PROJECTS LETTING -  August , 2016

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

ALLAMAKEE 15-03-03-9 Yellow River State Forest - Paint Creek Bank Stabilization-2016-08-04   Bid Completion detail
UNION 20-04-88-01 Grand River Wildlife Unit - Outlet Pipe repair / 12 mile-2016-08-04   Bid Completion detail
WINNESHIEK 17-03-96-02 Decorah Fish Hatchery - Replace Office & House Roofs Rebid-2016-08-04   Bid Completion detail
TAMA 14-05-86-06 Union Grove - Trail Armoring-2016-08-11   Bid Completion detail
DICKINSON 15-01-30-05 Center Lake - Fish Barrier System & Shoreline Restoration-2016-08-18   Bid Completion detail
MONROE 15-05-68-01 Lake Miami - Sediment Ponds-2016-08-18   Bid Completion detail
DELAWARE 17-03-28-01 Backbone State Park - Removal of Bridge Embutments & Bridge-2016-08-25   Bid Completion detail
WRIGHT 15-02-99-01 Clear Lake Wildlife Unit - Morse Lake Boat Ramp-2016-08-25   Bid Completion detail




DICKINSON -- PROJECT # 15-01-30-05                8/18/2016                Large Project Letting
CENTER LAKE
FISH BARRIER SYSTEM & SHORELINE RESTORATION
Proposal Guarantee: $20,000
Completion Date: 11/15/2017

   The Center Lake Fish Barrier System & Shoreline Restoration project is designed to install critical infrastructure on an existing wetland to improve water quality and prevent rough fish migration into the lake. 1,135 lineal feet of eroded shoreline will also be armored and restored as part of this project. General work under this contract will include installation of large fieldstone rock for the fish barrier and the shoreline revetment, excavation to expand an existing wetland area, earthfill to repair/create wetland dikes, and installation of a box culvert and CMP water control structures.

ESTIMATED QUANTITIES:
    Mobilization/Demobilization     1 L.S.
    NPDES Permitting and PPP     1 L.S.
    Riprap Toe - West Shoreline     650 Tons
    Riprap Bedding     150 Tons
    Field Stone     583 Tons
    Shoreline Field Stone     880 Tons
    Granular Subbase     70 Tons
    Geogrid     390 S.Y.
    Filter Fabric     2,130 S.Y.
    Turf Reinforcement Mat     1,040 S.Y.
    High Performance Turf Reinforcement Mat     340 S.Y.
    Wetland Dike Earth Fill     2,730 C.Y.
    Shoreline Earth Fill     1,010 C.Y.
    Topsoil For Shoreline     80 C.Y.
    Excavation     7,480 C.Y.
    Shoreline Over Excavation     390 C.Y.
    Road Gravel     31 Tons
    Box Culvert     1 L.S.
    Wetland 1 Outlet Structure     1 L.S.
    Access Path Culvert     48 L.F.
    Fish Exclusion Animal Guard     1 Each
    Clearing and Grubbing     1.7 Acres
    Large Tree (12"+) Removal     30 Each
    Floating Sediment Curtain     1 L.S.
    Silt Fence     550 L.F.
    Wood Fiber Log     210 L.F.
    Straw Wattle     2,060 L.F.
    Tree Protection     10 Each
    Native Grass Seeding     0.7 Acres
    Seeding Disturbed Areas     3.1 Acres
    Temporary Rolled Erosion Control Product     2,970 S.Y.
    Vegetation Establishment Period     1 L.S.
    Shoreline Access     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MONROE -- PROJECT # 15-05-68-01                8/18/2016                Large Project Letting
LAKE MIAMI
SEDIMENT PONDS
Proposal Guarantee: $10,000
Completion Date: 5/15/2017

   This project consists of constructing various sediment control structures

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    6" DIA SMP     469 L.F.
    12" DIA SMP     142 L.F.
    TRASH RACK, 6"     2 Each
    TRASH RACK, 12"     1 Each
    5' X 5' X 1/4" ANTI SEEP COLLAR     21 Each
    EARTHFILL, EMBANKMENT     59,711 C.Y.
    EARTHFILL, CORE TRENCH     2,854 C.Y.
    SEED & MULCH     3.5 Acres
    CLEARING & GRUBBING     4 Acres
    6" STRIPPING     8,737 C.Y.
Alternate
    6" DIA SMP     177 L.F.
Alternate
    TRASH RACK, 6"     1 Each
Alternate
    5' X 5' X 1/4" ANTI SEEP COLLAR     5 Each
Alternate
    EARTHWORK, EMBANKMENT     34,071 C.Y.
Alternate
    EARTHFILL, CORE TRENCH     1,346 C.Y.
Alternate
    SEED & MULCH     1.5 Acres
Alternate
    CLEARING & GRUBBING     7 Acres
Alternate
    6" STRIPPING     3,630 C.Y.
Alternate
    RIPRAP     3,266 Tons
Alternate
    ENGINEERING FABRIC     546 S.Y.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




ALLAMAKEE -- PROJECT # 15-03-03-9                8/4/2016                Small Project Letting
YELLOW RIVER STATE FOREST
PAINT CREEK BANK STABILIZATION
Proposal Guarantee: $0
Completion Date: 11/23/2016

   Project consists of constructing bendway weirs with large angular limestone (684T), furnishing and placing riprap(470T), removal & disposal of trees, reshaping 600 LF of stream bank, and stabilizing crop seeding along Paint Creek in Yellow River State Forest near Harpers Ferry, Iowa. Proposal & plan may be obtained by emailing name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




UNION -- PROJECT # 20-04-88-01                8/4/2016                Small Project Letting
GRAND RIVER WILDLIFE UNIT
OUTLET PIPE REPAIR / 12 MILE
Proposal Guarantee: $0
Completion Date: 9/23/2016

   Repair existing wetland outlet pipes. Seeding of all disturbed areas required. Proposal & plan may be obtained by emailing name, address, and phone number.

Contact:
Mark Johnson
515-250-3713
mark.johnson@dnr.iowa.gov




WINNESHIEK -- PROJECT # 17-03-96-02                8/4/2016                Small Project Letting
DECORAH FISH HATCHERY
REPLACE OFFICE & HOUSE ROOFS REBID
Proposal Guarantee: $0
Completion Date: 11/30/2016

   Project consists of replacing office and house roofs & gutters at Decorah Fish Hatchery, Decorah, Iowa. Proposal & plan may be obtained by emailing name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




TAMA -- PROJECT # 14-05-86-06                8/11/2016                Small Project Letting
UNION GROVE
TRAIL ARMORING
Proposal Guarantee: $0
Completion Date: 11/30/2016

   This project consists of lake shoreline earthwork, placement of engineering fabric, and placement of riprap. Send an email to request plans.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




DELAWARE -- PROJECT # 17-03-28-01                8/25/2016                Small Project Letting
BACKBONE STATE PARK
REMOVAL OF BRIDGE EMBUTMENTS & BRIDGE
Proposal Guarantee: $0
Completion Date: 9/30/2016

   Project consists of removal and disposal of bridge and abutments, and reshaping river banks at Backbone State Park near Dundee, Delaware Co., Iowa. Proposal & plan may be obtained by emailing name, address, and phone number.

Contact:
Mel Pacovsky
319-240-3553
melvin.pacovsky@dnr.iowa.gov




WRIGHT -- PROJECT # 15-02-99-01                8/25/2016                Small Project Letting
CLEAR LAKE WILDLIFE UNIT
MORSE LAKE BOAT RAMP
Proposal Guarantee: $0
Completion Date: 10/3/2016

   This project is for the removal and repacement of a 15 foot wide by 20 foot long section of concrete boat ramp at Morse Lake in Wright County, near Belmond, Iowa.

Contact:
Don Labate
515-250-3714
Don.Labate@dnr.iowa.gov