PROJECTS LETTING -  November , 2021

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

KOSSUTH 20-02-55-02 A.A. Call - Road Maintenance Rebid-2021-11-18   Bid Completion detail
POLK 21-02-77-09 Big Creek State Park - Office Roof Replacement - REBID-2021-11-18   Bid Completion detail
WINNEBAGO 22-02-95-01 Clear Lake Wildlife Unit - Harmon Lake WCS Replacement-2021-11-18   Bid Completion detail
WINNEBAGO 20-02-95-01 Hogsback Wildlife Mgt. Area - Langesen II Wetland Restoration-2021-11-18   Bid Completion detail
DICKINSON 20-01-30-08 Christopherson Slough Complex - Fish Barrier Modification-2021-12-02   Bid Completion detail
FREMONT 20-04-36-03 Riverton WMA - Pavement Preservation-2021-12-02   Bid Completion detail
JASPER 21-05-50-02 Rock Creek State Park - Roof Repairs from Derecho-2021-12-02   Bid Completion detail
BREMER 19-03-09-01 SWEET MARSH WILDLIFE MANAGEMENT AREA - BOAT CHANNEL DREDGING-2021-12-09   Bid Completion detail
BUENA VISTA 22-01-11-01 FRANK STARR PARK AT STORM LAKE - SHORELINE ARMORING-2021-12-09   Bid Completion detail
CLAYTON 20-03-22-01 Big Spring Fish Hatchery - Road Reconstruction-2021-12-09   Bid Completion detail
DICKINSON 21-01-30-09 Silver Lake - Shoreline Stabilization Sections 1 & 2-2021-12-09   Bid Completion detail
HENRY 20-06-44-02 Geode State Park - Boat Ramp Replacement and Kayak Area-2021-12-09   Bid Completion detail
SAC 20-01-81-02 Black Hawk Lake - Shore Stabilization at Gunshot Hill-2021-12-09   Bid Completion detail
SAC 21-01-81-01 Black Hawk Lake - Hydraulic Dredging-2021-12-09   Bid Completion detail
UNION 22-04-88-03 Green Valley State Park - Shoreline Armoring-2021-12-09   Bid Completion detail
WARREN 22-05-91-03 Lake Ahquabi - Fishing Pier Renovations-2021-12-09   Bid Completion detail
WARREN 21-05-91-03 Lake Ahquabi State Park - Mechanical Dredging and Shoreline Armoring-2021-12-09   Bid Completion detail
HARDIN 19-02-42-02 Pine Lake State Park - Beach Tunnel Repair-2021-12-16   Bid Completion detail




FREMONT -- PROJECT # 20-04-36-03                12/2/2021                Large Project Letting
RIVERTON WMA
PAVEMENT PRESERVATION
Proposal Guarantee: $0
Completion Date: 10/29/2022

   This project consists of HMA roadway maintenance - patching, crack cleaning and filling, fog sealing and RCP removal and reinstallation with pinned joints.

ESTIMATED QUANTITIES:
    2102 - SPECIAL BACKFILL     22 Tons
    2306 - ASPHALT EMULSION FOR FOG SEAL (PAVEMENT)     240 GAL.
    2416 - RMV+REINSTALL RIGID PIPE CULV LE 36"     36 L.F.
    2528 - TRAFFIC CONTROL     1 L.S.
    2529 - PATCHES, FULL-DEPTH FINISH, BY AREA. 6-IN., HMA     52 S.Y.
    2529 - PATCHES, FULL-DEPTH FINISH, 6-IN., BY COUNT, HMA     5 Each
    2533 - MOBILIZATION     1 L.S.
    2541 - CRACK & JOINT CLEAN & SEAL (HMA SURF)     0.52 MI.
    2541 - SEALER MATERIAL (HMA SURFACES)     2,000 LB.
    2543 - TRANSVERSE JOINT REPAIR     47 Tons

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BREMER -- PROJECT # 19-03-09-01                12/9/2021                Large Project Letting
SWEET MARSH WILDLIFE MANAGEMENT AREA
BOAT CHANNEL DREDGING
Proposal Guarantee: $25,000
Completion Date: 2/28/2023

   This project involves the repair of the existing dike system around Martens Lake and mechanically dredging portions of the lake.

ESTIMATED QUANTITIES:
    Clearing & Grubbing     1 L.S.
    Excavation, Embankment     5,946.6 C.Y.
    Excavation, Waste     60,017 C.Y.
    Stabilizing Crop - Seed + Fertilize     4.6 Acres
    Erosion Control     11,437 L.F.
    Construction Survey     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




BUENA VISTA -- PROJECT # 22-01-11-01                12/9/2021                Large Project Letting
FRANK STARR PARK AT STORM LAKE
SHORELINE ARMORING
Proposal Guarantee: $12,500
Completion Date: 5/20/2022

   This project consists of 2000' of shoreline armoring and incidental work as required by the DNR Inspector.

ESTIMATED QUANTITIES:
    Clearing     1 L.S.
    Revetment, Class E (Fieldstone)     2,500 Tons
    Excavation, Class 13, Waste (Ice Ridge Grading)     600 L.F.
    Filter Sock, 9"     150 L.F.
    Seed and Mulch     2 Acres
    NPDES General Permit #2 & SWPPP      1 L.S.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




CLAYTON -- PROJECT # 20-03-22-01                12/9/2021                Large Project Letting
BIG SPRING FISH HATCHERY
ROAD RECONSTRUCTION
Proposal Guarantee: $6,250
Completion Date: 5/31/2022

   This project consists of re-construction of road that was taken out for installing hatchery water distribution system. The project also includes repairing and patching potholes on the existing road.

ESTIMATED QUANTITIES:
    2102 -5" DEEP CLASS 13 EXCAVATION, STOCK PILE FOR REUSE     195 C.Y.
    2102-7 " DEEP CLASS 13 EXCAVATION & DISPOSE OFF SITE     272 C.Y.
    2102-PLACE STOCK PILED SPECIAL FILL AND COMPACT( Approx. 4" thick.)     300 Tons
    2102-SPECIAL BACK FILL (Approx. 2" thick)     150 Tons
    2303- 2" lift of HMA HT INTERMEDIATE, 1/2"     150 Tons
    2303 - 3" lift of HMA HT BASE, 3/4"     225 Tons
    2303 - ASPH BINDER, PG 58-34H     24 Tons
    2303 -1" lift of HMA HT SURF, 1/2", FRIC L-2     75 Tons
    2528-TRAFFIC CONTROLS     1 L.S.
    2529- PATCH, FULL-DEPTH FINISH, BY AREA     40 S.Y.
    2529- PATCH, FULL-DEPTH FINISH, BY COUNT     15 Each
    2533-MOBILIZATION     1 L.S.
    2599-HMA SAW CUT     40 L.F.
    2601-EROSION CONTROL     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 21-01-30-09                12/9/2021                Large Project Letting
SILVER LAKE
SHORELINE STABILIZATION SECTIONS 1 & 2
Proposal Guarantee: $50,000
Completion Date: 9/15/2022

   This project consists of armoring approximately 3,280 feet of shoreline with fieldstone and coir erosion mat.

ESTIMATED QUANTITIES:
    MOBILIZATION/DEMOBILIZATION      1 L.S.
    NPDES PERMITTING AND PPP     1 L.S.
    STABILIZED CONSTRUCTION ENTRANCE     2 Each
    CONSTRUCT, MAINTAIN, & RESTORE ACCESS AND STAGING AREAS     1 L.S.
    TREE & BRUSH CLEARING     4 Acres
    TREE REMOVAL (12-24" DBH)     64 Each
    TREE REMOVAL (>24" DBH)     6 Each
    TREE REMOVAL (DEAD, UNDERCUT OAKS)     46 Each
    FLOATATION SILT CURTAIN     2,600 L.F.
    SILT FENCE     1,000 L.F.
    SEDIMENT CONTROL LOG     1,000 L.F.
    CLASS E RIPRAP, ANGULAR     830 Tons
    CLASS D RIPRAP, ANGULAR     525 Tons
    NATIVE FIELDSTONE, CLASS D RIPRAP     1,660 Tons
    BEDDING FILTER MATERIAL     205 Tons
    GEOTEXTILE FILTER FABRIC - NON-WOVEN     2,300 S.Y.
    COMMON EXCAVATION (EV) (P) (ON-SITE, DESIGNATED BORROW AREA)     1,350 C.Y.
    24" CMP PIPE CULVERT     90 L.F.
    24" FLARED END SECTION     6 Each
    ROLLED EROSION CONTROL PRODUCT RECP TYPE 2B     2,890 S.Y.
    COIR EORSION MAT     2,890 S.Y.
    NATIVE SEED MIX - NATIVE GRASS & FORBS     6 Acres
    EROSION CONTROL MULCH     4 Acres
    WOOD CELLULOSE     0.1 Acres
    BONDED FIBER MATRIX     0.3 Acres
    NPDES PERMITTING AND PPP     1 L.S.
    STABILIZED CONSTRUCTION ENTRANCE     2 Each
    CONSTRUCT, MAINTAIN, & RESTORE ACCESS AND STAGING AREAS     1 L.S.
    TREE & BRUSH CLEARING     6 Acres
    TREE REMOVAL (12"-24" DBH)     92 Each
    TREE REMOVAL (>24" DBH)     10 Each
    TREE REMOVAL (DEAD, UNDERCUT OAKS)     34 Each
    FLOTATION SILT CURTAIN     1,320 L.F.
    SILT FENCE     1,000 L.F.
    SEDIMENT CONTROL LOG     1,000 L.F.
    CLASS E RIPRAP, ANGULAR     695 Tons
    CLASS D RIPRAP, ANGULAR     20 Tons
    NATIVE FIELDSTONE, CLASS D RIPRAP     820 Tons
    BEDDING FILTER MATERIAL     160 Tons
    GEOTEXTILE FILTER FABRIC - NON-WOVEN     1,200 S.Y.
    COMMON EXCAVATION (EV) (P) (ON-SITE, DESIGNATED AREA DISPOSAL)     1,305 C.Y.
    ROLLED EROSION CONTROL PRODUCT RECP TYPE 2B     2,050 S.Y.
    COIR EORSION MAT     2,050 S.Y.
    NATIVE SEED MIX - NATIVE GRASS & FORBS     7 Acres
    EROSION CONTROL MULCH     4 Acres
    WOOD CELLULOSE     0.1 Acres
    BONDED FIBER MATRIX     0.3 Acres

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HENRY -- PROJECT # 20-06-44-02                12/9/2021                Large Project Letting
GEODE STATE PARK
BOAT RAMP REPLACEMENT AND KAYAK AREA
Proposal Guarantee: $6,250
Completion Date: 6/15/2022

   This project consists of removing the existing boat ramp northeast of the beach area, pavement removal, construction of a new boat ramp, PCC paving of maneuver area, furnish and install ADA kayak launch in the northeast area of the lake, remove and replace a portion of paved roadway, and PCC paving of ADA compliant parking area and walkway.

ESTIMATED QUANTITIES:
    Site Preparation     1 L.S.
    PCC, Class "C", 6" Depth, Boat Ramp     219.2 S.Y.
    PCC, Class "C", 6" Depth, Paving     277.8 S.Y.
    Class "A" Crushed Stone Base, 6" Depth     200 Tons
    Revetment, Class "E"     62 Tons
    Pavement Removal     506 S.Y.
    Site Restoration     1 L.S.
    Pavement Removal, Kayak Area     53.3 S.Y.
    PCC, Class "C", 6" Depth, Kayak Area     132 S.Y.
    Class "A" Crushed Stone Base, Kayak Area, 6" Depth     44 Tons
    Class "A" Crushed Stone Surfacing, Kayak Area, 4" Depth     8 Tons
    Kayak Launch with Gangway, Complete     1 L.S.
    Site Restoration, Kayak Area     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SAC -- PROJECT # 20-01-81-02                12/9/2021                Large Project Letting
BLACK HAWK LAKE
SHORE STABILIZATION AT GUNSHOT HILL
Proposal Guarantee: $12,500
Completion Date: 5/20/2022

   THIS PROJECT CONSISTS OF SHORE ARMORING AND SELECTIVE TREE CLEARING AT GUNSHOT HILL, BLACK HAWK LAKE, SAC COUNTY IOWA

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Revetment Class "E" Riprap Section 1     594 Tons
    Revetment Class "E" Riprap Section 2     125 Tons
    Revetment Class "E" Riprap Section 3     330 Tons
    Imported Fill     100 C.Y.
    Selective Tree and Shrub Clearing     1 Acres
    Seed and Mulch (Bank Area)     1 Acres
    Seed and Mulch (Lawn Area)     0.25 Acres
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SAC -- PROJECT # 21-01-81-01                12/9/2021                Large Project Letting
BLACK HAWK LAKE
HYDRAULIC DREDGING
Proposal Guarantee: $375,000
Completion Date: 12/31/2023

   This project consists of hydraulically dredging approximately 750,000 CY of deposited sediment from Black Hawk Lake.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Excavation, Hydraulic Dredging     750,000 C.Y.
    Driveway Crossings     10 Each
    Stream Crossing     1 L.S.
    Boring Under Roadway     2 Each
    Class A Crushed Stone     120 Tons
    Fish Barrier, Remove and Reinstall     1 L.S.
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




UNION -- PROJECT # 22-04-88-03                12/9/2021                Large Project Letting
GREEN VALLEY STATE PARK
SHORELINE ARMORING
Proposal Guarantee: $12,500
Completion Date: 5/20/2022

   This project consists of 1787' of shoreline armoring, 1027' jetty armoring, 165' boatramp armoring and incidental work as required by the DNR Inspector.

ESTIMATED QUANTITIES:
    Seed, Fertilizer and Mulch     1 L.S.
    Revetment, Class E     3,516 Tons
    Class "A" Crushed Stone     70 Tons
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WARREN -- PROJECT # 22-05-91-03                12/9/2021                Large Project Letting
LAKE AHQUABI
FISHING PIER RENOVATIONS
Proposal Guarantee: $12,500
Completion Date: 7/29/2022

   *****Project Cancelled, Rebid in January***** The existing fishing pier at Lake Ahquabi was built in the early 1990s. The pier needs a renovation as the decking boards, shelter, and handrails are in poor condition and need to be replaced. This project will remove the enclosed shelter, add structural steel to the superstructure and a new, open air, steel shelter will be installed. New treated wood floor joists, composite decking, treated wood handrails, fish cleaning stations, and electrical will be installed. The adjacent boardwalk, concrete building slab, and asphalt trail will be removed and replaced with a new accessible seawall sidewalk to the pier.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Demolition     1 L.S.
    5" PCC Seawall Sidewalk, Subbase, and Curbing     78 S.Y.
    Pier Structural Wood, Handrails, and Composite Decking     1 L.S.
    Pier Shelter and Structural Steel     1 L.S.
    Electrical and Lighting     1 L.S.
    Fish Cleaning Tables     2 Each
    Site Restoration     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WARREN -- PROJECT # 21-05-91-03                12/9/2021                Large Project Letting
LAKE AHQUABI STATE PARK
MECHANICAL DREDGING AND SHORELINE ARMORING
Proposal Guarantee: $100,000
Completion Date: 5/1/2023

   This project consists of mechanically removing 177,854 CY of material from the lake bed, placing rock armoring on 5,103 feet of shoreline, and placing fish habitat structures in the lake bottom. Dredge spoil shall be placed in the designated upland spoil site.

ESTIMATED QUANTITIES:
    3/8 Minus Crushed Stone     15 Tons
    6" Dual Wall HDPE Pipe     60 L.F.
    Calcium Chloride Applied     3.9 Tons
    Clearing and Grubbing     28 Acres
    Engineering Fabric (Habitat)     2,593 S.Y.
    Excavation, Class 10 (Dredging)     177,854 C.Y.
    Gate, Cable     1 Each
    Haul Road     1 L.S.
    Modified Subbase     180 Tons
    Native Grass Seeding     28 Acres
    NPDES and SWPPP     1 L.S.
    RCP Sections (Supplied by DNR)     60 Each
    Rebar Removal     1 L.S.
    Revetment, Class E (Shoreline)     2,575 Tons
    Sediment Log, 12 in.     7,576 L.F.
    Shot Rock (Habitat)     3,235 Tons
    Site Restoration     1 L.S.
    Traffic Control     1 L.S.
    Water for Surface Application of Calcium Chloride     1.3 MGAL
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




KOSSUTH -- PROJECT # 20-02-55-02                11/18/2021                Small Project Letting
A.A. CALL
ROAD MAINTENANCE REBID
Proposal Guarantee: $0
Completion Date: 5/20/2022

   This project consists of HMA and granular roadway maintenance - bituminous fog sealing, patching, crack and joint cleaning and sealing, blading/shaping, spreading new rock and painted symbols. AA Call State Park, Kossuth County, IA.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




POLK -- PROJECT # 21-02-77-09                11/18/2021                Small Project Letting
BIG CREEK STATE PARK
OFFICE ROOF REPLACEMENT - REBID
Proposal Guarantee: $0
Completion Date: 4/29/2022

   The Big Creek State Park Shop and Office was roofed with asphalt shingles a couple decades ago and in need of a new roof. This project will remove the existing roof down to the deck and replace it with a new standing seam steel roof.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




WINNEBAGO -- PROJECT # 22-02-95-01                11/18/2021                Small Project Letting
CLEAR LAKE WILDLIFE UNIT
HARMON LAKE WCS REPLACEMENT
Proposal Guarantee: $0
Completion Date: 5/27/2022

   This project includes the replacement of a washed out and corroded water control structure with a new concrete box water control structure with aluminum stop logs and other incidental work as required by the DNR Construction Inspector at the Harmon Lake WMA in Winnebago County, Iowa.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




WINNEBAGO -- PROJECT # 20-02-95-01                11/18/2021                Small Project Letting
HOGSBACK WILDLIFE MGT. AREA
LANGESEN II WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 5/27/2022

   This project includes restoration of shallow wetland, approximately 1,400 Linear Feet of tile search, tile break and installing 910 Linear Feet of new tile and other incidental work as required by the DNR Construction Inspector in Winnebago County, Iowa.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




DICKINSON -- PROJECT # 20-01-30-08                12/2/2021                Small Project Letting
CHRISTOPHERSON SLOUGH COMPLEX
FISH BARRIER MODIFICATION
Proposal Guarantee: $0
Completion Date: 4/29/2022

   This project is designed to install 3 parallel runs of 24 inch Corrugated Metal Pipe (CMP) to serve as water level management at an existing rock fish barrier located in Christopherson Slough, Dickinson County, IA. Work under this project includes channel excavation (pipe inlet & outlet), installation of 24" CMP pipe, installation of a CMP riser structure, and erosion stone placement.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




JASPER -- PROJECT # 21-05-50-02                12/2/2021                Small Project Letting
ROCK CREEK STATE PARK
ROOF REPAIRS FROM DERECHO
Proposal Guarantee: $0
Completion Date: 4/30/2022

   This project consists of steel roofing and shingled roof replacements on multiple buildings at Rock Creek State Park. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




HARDIN -- PROJECT # 19-02-42-02                12/16/2021                Small Project Letting
PINE LAKE STATE PARK
BEACH TUNNEL REPAIR
Proposal Guarantee: $0
Completion Date: 5/25/2022

   Pine Lake State Park has a popular beach area that is connected to its parking lot via a trail and tunnel under a county highway. This concrete box culvert is in good condition and will remain in place. However, the retaining walls and stone archway on both sides of the tunnel are in poor condition. This project will remove these retaining walls and archway and replace them with concrete retaining walls with stone veneer applied to the face of the concrete. The adjacent concrete walk and steps shall also be replaced to match the existing elevations.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov