PROJECTS LETTING -  April , 2019

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

APPANOOSE 19-05-04-06 Rathbun Hatchery Research Facility - Larval RAS Control/Alarm Panel-2019-04-18   Bid Completion detail
HENRY 18-06-44-05 Geode State Park - Lake Geode Spillway Repairs-2019-04-18   Bid Completion detail
HENRY 17-06-44-06 Geode State Park - Mechanical Dredging and Shoreline Armoring Rebid-2019-04-18   Bid Completion detail
MONTGOMERY 19-04-69-04 Viking Lake State Park - Office & Storage Building Pavement-2019-04-18   Bid Completion detail
CLAY 19-01-21-01 Dewey's Pasture Wetland Complex - Evans Tract Wetland Restoration-2019-04-25   Bid Completion detail




HENRY -- PROJECT # 18-06-44-05                4/18/2019                Large Project Letting
GEODE STATE PARK
LAKE GEODE SPILLWAY REPAIRS
Proposal Guarantee: $25,000
Completion Date: 9/15/2019

   This project consists of partial depth repair of the spillway weir, full slab replacement of the control section, and cleaning and sealing the existing joints.

ESTIMATED QUANTITIES:
    Partial Depth Concrete Repair, Spillway Weir     510 S.F.
    Structural Concrete, Spillway Slap, Upper     7,565 S.F.
    Concrete Removal, Spillway Slab, Upper     7,565 S.F.
    Excavation, Spillway Slab, Upper     140 C.Y.
    Granular Backfill, Spillway Slab, Upper     140 C.Y.
    Subdrain, Spillway Slab, Upper     360 L.F.
    Flowable Fill, Spillway Void     30 C.Y.
    Joint Cleaning, Spillway Chute     1,500 L.F.
    Joint Sealant, Spillway Chute     1,500 L.F.
    Joint Edge Repair Grout, Spillway Chute     100 L.F.
    Mobilization     1 L.S.
    Traffic Control     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




HENRY -- PROJECT # 17-06-44-06                4/18/2019                Large Project Letting
GEODE STATE PARK
MECHANICAL DREDGING AND SHORELINE ARMORING REBID
Proposal Guarantee: $150,000
Completion Date: 3/31/2020

   This project consists of removing approximately 120,000 CY of sediment from the upper end, shoreline armoring in various locations, constructing a rock silt dike, and constructing an in-lake silt dam.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Class 10 Excavation (Sediment Removal)     120,000 B.C.Y.
    Class 10 Excavation (Embankment Fill)     36,653 C.Y.
    Class 10 Excavation (Haul Road Removal)     10,000 C.Y.
    Revetment, Class E     13,440 Tons
    Shot Rock (Habitat)     4,874 Tons
    Engineering Fabric     8,277 S.Y.
    Pavement Removal     2,773 S.Y.
    5" Reinforced PCC     189 S.Y.
    Granular Subbase     60 Tons
    Traffic Control     1 L.S.
    Flaggers     26 Each
    Cable Barrier - Work Around or Replace     1 L.S.
    Willow Clearing     1.2 Acres
    Emergent Wetland Seeding     1.2 Acres
    Silt Fence     1,132 L.F.
    Seeding and Fertilizing - IDOT Rural Mix     2.9 Acres
    Seeding and Fertilizing - Special Stabilizing Crop     3.5 Acres
    Mulching     6.4 Acres
    Class A Crushed Stone     710 Tons
    Full Depth Saw Cut     294 L.F.
    Sand     164 Tons
    Construction Survey     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




MONTGOMERY -- PROJECT # 19-04-69-04                4/18/2019                Large Project Letting
VIKING LAKE STATE PARK
OFFICE & STORAGE BUILDING PAVEMENT
Proposal Guarantee: $6,250
Completion Date: 11/8/2019

   This project consists of installing portland cement concrete pavement for a proposed building and 2 paved handicapped parking spaces at the boat ramp parking area located at Viking Lake State Park in Montgomery County, Iowa and includes grading, subgrade preparation, installing reinforced portland cement concrete pavement for a loop drive along with parking areas and an access lane, installing a reinforced portland cement concrete sidewalk, installing precast concrete wheel stops and pavement markings and handicap signage for the parking areas.

ESTIMATED QUANTITIES:
    Grading     1 L.S.
    Full Depth Saw Cut     25 L.F.
    Subgrade Preparation     1,342 S.Y.
    Granular Subbase     431 Tons
    6-inch Reinforced PCC Pavement     1,219 S.Y.
    5-inch Reinforced PCC Sidewalk     28 S.Y.
    Precast Concrete Parking Wheel Stops     4 Each
    Parking Space Paint Striping & Handicap Markings     1 L.S.
    Handicap Signage     1 L.S.
    Construction Staking     1 L.S.
    Site Restoration     1 L.S.
    Traffic Control     1 L.S.
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 19-05-04-06                4/18/2019                Small Project Letting
RATHBUN HATCHERY RESEARCH FACILITY
LARVAL RAS CONTROL/ALARM PANEL
Proposal Guarantee: $0
Completion Date: 7/19/2019

   A new Recirculation Aquaculture System was built at the Rathbun Fish Culture Research Facility to experimentally grow fish. All water processes are dependent on equipment operation. As such, power loss and equipment failures can result in fish death. Essential equipment will be monitored by a new Dedicated Operator Interface (DOI) that communicates with existing DOI and PLC programs to call out in the event of an alarm condition. Additionally, the DOI will control a new style of feeders that requires a program and power control system.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




CLAY -- PROJECT # 19-01-21-01                4/25/2019                Small Project Letting
DEWEY'S PASTURE WETLAND COMPLEX
EVANS TRACT WETLAND RESTORATION
Proposal Guarantee: $0
Completion Date: 11/1/2019

   This project is designed to restore a 3.5 acre wetland that is currently drained by a drainage ditch on the Evans Tract of land in the Dewey's Pasture Wetland Complex, Clay County, Iowa. Work under this project includes embankment (dike construction), tile investigation, tile breaks, pipe installation, and an Agri Drain inline water control structure.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov