The following are the results of bids received February, 2018 for public improvement projects which the Iowa Department of Natural Resources requires to be constructed. The results included below are the bids that were received timely. Consistent with the Specifications Manual, in the event of a discrepancy between a unit price, extensions or total amounts of bid, the unit price proposed by the bidder has been used to accurately calculate the total price based on the quantities identified in the project specifications.
NO DETERMINATION HAS BEEN MADE BY THIS PUBLICATION AS TO WHICH BID, IF ANY, IS THE LOWEST RESPONSIBLE, RESPONSIVE BID. THE DNR RESERVES THE RIGHT, AFTER REVIEW OF THE BIDS SUBMITTED, TO AWARD A CONTRACT FOR THE PROJECTS LISTED BELOW TO THE ENTITY SUBMITTING THE LOWEST RESPONSIBLE, RESPONSIVE BID OR TO REJECT ALL BIDS.
View Project Details for this Bid Letting
| DICKINSON -- PROJECT # 17-01-30-04 2/1/2018 Large Project Letting
| MARBLE BEACH
| CAMPGROUND RENOVATION | | BIDS RECEIVED: |
Diamond Concrete and Construction, Inc.
|
$3,148,771.75 |
Crow River Construction
|
$3,273,197.72 |
Beck Excavating Inc.
|
$3,368,352.93 |
|
| WRIGHT -- PROJECT # 18-02-99-02 2/1/2018 Small Project Letting
| ELM LAKE WMA
| ROCK REEF FISH BARRIER | | BIDS RECEIVED: |
Superior Seawalls, Docks and Dredge
|
$17,575.00 |
Richards Construction Co., Inc.
|
$17,830.00 |
|
| JONES -- PROJECT # 18-06-53-03 2/7/2018 Small Project Letting
| WAPSIPINICON
| REWIRE PARK RESIDENCE | | BIDS RECEIVED: |
Delancey Electric
|
$9,891.00 |
|
| BREMER -- PROJECT # 18-03-09-05 2/22/2018 Small Project Letting
| SWEET MARSH WMA
| MARTINS LAKE DIKE REPAIR | | BIDS RECEIVED: |
Chad Heim Excavating and Trucking
|
$28,582.25 |
A & R Construction
|
$37,158.54 |
Matt Construction, Inc.
|
$37,415.25 |
Dan Oberbreckling Concrete & Excavating
|
$41,498.50 |
Crane Construction
|
$55,764.70 |
Walter Wenthold Excavating Inc
|
$60,247.75 |
Mehmert Tiling Inc.
|
$99,962.93 |
Smith Excavating Inc.
|
$126,935.00 |
Baker Enterprises, Inc.
|
$132,995.00 |
|
| WINNESHIEK -- PROJECT # 17-03-96-03 2/22/2018 Small Project Letting
| COON CREEK WMA
| LOWER DAM BANK STABILIZATION | | BIDS RECEIVED: |
Walter Wenthold Excavating Inc
|
$18,449.00 |
Donlon Brothers Construction LLC
|
$21,660.00 |
Matt Construction, Inc.
|
$22,700.00 |
Riehm Construction Co
|
$24,320.00 |
H & H Construction & Development LLC
|
$27,275.00 |
David Ryan Construction
|
$29,126.40 |
|
|