PROJECTS LETTING -  October , 2018

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

WRIGHT 18-02-99-01 Elm Lake WMA - Wetland Restoration-2018-10-11   Bid Completion detail
HENRY 18-06-44-02 Lake Geode - Valve Replacement Plan-2018-10-18   Bid Completion detail
POLK 18-02-77-01 Big Creek State Park - Jetty Repairs-2018-10-18   Bid Completion detail
DICKINSON 18-01-30-06 Gull Point State Park - Entry Portal Repair (D1FY19-10)-2018-10-25   Bid Completion detail




HENRY -- PROJECT # 18-06-44-02                10/18/2018                Large Project Letting
LAKE GEODE
VALVE REPLACEMENT PLAN
Proposal Guarantee: $12,500
Completion Date: 3/15/2019

   This project consists of removing existing valve hardware, repairing the concrete draw down tower, and installing a new gate valve.

ESTIMATED QUANTITIES:
    Efflorescence Removal     64 S.F.
    Concrete Repair     400 S.F.
    Remaining Work     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




POLK -- PROJECT # 18-02-77-01                10/18/2018                Large Project Letting
BIG CREEK STATE PARK
JETTY REPAIRS
Proposal Guarantee: $12,500
Completion Date: 5/1/2019

   The project involves restoration of Jetties by armoring with Class E revetment on a 2:1 side slope at Big Creek state Park. The contractor shall reshape the jetties and restore them to original height and width as shown in the plans.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    CLASS 'E' REVETMENT     2,337 Tons
    MACADAM STONE     149 Tons
    CLASS 'A' CRUSHED STONE     161 Tons
    DOCK ABUTMENTS     3 Each
    SEEDING & SITE RESTORATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




WRIGHT -- PROJECT # 18-02-99-01                10/11/2018                Small Project Letting
ELM LAKE WMA
WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 12/31/2018

   This project consists of installing tiling, installing a water control structure, and tile breaks.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov




DICKINSON -- PROJECT # 18-01-30-06                10/25/2018                Small Project Letting
GULL POINT STATE PARK
ENTRY PORTAL REPAIR (D1FY19-10)
Proposal Guarantee: $0
Completion Date: 5/31/2019

   The Contractor shall remove all existing wood timbers of the Gull Point State Park Entry Portal Gates. The strapping associated with the timbers shall be salvaged and used in the new gates. New 12" diameter timbers will be install in the same configuration as the originals and the salvaged hardware reinstalled. The contractor will stain the timbers and finish the gates then clean the stone monument.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov