The following are the results of bids received June, 2022 for public improvement projects which the Iowa Department of Natural Resources requires to be constructed.  The results included below are the bids that were received timely. Consistent with the Specifications Manual, in the event of a discrepancy between a unit price, extensions or total amounts of bid, the unit price proposed by the bidder has been used to accurately calculate the total price based on the quantities identified in the project specifications.

NO DETERMINATION HAS BEEN MADE BY THIS PUBLICATION AS TO WHICH BID, IF ANY, IS THE LOWEST RESPONSIBLE, RESPONSIVE BID. THE DNR RESERVES THE RIGHT, AFTER REVIEW OF THE BIDS SUBMITTED, TO AWARD A CONTRACT FOR THE PROJECTS LISTED BELOW TO THE ENTITY SUBMITTING THE LOWEST RESPONSIBLE, RESPONSIVE BID OR TO REJECT ALL BIDS.
 

 View Project Details for this Bid Letting




LEE -- PROJECT # 20-06-56-01                6/16/2022                Large Project Letting
SHIMEK STATE FOREST
ROAD MAINTENANCE
 
BIDS RECEIVED:
    Cole Construction Co, Inc 
$94,240.00 


full bid tab




CLAY -- PROJECT # 22-01-21-01                6/9/2022                Small Project Letting
SMITH SLOUGH WMA
WATER CONTROL STRUCTURE MODIFICATION & CHANNEL CLEANING
 
BIDS RECEIVED:
    Mitchell & Huss Excavation 
$24,600.00 
    BLAC Construction LLC 
$34,800.00 
    Empire Excavation 
$34,800.00 
    BD Construction Services LLC 
$53,440.00 


full bid tab




CLAYTON -- PROJECT # 23-03-22-01                6/16/2022                Small Project Letting
PIKES PEAK STATE PARK
FUELING STATION REPLACEMENT
 
BIDS RECEIVED:
    David Ryan Construction 
$23,500.00 
    Acterra Group Inc 
$32,140.00 

The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low.
   Matt Construstion Inc

DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.


full bid tab




DELAWARE -- PROJECT # 22-03-28-02                6/30/2022                Small Project Letting
MAQUOKETA WILDLIFE UNIT
BUILDING FOUNDATION & FLOOR
 
BIDS RECEIVED:
    Matt Construction Inc 
$40,369.41 
    Browns Pump Srv & Excavating 
$41,294.25 


full bid tab