
Completion Date: 3/26/2021

   Project includes placing 347 Tons of Class E Revetment and 17 Tons of Erosion Stone to repair Mississippi River bank damaged by the 2019 floods.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov