The following are the results of bids received February, 2016 for public improvement projects which the Iowa Department of Natural Resources requires to be constructed. The results included below are the bids that were received timely. Consistent with the Specifications Manual, in the event of a discrepancy between a unit price, extensions or total amounts of bid, the unit price proposed by the bidder has been used to accurately calculate the total price based on the quantities identified in the project specifications.
NO DETERMINATION HAS BEEN MADE BY THIS PUBLICATION AS TO WHICH BID, IF ANY, IS THE LOWEST RESPONSIBLE, RESPONSIVE BID. THE DNR RESERVES THE RIGHT, AFTER REVIEW OF THE BIDS SUBMITTED, TO AWARD A CONTRACT FOR THE PROJECTS LISTED BELOW TO THE ENTITY SUBMITTING THE LOWEST RESPONSIBLE, RESPONSIVE BID OR TO REJECT ALL BIDS.
View Project Details for this Bid Letting
| APPANOOSE -- PROJECT # 15-05-04-11 2/18/2016 Large Project Letting
| RATHBUN FISHERIES MANAGEMENT UNIT
| HOUSE RENOVATIONS REBID | | BIDS RECEIVED: |
Hymbaugh Construction
|
$221,400.00 |
Hartland Bobcat Services
|
$254,389.00 |
The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low. Granite Ridge Construction
Anchor Contractors LLC
DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.
|
| APPANOOSE -- PROJECT # 15-05-04-11 2/18/2016 Large Project Letting
| RATHBUN FISHERIES MANAGEMENT UNIT
| HOUSE RENOVATIONS REBID | | BIDS RECEIVED: |
Hartland Bobcat Services
|
$120,467.00 |
Hymbaugh Construction
|
$137,400.00 |
The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low. Anchor Contractors LLC
Granite Ridge Construction
DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.
|
| WASHINGTON -- PROJECT # 15-06-92-06 2/18/2016 Large Project Letting
| LAKE DARLING STATE PARK
| CABIN ROAD CONSTRUCTION | | BIDS RECEIVED: |
DeLong Construction, Inc.
|
$579,919.60 |
Muscatine Bridge Co., Inc.
|
$649,348.15 |
The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low. Spring Lake Construction
J & L Construction, LLC
DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.
|
| CLAYTON -- PROJECT # 13-03-22-01 2/18/2016 Small Project Letting
| MANCHESTER FISHERIES MANAGEMENT UNIT
| UPPER MAQUOKETA RIVER FISH HAB | | BIDS RECEIVED: |
Donlon Brothers Construction LLC
|
$19,485.50 |
Walter Wenthold Excavating Inc.
|
$21,843.30 |
Lansing Brothers Construction Co. Inc.
|
$24,790.00 |
Bacon Concrete, LLC
|
$27,322.00 |
Riehm Construction
|
$31,028.70 |
Faas Construction & Excavating
|
$50,779.00 |
Matt Construction Inc.
|
$52,820.00 |
Miller Trucking & Excavating
|
$54,985.00 |
Tschiggfrie Excavating
|
$77,407.85 |
The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low. Mark Fink
Brown's Pump Service & Excavating
DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.
|
| CLAYTON -- PROJECT # 16-03-22-01 2/18/2016 Small Project Letting
| PIKES PEAK STATE PARK
| REPLACE EXISTING ELECTRICAL PANEL | | BIDS RECEIVED: |
Palmer Electric LLC
|
$10,863.75 |
The following apparent low bidders were found to be Non-Responsive and/or Not Responsible. No determinations have been made regarding the Responsiveness and Responsibility of the bidders that are not the apparent low. Final Electric
DNR reserves the right to modify this list as it reviews and inspects the bids received. DNR will update the bid tab accordingly.
|
| DECATUR -- PROJECT # 16-05-27-01 2/18/2016 Small Project Letting
| NINE EAGLES STATE PARK
| GROUP CAMP SHELTER | | BIDS RECEIVED: |
Hartland Bobcat Services
|
$35,175.36 |
Hymbaugh Construction
|
$39,490.00 |
Granite Ridge Construction
|
$39,690.00 |
Anchor Contractors LLC
|
$44,860.00 |
Empire Construction and Trenching, Inc.
|
$47,138.00 |
Burkett Construction LLC
|
$49,656.00 |
|
| JOHNSON -- PROJECT # 15-06-52-07 2/24/2016 Small Project Letting
| HAWKEYE WILDLIFE MANAGEMENT AREA
| HAWKEYE SHOOTING RANGE TREE REMOVAL | | BIDS RECEIVED: |
CAJ Enterprises Inc. dba Chris Jones Trucking
|
$5,400.00 |
|
| MUSCATINE -- PROJECT # 10-06-70-04 2/24/2016 Small Project Letting
| WILDCAT DEN STATE PARK
| STORM SEWER | | BIDS RECEIVED: |
CAJ Enterprises Inc. dba Chris Jones Trucking
|
$3,424.08 |
|
|