The following are the results of bids received July, 2020 for public improvement projects which the Iowa Department of Natural Resources requires to be constructed. The results included below are the bids that were received timely. Consistent with the Specifications Manual, in the event of a discrepancy between a unit price, extensions or total amounts of bid, the unit price proposed by the bidder has been used to accurately calculate the total price based on the quantities identified in the project specifications.
NO DETERMINATION HAS BEEN MADE BY THIS PUBLICATION AS TO WHICH BID, IF ANY, IS THE LOWEST RESPONSIBLE, RESPONSIVE BID. THE DNR RESERVES THE RIGHT, AFTER REVIEW OF THE BIDS SUBMITTED, TO AWARD A CONTRACT FOR THE PROJECTS LISTED BELOW TO THE ENTITY SUBMITTING THE LOWEST RESPONSIBLE, RESPONSIVE BID OR TO REJECT ALL BIDS.
View Project Details for this Bid Letting
| CASS -- PROJECT # 20-04-15-03 7/23/2020 Large Project Letting
| COLD SPRINGS DISTRICT OFFICE
| PAVEMENT REPLACEMENT | | BIDS RECEIVED: |
United Construction Services Corporation
|
$146,921.85 |
Caliber Concrete LLC
|
$148,049.84 |
Carley Construction LLC
|
$167,719.55 |
Howrey Construction, Inc.
|
$201,763.50 |
The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low. Henningsen Construction
DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.
|
| GUTHRIE -- PROJECT # 20-04-39-04 7/9/2020 Small Project Letting
| SPRINGBROOK STATE PARK
| CABIN RETAINING WALL REBID | | BIDS RECEIVED: |
CCD Yard Services
|
$31,170.00 |
Distinctive Landscapes
|
$15,667,507.34 |
|
| CERRO GORDO -- PROJECT # 19-03-17-03 7/16/2020 Small Project Letting
| VENTURA ACCESS
| BOAT RAMP REPLACEMENT TWO LANES | | BIDS RECEIVED: |
Larson Contracting Central LLC
|
$73,953.01 |
2 Men And A Hoe LLC
|
$89,049.50 |
Dean Snyder Construction
|
$160,000.00 |
|
| ALLAMAKEE -- PROJECT # 19-03-03-01 7/30/2020 Small Project Letting
| 565 WATERLOO CR. DRIVE, DORCHESTER
| WATERLOO CREEK PARKING LOT | | BIDS RECEIVED: |
Riehm Construction
|
$24,182.25 |
Ethan Koehn Construction
|
$28,343.50 |
Matt Construction, Inc.
|
$30,270.00 |
David Ryan Construction
|
$35,994.50 |
|
| DAVIS -- PROJECT # 20-05-26-03 7/30/2020 Small Project Letting
| LAKE WAPELLO STATE PARK
| ADA CONCRETE PARKING STALL AND SIDEWALK | | BIDS RECEIVED: |
Haworth Land Construction
|
$4,000.00 |
Kinman Co Inc.
|
$4,999.90 |
Sterk Excavating Inc
|
$6,202.00 |
TK Concrete, Inc.
|
$12,830.00 |
|
| WINNESHIEK -- PROJECT # 18-03-96-03 7/30/2020 Small Project Letting
| DECORAH FISHERIES MANAGEMENT UNIT
| PINE SPRING CREEK AAP PARKING | | BIDS RECEIVED: |
Riehm Construction
|
$32,557.95 |
Ethan Koehn Construction
|
$33,976.15 |
Matt Construction, Inc.
|
$36,765.00 |
David Ryan Construction
|
$37,421.10 |
|
|