PROJECTS LETTING -  February , 2021

 
 
bid envelopes

 
 

The following projects are currently advertised for bids. Interested bidders may find general information about each project, as well as printable actual Contract Documents in PDF format. The general information is the same project description provided to Newspapers and by direct mail solicitations. The Contract Documents include the Drawings and the entire Project Manual.  Drawings can be printed on any regular or large format printers. The Project Manual includes Proposal Forms,  Front End Documents, General and Supplementary Covenants, and Technical specifications. All these are also completely printable.

Effective October 2009, the Department will no longer be responsible for providing hard copy notice to bidders or addenda to either contractors or plan rooms. An email listserv has been created to communicate electronically with vendors currently on file with the DNR. As a member of this listserv, you will receive electronic notice to bidder information on a regular basis. To subscribe to this list, click here.

The Department will be utilizing the vendor Beeline and Blue to provide printed copies of Plans and Specifications and Addenda upon request. The department will no longer provide complimentary copies of Plans and Specifications to contractors or sub-contractors after award of the contract. Please visit dfs.beelineandblue.com/iowa or contact (515) 244-1611 for more information.

To access any of these, unless you have already done so, you will need to download and install Acrobat Reader from the Adobe Website. 
You may obtain a free download from
 

Click on the project names below to view the one(s) which interest you.

DAVIS 21-05-26-01 Lake Wapello State Park - Parking Lot Painting-2021-02-04   Bid Completion detail
DICKINSON 21-01-30-06 Kettleson Hogsback Complex - Hogsback Facility House Demolition-2021-02-04   Bid Completion detail
PALO ALTO 16-01-74-01 Silver Lake (Palo Alto) - Silver Lake Shoreline Armoring-2021-02-11   Bid Completion detail
APPANOOSE 20-05-04-06 Honey Creek State Park - Wastewater Conveyance System-2021-02-18   Bid Completion detail
APPANOOSE 20-05-04-05 Rathbun Wildlife Management Unit - Road Maintenance-2021-02-18   Bid Completion detail
DICKINSON 21-01-30-10 Spirit Lake Fish Hatchery - Pond Filter System - REBID-2021-02-18   Bid Completion detail
DICKINSON 21-01-30-11 Spirit Lake Fish Hatchery - Upgrade for RAS System Rebid-2021-02-18   Bid Completion detail
DICKINSON 19-01-30-08 Spirit Lake Fish Hatchery - Intake Improvements Rebid-2021-02-18   Bid Completion detail
LOUISA 20-06-58-01 Klum Lake Access - Road Maintenance-2021-02-18   Bid Completion detail
DICKINSON 20-01-30-19 Rogers WPA & Center Lake WMA - Water Control Structure Replacements-2021-02-25   Bid Completion detail
EMMET 20-01-32-03 Prairie Lakes Wildlife Management Unit - Prairie Lakes WMU Road Maintenance-2021-02-25   Bid Completion detail
JACKSON 21-06-49-02 Maquoketa Caves State Park - Residence Leach Field-2021-02-25   Bid Completion detail




APPANOOSE -- PROJECT # 20-05-04-06                2/18/2021                Large Project Letting
HONEY CREEK STATE PARK
WASTEWATER CONVEYANCE SYSTEM
Proposal Guarantee: $12,500
Completion Date: 8/31/2021

   This project consists of installing two new duplex lift stations at two locations and installing two new forcemains to convey the wastewater to the central lagoon system.

ESTIMATED QUANTITIES:
    MOBILIZATION     1 L.S.
    4-INCH SANITARY SEWER SERVICE (PVC SCH 40) WITH CONNECTIONS     20 L.F.
    REMOVE & PLUG 8" SEWER AT MH 11     1 L.S.
    INSTALL NEW DUPLEX LIFT STATION COMPLETE WITH CONTROLS & VALVE PIT     1 L.S.
    ELECTRICAL CONNECTION FROM TRANSFORMER (APROX. 50 FT.)     1 L.S.
    3 INCH HDPE DR 11 FORCEMAIN WITH #12 TRACER WIRE     3,289 L.F.
    AIR RELIEF VALVE COMPLETE WITH MANHOLE     1 L.S.
    CONNECT FORCEMAIN WITH MH No. 2     2 Each
    DISCONNECT AND PLUG 8" SEWER AT MH No. 2     1 L.S.
    REPLACE CONE SECTION OF MH No.2, 48" DIA     1 L.S.
    REPLACE EXISTING SEWER BETWEEN MH 16 TO MH 15 & MH 15 TO PROPOSED LIFT STATION (INCLUDING CONNECTIONS) WITH 4"PVC SCH 40.     307 L.F.
    REMOVE MH 14 & DISPOSE OFF SITE     1 L.S.
    INSTALL NEW E-ONE SIMPLEX LIFT STATION WITH CONTROLLER (OR APPROVED EQUIVALENT)     1 L.S.
    ELECTRICAL CONNECTION FROM TRANSFORMER (APROX. 100 FT.)     1 L.S.
    2 INCH HDPE DR 11 FORCEMAIN WITH #12 TRACER WIRE     1,094 L.F.
    AIR RELIEF VALVE COMPLETE WITH MANHOLE     1 L.S.
    SITE RESTORATION FOR COMPLETE SITE     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




APPANOOSE -- PROJECT # 20-05-04-05                2/18/2021                Large Project Letting
RATHBUN WILDLIFE MANAGEMENT UNIT
ROAD MAINTENANCE
Proposal Guarantee: $12,500
Completion Date: 9/30/2021

   This project consists of granular roadway maintenance - blading/shaping of roadway, culvert removal/installation, spreading new rock and the installation of revetment and erosion stone.

ESTIMATED QUANTITIES:
    2102 - SPECIAL BACKFILL     25.4 Tons
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING     91 STA.
    2312 - GRANULAR SURFACING ON ROAD, 1.5-INCH CRUSHED STONE     2,060 Tons
    2312 - GRANULAR SURFACING ON ROAD, 3-INCH CRUSHED STONE     290 Tons
    2416 - APRON, CONC, 18"     2 Each
    2416 - APRON, CONC, 24"     2 Each
    2416 - CULV, CONC RDWY PIPE, 18"     60 L.F.
    2416 - CULV, CONC RDWY PIPE, 24"     80 L.F.
    2507 - ENGINEERING FABRIC     89 S.Y.
    2507 - REVETMENT, CLASS D or E     18 Tons
    2507 - EROSION STONE     10 Tons
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 21-01-30-10                2/18/2021                Large Project Letting
SPIRIT LAKE FISH HATCHERY
POND FILTER SYSTEM - REBID
Proposal Guarantee: $6,250
Completion Date: 2/28/2022

   Currently the hatchery pulls water from Big Spirit Lake via a holding pond on the hatchery grounds. This pond fills with particulate and other debris that is supposed to be filter through a rock filter built in the 1960's. However, this rock filter is not working properly and allows large particulate to enter the intake pipe and into the hatchery plugging pipes and degrading water quality. This project will build an earth jetty and a concrete structure to house a new traveling screen water filter system. This system is a conveyor belt system driven by an electric motor to remove debris before it travels through the intake pipe.

ESTIMATED QUANTITIES:
    Demolition     1 L.S.
    Earth Jetty     265 C.Y.
    Concrete Structure and Accessories     1 L.S.
    Traveling Water Screen Filter     1 L.S.
    Electrical     1 L.S.
    Restoration     1 L.S.
    Fencing and Gate     1 L.S.
    Tree Stump Grinding     1 L.S.
    Dewatering/Coffer Dam     1 L.S.
    12" CMP (16 GA Aluminized Type 2)     25 L.F.
    Class D Riprap and Fabric     125 Tons
    Class A Surfacing Stone     25 Tons
    Mobilization     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 21-01-30-11                2/18/2021                Large Project Letting
SPIRIT LAKE FISH HATCHERY
UPGRADE FOR RAS SYSTEM REBID
Proposal Guarantee: $50,000
Completion Date: 2/14/2022

   The purpose of this contract is to upgrade the existing Recirculating Aquaculture System (RAS).

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Demolition     1 L.S.
    Structural     1 L.S.
    Architectural     1 L.S.
    Plumbing & Process     1 L.S.
    Electrical     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DICKINSON -- PROJECT # 19-01-30-08                2/18/2021                Large Project Letting
SPIRIT LAKE FISH HATCHERY
INTAKE IMPROVEMENTS REBID
Proposal Guarantee: $12,500
Completion Date: 2/1/2022

   This project consists of removing and replacing the existing in-lake water inlet.

ESTIMATED QUANTITIES:
    Mobilization     1 L.S.
    Removal 20" Intake Screen and Pipe     1 L.S.
    High Capacity Intake Screen     1 Each
    Pipe and Fittings     1 L.S.
    Concrete Block     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




LOUISA -- PROJECT # 20-06-58-01                2/18/2021                Large Project Letting
KLUM LAKE ACCESS
ROAD MAINTENANCE
Proposal Guarantee: $6,250
Completion Date: 9/30/2021

   This project consists of granular roadway maintenance - blading/shaping, ditch cleaning, removal and replacement of RCP culverts, flapper, and spreading new rock.

ESTIMATED QUANTITIES:
    2125 - RESHAPING DITCHES     7.7 STA.
    2127 - RECONSTRUCTION OF ROADBED - BLADING/SHAPING     85.7 STA.
    2312 - GRANULAR SURFACING ON ROAD, CLASS A CRUSHED STONE     1,599 Tons
    2416 - APRON, CONC, 18"     4 Each
    2416 - APRON, CONC, 36"     1 Each
    2416 - 36" FLAPPER, HEAVY DUTY     1 Each
    2416 - CULV, CONC RDWY PIPE, 18"     66 L.F.
    2416 - CULV, CONC RDWY PIPE, 36"     36 L.F.
    2507 - ENGINEERING FABRIC     45 S.Y.
    2507 - REVETMENT, CLASS D or E     10 Tons
    2507 - EROSION STONE     10 Tons
    2528 - TRAFFIC CONTROL     1 L.S.
    2533 - MOBILIZATION     1 L.S.

notice to bidders

download plans and specs

Plans can be ordered by following this link: http://bit.ly/IADNRPlans

planholders list




DAVIS -- PROJECT # 21-05-26-01                2/4/2021                Small Project Letting
LAKE WAPELLO STATE PARK
PARKING LOT PAINTING
Proposal Guarantee: $0
Completion Date: 6/30/2021

   This project consists of painting approximately 750 feet of parking lines in a parking lot. Send an email to request project documents.

Contact:
Jason Kruse
(515) 250-3707
jason.kruse@dnr.iowa.gov




DICKINSON -- PROJECT # 21-01-30-06                2/4/2021                Small Project Letting
KETTLESON HOGSBACK COMPLEX
HOGSBACK FACILITY HOUSE DEMOLITION
Proposal Guarantee: $0
Completion Date: 6/30/2021

   The intent of this project is the demolition, disposal, and site restoration of a residential house structure located on the Kettleson Hogsback Wildlife Area, in Dickinson County. The structure, including basement walls and floor, shall be demolished and removed from the site.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




PALO ALTO -- PROJECT # 16-01-74-01                2/11/2021                Small Project Letting
SILVER LAKE (PALO ALTO)
SILVER LAKE SHORELINE ARMORING
Proposal Guarantee: $0
Completion Date: 6/4/2021

   This project is designed to add erosion protection via fieldstone revetment to a section of shoreline at Silver Lake in Palo Alto County, IA. Work under this contract involves supply and installation of 575 TN of fieldstone revetment along approximately 500 lineal feet of shoreline. Also included is the supply and install of a granular surfacing section adjacent to the existing boat ramp.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




DICKINSON -- PROJECT # 20-01-30-19                2/25/2021                Small Project Letting
ROGERS WPA & CENTER LAKE WMA
WATER CONTROL STRUCTURE REPLACEMENTS
Proposal Guarantee: $0
Completion Date: 6/30/2021

   This project is designed to replace two existing water control structures on two separate wetlands within the Iowa Great Lakes Wildlife Unit in Dickinson County, Iowa. Work under this project includes removal of two "Wisconsin" Style Water Control Structures (WCS), and installation of two new corrugated metal pipe structures (same general configuration as those removed). Other work includes earthfill (backfill & dike repair), Rip Rap outlet protection, seeding, and erosion control.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




EMMET -- PROJECT # 20-01-32-03                2/25/2021                Small Project Letting
PRAIRIE LAKES WILDLIFE MANAGEMENT UNIT
PRAIRIE LAKES WMU ROAD MAINTENANCE
Proposal Guarantee: $0
Completion Date: 6/30/2021

   This project is designed to repair surface drainage issues and add granular surfacing to three separate roadway sections within the Prairie Lakes Wildlife Management Unit (WMU). The three locations are; Grass Lake WMA, East Swan Lake WMA, and Ingham-High WMA, all in Emmet County, Iowa. Work under this project includes blading and shaping of the existing granular roadways to establish positive drainage and then installation of Class "A" stone surfacing.

Contact:
Jeff Felts
515-250-3712
Jeff.Felts@dnr.iowa.gov




JACKSON -- PROJECT # 21-06-49-02                2/25/2021                Small Project Letting
MAQUOKETA CAVES STATE PARK
RESIDENCE LEACH FIELD
Proposal Guarantee:
Completion Date: 5/28/2021

   Project includes construction of a septic leach field for the residence at Maquoketa Caves State Park.

Contact:
Michael Dufoe
515-985-9196
Michael.dufoe@dnr.iowa.gov