PROJECTS LETTING -  September , 2018

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DICKINSON 18-01-30-01 Spirit Lake Fish Hatchery - Boat Storage Building-2018-09-20   Bid Completion detail
DICKINSON 19-01-30-02 Spirit Lake Fish Hatchery - Discharge Line Replacement-2018-09-20   Bid Completion detail
SAC 18-01-81-01 Grant Park - Enhancement Project-2018-09-20   Bid Completion detail




DICKINSON -- PROJECT # 18-01-30-01                9/20/2018                Large Project Letting
SPIRIT LAKE FISH HATCHERY
BOAT STORAGE BUILDING
Proposal Guarantee: $37,500
Completion Date: 8/30/2019

   Spirit Lake Fish Hatchery is located on the isthmus between Big Spirit Lake and East Okoboji Lake. The hatchery grounds will receive a new shop and storage building with the following roof functions: eight (8) non-conditioned storage bays, two (2) heated shop bays, one restroom, a mechanical room, and a storage room. The storage building will be 40' x 142' with eight (8) garage bays with an insulated shop measuring 40' x 62'. The shop area will be constructed from structural insulated panels and will have in-floor heat. The storage area will be constructed with post-frame structure.

ESTIMATED QUANTITIES:
    TREE CLEARING AND GRUBBING     1 L.S.
    GRADING     1 L.S.
    8" FILTER SOCK     150 L.F.
    SEEDING, FERTILIZING, AND MULCHING     1 L.S.
    CONNECTION TO EXISTING MANHOLE     1 L.S.
    4" SANITARY SEWER SERVICE (PVC SDR 35)     109 L.F.
    6" SANITARY SEWER SERVICE (PVC SDR 35)     125 L.F.
    SANITARY SEWER SERVICE CLEANOUTS     1 Each
    2" HDPE WATER SERVICE     160 L.F.
    2X2X2 PVC TEE     1 Each
    2" CURB STOP     1 Each
    3/4" TYPE "K" COPPER WATER LINE     95 L.F.
    FLUSHING & DISINFECTION OF WATER LINES     1 L.S.
    1" NATURAL GAS SERVICE LINE     155 L.F.
    CLASS "A" CRUSHED STONE     317 Tons
    CONSTRUCTION STAKING     1 L.S.
    STORAGE/SHOP BUILDING AND ALL ASSOCIATED ITEMS     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




SAC -- PROJECT # 18-01-81-01                9/20/2018                Large Project Letting
GRANT PARK
ENHANCEMENT PROJECT
Proposal Guarantee: $4,000
Completion Date: 5/30/2019

   This project consists of installing streambank stabilization and a Portland Cement Concrete Boat Ramp on the Raccoon River, located in Sac County, Iowa and includes grading, placing riprap along river banks, installing toe wood for streambank stabilization, installing rock vanes and J-Hooks, and installing reinforced Portland Cement Concrete Boat Ramp on the Raccoon River.

ESTIMATED QUANTITIES:
    TOE WOOD BANK STABILIZATION     3,000 Units
    BANK SHAPING FOR TOE WOOD CONSTRUCTION     1,900 C.Y.
    3x3x3 CUT WEIR STONE, 2.5 SPECIFIC GRAVITY     170 Each
    CLASS ‘B’ RIPRAP     700 Tons
    6-INCH REINFORCED PCC PAVEMENT     33.4 S.Y.
    REINFORCED PCC BOAT RAMP PUSH-IN SLAB     40 S.Y.
    CLASS ‘A’ CRUSHED STONE     50 Tons
    CLASS ‘D’ RIPRAP     100 Tons
    700 GRAM COYER EROSION FABRIC     11,000 S.F.
    MACADAM STONE     11.7 Tons
    SURFACE RESTORATION     1 L.S.
    NPDES GENERAL PERMIT #2     1 L.S.
    MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 19-01-30-02                9/20/2018                Small Project Letting
SPIRIT LAKE FISH HATCHERY
DISCHARGE LINE REPLACEMENT
Proposal Guarantee: $0
Completion Date: 6/28/2019

   This project is designed to replace failing 8" and 12" discharge pipes exiting the Spirit Lake Hatchery Facility in Orleans, IA. Work under this project includes replacement of 8" and 12" VCP with 8" and 12" PVC, installation of two 12" gate valves, removal of HMA/PCC paving, installation of new PCC paving patches, earthfill (exiting pond dike repair), 18" culvert replacement, and revetment installation.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov