PROJECTS LETTING -  November , 2020

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DAVIS 21-05-26-02 Lake Wapello State Park - Water System Valves Replacement-2020-11-05   Bid Completion detail
DAVIS 21-05-26-02 Lake Wapello State Park - Water System Valves Replacement (contract)-2020-11-05   Bid Completion detail
HUMBOLDT 20-02-46-02 Prairie Lakes Wildlife Unit - Willows Access Flood Repairs-2020-11-05   Bid Completion detail
TAMA 20-05-86-02 Iowa River Wildlife Unit - Union Grove WMA - Ross Sharp Lake - Outlet Structure Modifications-2020-11-05   Bid Completion detail
DICKINSON 20-01-30-14 East Okoboji Lake - Okoboji Island Restoration-2020-11-12   Bid Completion detail
DICKINSON 21-01-30-05 Spirit Lake Fish Hatchery - Pond Filtration-2020-11-12   Bid Completion detail
POTTAWATTAMIE 20-04-78-05 Lake Manawa State Park - Day-Use Security Gates REBID-2020-11-12   Bid Completion detail
SAC 21-01-81-03 Kiowa Marsh Complex - Kiowa Marsh Channel Maintenance-2020-11-12   Bid Completion detail
VAN BUREN 20-06-89-01 Lacey-Keosauqua State Park - Pavement Preservation-2020-11-12   Bid Completion detail




DICKINSON -- PROJECT # 20-01-30-14                11/12/2020                Large Project Letting
EAST OKOBOJI LAKE
OKOBOJI ISLAND RESTORATION
Proposal Guarantee: $12,500
Completion Date: 10/29/2021

   This project consists of restoring Okoboji Island to near original size and height, armoring the perimeter of the island with 593 tons of fieldstone revetment, excavation of 300 cubic yards to reclaim island fill, provide and place 350 cubic yards of topsoil, and incidental work as directed by DNR inspector.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    CLEARING & GRUBBING     1 L.S.
    EXCAVATION     300 C.Y.
    TOPSOIL FILL     350 C.Y.
    FIELDSTONE REVETMENT, CLASS 'E'     593 Tons
    ENGINEERING FABRIC     345 S.Y.
    SEEDING & MULCHING     1 L.S.
    STAGING AREA PREPARATION & RESTORATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 21-01-30-05                11/12/2020                Large Project Letting
SPIRIT LAKE FISH HATCHERY
POND FILTRATION
Proposal Guarantee: $6,250
Completion Date: 2/28/2022

   

ESTIMATED QUANTITIES:
    Demolition     1 L.S.
    Earth Jetty     265 C.Y.
    Concrete Structure and Accessories     1 L.S.
    Traveling Water Screen Filter     1 L.S.
    Electrical     1 L.S.
    Seeding & Restoration     1 L.S.
    Fencing and Gate     1 L.S.
    Clearing & Grubbing     1 L.S.
    Dewatering/Coffer Dam     1 L.S.
    12" CMP (16 GA Aluminized Type 2)     25 L.F.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POTTAWATTAMIE -- PROJECT # 20-04-78-05                11/12/2020                Large Project Letting
LAKE MANAWA STATE PARK
DAY-USE SECURITY GATES REBID
Proposal Guarantee: $12,500
Completion Date: 4/30/2021

   This Project will install six (6) new security gates at three locations within Lake Manawa State Park. These gates will keep people out of the Park while closed and allow free access to the Park during operational hours.

ESTIMATED QUANTITIES:
    SECURITY GATES     1 L.S.
    BOLLARDS     12 Each
    CONCRETE MOUNTING PADS & SIGNS     6 Each
    ELECTRICAL     1 L.S.
    SEEDING AND RESTORATION     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




VAN BUREN -- PROJECT # 20-06-89-01                11/12/2020                Large Project Letting
LACEY-KEOSAUQUA STATE PARK
PAVEMENT PRESERVATION
Proposal Guarantee: $37,500
Completion Date: 10/15/2021

   This project consists of pavement maintenance for 5.9 miles of HMA roadway, including fog sealing, cleaning and filling cracks, milling and joint repair, 1.2 miles of HMA roadway overlay, and incidental work as directed by DNR inspector.

ESTIMATED QUANTITIES:
    2104 - CHANNEL EXCAVATION     50 C.Y.
    2212 - CLEANING AND PREPARATION OF BASE     1.2 MI.
    2212 - PATCHES, FULL DEPTH REPAIR     334 S.Y.
    2212 - PATCHES BY COUNT (REPAIR)     5 Each
    2214 - PAVEMENT SCARIFICATION     13,069 S.Y.
    2214 - BLADING AND SHAPING OF SHOULDERS     62.6 STA.
    2303 - HOT MIX ASPHALT MIXTURE INTERLAYER BASE COURSE, 3/8 IN. MIX     743 Tons
    2303 - HOT MIX ASPHALT HIGH TRAFFIC, INTERMEDIATE COURSE, 1/2 IN. MIX.      1,113.9 Tons
    2303 - HOT MIX ASPHALT HIGH TRAFFIC, SURFACE COURSE, 1/2 IN. MIX     1,113.9 Tons
    2303 - ASPHALT BINDER, PG 58-28H, HIGH TRAFFIC     117.2 Tons
    2303 - ASPH BINDER, PG 64-34E+     37.1 Tons
    2306 - BITUMINOUS FOG SEAL (HMA PAVEMENT)     2,676 GAL.
    2527 - PAINTED PAVEMENT MARKINGS, HIGH-BUILD WATERBORNE     278.2 STA.
    2528 - TRAFFIC CONTROL     1 L.S.
    2529 - PATCHES, FULL-DEPTH FINISH, 5-IN., BY AREA, HMA     271 S.Y.
    2529 - PATCHES, FULL-DEPTH FINISH, 5-IN., BY COUNT, HMA     3 Each
    2533 - MOBILIZATION     1 L.S.
    2540 - LONGITUDINAL JOINT REPAIR     200 L.F.
    2543 - TRANSVERSE JOINT REPAIR     215 Tons
    2541 - CLEANING AND FILLING CRACKS (HMA SURFACES)     4.7 MI.
    2541 - SEALER MATERIAL (HMA SURFACES)     3,525 LB.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DAVIS -- PROJECT # 21-05-26-02                11/5/2020                Small Project Letting
LAKE WAPELLO STATE PARK
WATER SYSTEM VALVES REPLACEMENT
Proposal Guarantee: $0
Completion Date: 4/9/2021

   This project consists of replacing valves on the existing water supply system. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




HUMBOLDT -- PROJECT # 20-02-46-02                11/5/2020                Small Project Letting
PRAIRIE LAKES WILDLIFE UNIT
WILLOWS ACCESS FLOOD REPAIRS
Proposal Guarantee: $0
Completion Date: 1/30/2021

   The work entails flood repairs and road resurfacing at the Willows Wildlife Access and the Bradgate WMA near Bradgate, Iowa in Humboldt County and as directed by the DNR Engineer.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




TAMA -- PROJECT # 20-05-86-02                11/5/2020                Small Project Letting
IOWA RIVER WILDLIFE UNIT - UNION GROVE WMA
ROSS SHARP LAKE - OUTLET STRUCTURE MODIFICATIONS
Proposal Guarantee: $0
Completion Date: 6/30/2021

   This project consists of adding stoplogs to the inside of the existing outlet structure so that water level can be manipulated seasonally for vegetation management and to benefit migrating waterfowl. A walk grating will be added to the cover of the structure to allow DNR staff access to remove the stoplogs when needed. Cost estimate is $29,000. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




SAC -- PROJECT # 21-01-81-03                11/12/2020                Small Project Letting
KIOWA MARSH COMPLEX
KIOWA MARSH CHANNEL MAINTENANCE
Proposal Guarantee: $0
Completion Date: 3/5/2021

   This project is designed to recreate a wetland dewatering channel within Kiowa Marsh (Sac County). The channel shall be 5' wide with 3:1 side slopes and run 1,400 feet from the water control structure toward the main pool of the marsh. Spoil material will be hauled from the marsh and placed on designated upland areas.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov