The following are the results of bids received September, 2021 for public improvement projects which the Iowa Department of Natural Resources requires to be constructed. The results included below are the bids that were received timely. Consistent with the Specifications Manual, in the event of a discrepancy between a unit price, extensions or total amounts of bid, the unit price proposed by the bidder has been used to accurately calculate the total price based on the quantities identified in the project specifications.
NO DETERMINATION HAS BEEN MADE BY THIS PUBLICATION AS TO WHICH BID, IF ANY, IS THE LOWEST RESPONSIBLE, RESPONSIVE BID. THE DNR RESERVES THE RIGHT, AFTER REVIEW OF THE BIDS SUBMITTED, TO AWARD A CONTRACT FOR THE PROJECTS LISTED BELOW TO THE ENTITY SUBMITTING THE LOWEST RESPONSIBLE, RESPONSIVE BID OR TO REJECT ALL BIDS.
View Project Details for this Bid Letting
| UNION -- PROJECT # 19-04-88-01 9/23/2021 Large Project Letting
| THREE MILE LAKE
| LAKE RESTORATION PHASE 1 | | BIDS RECEIVED: |
Keller Excavating, Inc.
|
$387,868.20 |
RW Excavating Solutions, LC
|
$452,663.70 |
The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low. JNC Construction LLC
DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.
|
| WINNESHIEK -- PROJECT # 19-03-96-03 9/9/2021 Small Project Letting
| CHUCK GIPP DECORAH FISH HATCHERY
| REMOVE SEDIMENT | | BIDS RECEIVED: |
David Ryan Construction
|
$39,700.00 |
JB Holland Construction Inc.
|
$48,800.00 |
Skyline Construction Inc.
|
$59,325.00 |
|
| MARION -- PROJECT # 21-05-63-01 9/16/2021 Small Project Letting
| RED ROCK WILDLIFE UNIT
| O.K. HILL BOAT RAMP RENOVATION | | BIDS RECEIVED: |
Sterk Excavating Inc
|
$48,551.66 |
Iron Hill Contruction LLC
|
$63,583.00 |
IA Builders LLC
|
$87,731.56 |
Boyle Built Enterprises LLC
|
$119,602.53 |
TK Concrete, Inc.
|
$156,525.00 |
|
| CLAYTON -- PROJECT # 21-03-22-03 9/23/2021 Small Project Letting
| GUTTENBERG FISH HATCHERY
| WINDOW AND DOOR REPLACEMENT | | BIDS RECEIVED: |
Loecke Building Service, Inc.
|
$51,733.00 |
Iron Hill Contruction LLC
|
$59,355.00 |
Sheets Design Build, LLC
|
$81,730.00 |
Timekey Enterprise, LLC
|
$89,235.00 |
|
| FREMONT -- PROJECT # 20-04-36-05 9/23/2021 Small Project Letting
| WAUBONSIE STATE PARK
| CULVERT EXTENSION AND REPAIR REBID | | BIDS RECEIVED: |
Armodus, LLC
|
$56,665.00 |
Austin K Reeves Inc.
|
$61,941.50 |
TEK Builder LLC
|
$62,312.00 |
|
|